ML20141F039
| ML20141F039 | |
| Person / Time | |
|---|---|
| Site: | U.S. Geological Survey |
| Issue date: | 05/14/1997 |
| From: | Timothy Debey INTERIOR, DEPT. OF, GEOLOGICAL SURVEY |
| To: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML20141F044 | List: |
| References | |
| NUDOCS 9705210189 | |
| Download: ML20141F039 (1) | |
Text
_
6 May 14, 1997 ;
Mr. Samuel Collins
' Director, Region IV j U.S. Nuclear' Regulatory' Commission 611 RyaniPlaza Dr.., Suite 400 -
Arlington,- -TX 76011
.i
Dear Mr. Collins:
)
Jul amended annual report of.the U.S.' Geological Survey TRIGA ]
reactor facility is. submitted in accordance with license
- conditions .. This-report replaces the report submitted dated January 18, 1997 and includes a' number of corrections,.some ;
editorial.and others of more substance. The most significant- ;
-changes are the correction of a decimal error inothe Ar-41' :
releases'and the inclusion of staff dose information-through -l 12/31/96. The facility docket number is 50-274. ;
Sincerely,
-d / d4 p/ +
. Tim DeBey Reactor Supervisor ,
l
/ :
/ )
1 l
' Enclosure I g,/
y Copy =to. ;
l
/' Document. Control Desk (2) 1 Mr. Blair Nicholas ngoO Q-S = -
USNRC: k 611.Ryan Plaza Dr . Suite'400 J
-Arlington LTX- 176011- ,
r 9705210'199 970514' L
-PDR ADOCK 05000274 .
R PDR H _,
,- ,