ML20209G808

From kanterella
Revision as of 04:13, 5 December 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Amend 35 to License NPF-22 & Safety Evaluation. Amend Revises Tech Specs to Permit Raising Main Steam Line Radiation Monitor Tech Spec Setpoint from Three Times Background to Seven Times Background Radiation
ML20209G808
Person / Time
Site: Susquehanna 
Issue date: 04/22/1987
From: Butler W
Office of Nuclear Reactor Regulation
To: Keiser H
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML20209G815 List:
References
NUDOCS 8705010074
Download: ML20209G808 (3)


Text

.- ~.

April 22, 1987

. Docket No. 50-388

[

Mr. Harold W. Keiser Vice President-

, Nuclear Operations-Pennsylvania Power and Light Company 2 North Ninth Street

Allentown, Pennsylvania 18101

Dear Mr. Keiser:

Subject:

Issuance of Amendment No. 35 to Facility Operating License

. No. NPF Susquehanna Steam Electric Station, Unit 2 The Nuclear Regulatory Commission has issued the enclosed Amendment No.35 to Facility Operating License No. NPF-22 for the Susquehanna Steam Electric Station, Unit 2. This amendment is in response to your letter dated June 23, 1986.

This amendment revises the Susquehanna Unit 2 Technical Specifications to permit raising the Main Steam Line Radiation Monitor Technical Specification setpoint from three times the background to seven times the background radiation.

A copy of the related safety evaluation supporting Amendment No. 35 to Facility Operating License No. NPF-22 is enclosed.

Sincerely,

/s/

i Walter R. Butler, Director Project Directorate No.'I-2 Division of Reactor Projects - I/II

Enclosures:

1. Amendment No. 35 to NPF-22
2. Safety Evaluation
cc w/ enclosures

See next page 1

l I

  • NOTE: PREVIOUSLY CONCURRED 4

l

LA:BWD-3: DBL BWD-3: DBL D:BWD-3: DBL D:PD-I-2 O
  • EHylton/hmc *MThadani *EAdensam WButler /

2/25/87 2/26/87 2/26/87 4/2 2/87 I'

B705010074 870422 PDR ADOCK 05000388 1 p PDR l

( _

/ 'o

", UNITED STATES l' t NUCLEAR REGULATORY COMMISSION E WASHINGTON, D. C. 20555 April 22, 1987

%...../

Docket No. 50-388 -

Mr. Harold W. Keiser Vice President Nuclear Operations Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101

Dear Mr. Keiser:

Subject:

Issuance of Amendment No. 35 to Facility Operating License No. NPF Susquehanna Steam Electric Station, Unit 2 The Nuclear Regulatory Commission has issued the enclosed Amendment No. 35 to Facility Operating License No. NPF-22 for the Susquehanna Steam Electric Station, Unit 2. This amendment is in response to your letter dated June 23, 1986.

This amendment revises the Susquchanna Unit 2 Technical Specifications to permit raising the Main Steam Line Radiation Monitor Technical Specification setpoint from three times the background to seven times the background radiation.

A copy of the related safety evaluation supporting Amendment No. 35 to Facility Operating License No. NPF-22 is enclosed.

Sincerely,

.c

[ '/[/( . Ak Walter R. Butler, Director Project Directorate No. 1-2 Division of Reactor Projects - I/II

Enclosures:

1. Amendment No. 35 to NPF-22
2. Safety Evaluation cc w/ enclosures:

See next page 1

r Mr. Harold W. Keiser Susquehanna Steam Electric Station Pennsylvania Power & Light Company Units 1 & 2 CC*

Jay Silberg, Esq. Mr. W. H. Hirst, Manager Shaw, Pittman, Potts & Trowbridge Joint Generation 2300 N Street N.W. Projects Department Washington, D.C. 20037 Atlantic Electric P.O. Box 1500 Bryan A. Snapp, Esq. 1199 Black Horse Pike Assistant Corporate Counsel Pleasantville, New Jersey 08232 Pennsylvania Power & Light Company 2 North Ninth Street Regional Administrator, Region I Allentown, Pennsylvania 18101 U.S. Nuclear Regulatory Commission 631 Park Avenue Mr. E. A. Heckman King of Prussia, Pennsylvania 19406 Licensing Group Supervisor Pennsylvania Power A Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. Loren Plisco Resident Inspector P.O. Box 5?

Shickshinny, Pennsylvania 18655 Mr. R. J. Benich Services Pro.4ect Manager General Electric Company 1000 First Avenue King of Prussia, Pennsylvania 19406 Mr. Thomas M. Gerusky, Director Bureau of Radiation Protection Resources Commonwealth of Pennsylvania P. O. Box 2063 Harrisburo, Pennsylvania 17120 Robert W. Alder, Esquire Office of Attorney General P.O. Box 2357 Harrisburg, Pennsylvania 17120 Mr. Jesse C. Tilton III Allegheny Elec. Coorperative, Inc.

212 Locust Street P.O. Box 1266 Harrisburg, Pennsylvania 17108-1266

)