ML20211B808

From kanterella
Revision as of 00:04, 2 December 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 99900816/87-01 on 870112-14,notice of Violation & Notice of Nonconformance
ML20211B808
Person / Time
Issue date: 02/13/1987
From: Merschoff E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Jacqwan Walker
WEST JERSEY FLANGE (FORMERLY WEST JERSEY MANUFACTURIN
Shared Package
ML20211B812 List:
References
REF-PT21-87, REF-QA-99900816 NUDOCS 8702190563
Download: ML20211B808 (4)


Text

-

, ,- ;m UNITED STATES 2" " 'n NUCLEAR REGULATORY COMMISSION

. g a WASHINGTON, D. C. 20665

., p'

          • February 13, 1987 Docket No. 99900816/87-01 West Jersey Manufacturing Company ATTN: Joseph Walker, Sr.

President Post Office Box W Williamstown, New Jersey 08094 Gentlemen:

This refers to the inspection conducted by Mr. James T. Conway of this office on January 12-14, 1987, of your facility at Williamstown, New Jersey and to the discussions of the findings with you at the conclusion of the inspection.

The purpose of this inspection was to conduct a programmatic evaluation of the implementation of the QA program in the areas of procurement document control, control of purchased material and services, and audits. Areas examined during the inspection and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observatiocr by the inspector.

During the inspection it was found that the implementation of your QA program failed to meet certain NRC requirements. Significant items included failures to: (1) pass on 10 CFR Part 21 and QA program requirements to vendors; (2) use approved vendors, and; (3) have correct information on certified material test reports. The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.

The enclosed Notice of Violation is sent to you pursuant to the provisions of Section 206 of the Energy Reorganization Act of 1974. You are required to submit to this office within 30 days from the date of this letter a written statement containing: (1) a description of steps that have been or will be taken to correct these items; (2) a description of steps that have been or will be taken to prevent recurrence; and (3) the dates your corrective actions and preventive measures were or will be completed. Consideration may be given to extending your response time for good cause shown.

You are also requested to submit a similar written statement for each item which appears in the enclosed Notice of Nonconformance. The responser requested by this letter are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-11. In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of this letter tod the enclosed inspection report will be placed in the NRC's Public Document Rocn.

07Q2190563 B70213 ED fL.

G k W l 9 E N W J M C.

919 6 e 916 PD E

e-b,

- West Jersey Manufacturing Company February 13, 1987 Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, -

Ellis W. Merschoff, Acting Chief Vendor Program Branch Division of Quality Assurance, Vendor and Technical Training Center Programs Office of Inspection and Enforcement

Enclosures:

1. Appendix A-Notice of Violation
2. Appendix B-Notice of Nonconformance
3. Appendix C-Inspection Report No. 99900816/87-01 4 Appendix D-Inspection Data Sheets (one page)

m f e

West Jersey Manufacturing Company February 13, 1987 Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, S\

Ellis W. Merschoff, Acting Chief Vendor Program Branch Division of Quality Assurance, Vendor and Technical Training Center Programs Office of Inspection and Enforcement

Enclosures:

1. Appendix A-Notice of Violation
2. Appendix B-Notice of Nonconformance
3. Appendix C-Inspection Report No. 99900816/87-01
4. Appendix D-Inspection Data Sheets (one page)

DISTRIBUTION:

EOMB:IE:094 VPB Reading DQAVT Reading JTaylor BGrimes HMiller EMerschoff EBaker JConway (2)

LParker J

'QAVT PB DQAVT / B- AVT y:tt EBa -

. off

~

87 4/ 12./ 87

West Jersey Manufacturing Company February 13, 1987 k

Should you have any questions concerning this inspection, we will he pleased to discuss them with you.

Sincerely,

  • Ellis W. Merschoff, Acting Chief Vendor Program Branch Divisien of Quality Assurance, Vendor and Technical Training Center Programs Office of Inspection and Enforcement

Enclosures:

1. Appendix A-Notice of Violation ,
2. Appendix B-Notice of Nonconformance
3. Appendix C-Inspection Report No. 99900816/87-01
4. Appendix D-Inspection Data Sheets (one page)

DISTRIBUTION:

DMB:lE:09 VPB Reading DQAVT Reading JTaylor BGrimes HMiller EMerschoff EBaker JConway (2)

LParker

QAVT J

PB DQAVT ./ B- AVT y:tt EBa v r off gg 87 4/4

% az /87 w