ML20141F039

From kanterella
Jump to navigation Jump to search
Forwards Amended Annual Rept of USGS Triga Reactor Facility, Replacing Rept & Including Number of Corrections
ML20141F039
Person / Time
Site: U.S. Geological Survey
Issue date: 05/14/1997
From: Timothy Debey
INTERIOR, DEPT. OF, GEOLOGICAL SURVEY
To: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20141F044 List:
References
NUDOCS 9705210189
Download: ML20141F039 (1)


Text

_

6 May 14, 1997  ;

Mr. Samuel Collins

' Director, Region IV j U.S. Nuclear' Regulatory' Commission 611 RyaniPlaza Dr.., Suite 400 -

Arlington,- -TX 76011

.i

Dear Mr. Collins:

)

Jul amended annual report of.the U.S.' Geological Survey TRIGA ]

reactor facility is. submitted in accordance with license

- conditions .. This-report replaces the report submitted dated January 18, 1997 and includes a' number of corrections,.some  ;

editorial.and others of more substance. The most significant-  ;

-changes are the correction of a decimal error inothe Ar-41'  :

releases'and the inclusion of staff dose information-through -l 12/31/96. The facility docket number is 50-274.  ;

Sincerely,

-d / d4 p/ +

. Tim DeBey Reactor Supervisor ,

l

/  :

/ )

1 l

' Enclosure I g,/

y Copy =to.  ;

l

/' Document. Control Desk (2) 1 Mr. Blair Nicholas ngoO Q-S = -

USNRC: k 611.Ryan Plaza Dr . Suite'400 J

-Arlington LTX- 176011- ,

r 9705210'199 970514' L

-PDR ADOCK 05000274 .

R PDR H _,

,- ,