Text
- . - - -, _ - _ . , -. ., .. . .. . .. . . . . _ _ . ~ ~. .- -
~-4
.ON
.. ( )
bA. Entsrgy operations, Inc.
h P. O. Box 756 Port Gbson, MS 39150 Tel 601437 2129 l
Joseph E. Venable General Manager Plant Operatons November 11, 1998 "'*""""""'**'**"
l.
l U.S. Nuclear Regulatory Commission Mail Station P1-137 Washington, D.C. 20555 Attention: Document Control Desk
SUBJECT:
Grand Gulf Nuclear Station Unit 1
[ Docket No. 50-416 License No. NPF-29 Monthly Operating Report GNRO-98/00093 t Gentlemen:
l In accordance with the requirement of Technical Specification 5.6.4, Entergy Operations is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit 1 for October 1998. .
- If you have any questions or require additional information, please contact this office.
Yours truly, M ,
l JEV/SDUcg attachments: 1. Operating Status
- 2. Average Daily Power Level
- 3. Unit Shutdown and Power Reductions
! cc: (See Next Page) l-i
..n i t- 4 ?
, b 't 1 J i 9g11200007 981031' 1 PDR ADOCK 05000416 R. PDR 1(
I 1
l-I I
... . . . - . ~_-. . . . . . . - . - . . . - .. - -_.
D GNRO-98/00093 Page 2 of 3 , ,
cc: Mr. D. C. Hintz (w/a)
Mr. N. S. Reynolds (w/a)
Mr. Jager Smith (w/a)
- Mr. H. L. Thomas (w/o)
Ms. K. D. Weaver (w/a)
Mr. Ellis W. Mershoff (w/a)
Regional Administrator U.S. Nuclear Regulatory Commission Region IV
. 611 Ryan Plaza Drive Suite 400 Arlington, TX 76011 Mr. Jack Donohew, Project Manager ,
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C. 20555 I
c - . - . - . - - . - . . .. . . . .-~ -.- - - . - . - . _ _ - -
, Attachment I to GNRO-98/00093 DOCKET NO 50-416 DATE 11/05/98 COMPLETED BY S. D. Lin TELEPHONE (601)437-6793 OPERATING STATUS
.l. Unit Name: GGNS UNIT 1
- 2. Reporting Period: October 1998
- 3. Licensed Thermal Power (MWt): 3833 MWT
- 4. Nameplate Rating (Gross MWe): 1372.5 MWE
- 5. . Design Electrical Rating (Net MWe): 1250 MWE
. 6. . Maximum Dependable Capacity (Gross MWe): 1254 MWE
- 7. Maximum Dependable Capacity (Net MWe): 1204 MWE
- 8. If changes occur in Capacity Ratings (Items 3 through 7) Since Last Report. Give Reason:
- 9. Power Level To Which Restricted, if Any (Net MWe): N/A
- 10. Reasons For Restrictions, If Any: N/A This Month Yr to Date Cumulative *
- 11. Hours in Reporting Period 745 7,296 123,016
- 12. Number of Hours Reactor was Critical 745.0 6,320.5 103,059.5
- 13. Reactor Reserve Shutdown Hours 0 0 0
- 14. - Hours Generator On-Line 745.0 6,178.3 99,815.2
- 15. Unit Reserve Shutdown Hours 0 0 0
. 16. Gross Thermal Energy Generated (MWH) 2,801,303 22,871,668 359,281,963
- 17. Gross Electrical Energy Generated (MWH) 950,169 7,649,490 116,168,290
- 18. Net Electrical Energy Generated (MWH) 913,924 7,349,300 111,391,209
- 19. ' Unit Service Factor 100.0 84.7 82.8
- 20. Unit Availability Factor 100.0 84.7 82.8
- 21. Unit Capacity Factor (Using MDC Net) 101.9 83.8 81.5
- 22. Unit Capacity Factor (Using DER Net) 98.1 80.6 75.0
- 23. Unit Forced Outage Rate 0. 3.9 5.6
- 24. ' Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): None
. 25. If Shut Down At End of Report Period. Estimated Date of Startup: N/A
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 08/18/82 INITIAL ELECTRICITY 10/20/84 COMMERCIAL OPERATION 07/01/85
- Items 11 through 18 are cumulative results since initial electricity
. ,. . . . .m . ~_ . . _ . _ _ . . . _ . - ..._.....__._._.__....m _ _ - . . _ . . _ _ . _ . . _ _ . . . _ . . . - . . . - ~
b E
a
., Attachment 2 to GNRO-98/00093
- 6 -
l DOCKET NO 50-416
~ ' '
DATE 1I/05/98 COMPLETED BY S. D. Lin TELEPHONE (601) 437-6793 l
MONTH: October 1998 DAY AVERAGE DA?LY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) l l
1 1227 ' 17 1246 l' 2- 1230 18 1243 i 3 1161 19 1251 l- -
\
l:- 4 1240 20 1259 l
5 1237 21 615 l-6 1239 22 . 1241
.7 1256' 23 1272 8 '1261~ 24 1227 i
l- 9- 1265 25 1265 l'
-10 -1240 26 1259 1259' 27 11 1260
)
- 12" 1256 28 1260 13 - '1255 29 1254 1
-14 1255 30 1251 l- .15 1250 31 1251 l
=
_16 1242 L !
i ;
l l
L l~
. I
Attachment 3 to GNRO-98/00093 ,
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MON 1H October 1998 No. Date Type (1) Duration Reason Method Of Licensee Event System Code Component Cause & Corrective Action To Prevent Hours (2) Shutting Down Report # (4)' Code (5) Recurrence (C&CA)
Reactor (3)98-011 10/21/98 F 0. A 6 N/A N/A N/A Power reduced to approximately 50%
when circulating Water Pump "A" tripped because of burned electrical lead.
I 2 3 4 5 F: Forced Reason: Method: Exhibit G - Instructions for Preparation of . Exhibit 1 - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry Sheets for Licensee Event B-Maintenance or Test 2-Manual Scram Report (LER) File (NUREG-0161)
C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continued E-Operator Training & 5-Reduced load Licensing Examination 6-Other !
F-Administrative G-Operational Error (Explain)
H-Other (Explain) _