ELV-00340, Forwards Revised Monthly Operating Rept for Jan 1989 & Monthly Operating Rept for Feb 1989 for Vogtle,Units 1 & 2
| ML20246L686 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 03/15/1989 |
| From: | Hairston W GEORGIA POWER CO. |
| To: | NRC |
| Shared Package | |
| ML20246L690 | List: |
| References | |
| 0199E, 199E, ELV-00340, ELV-340, NUDOCS 8903240247 | |
| Download: ML20246L686 (1) | |
Text
c . _.
cnga nw w ,
J3 Pat ,ce' A/
- %, Ai r'a. GE -y:yn 3.L
~
zw e ::c ,
as j
)
ec , un;;
. e: m ,a-j s
'_v it
.4 o~ j; q t 'f ') .T! fidf: . m' I
[tj i i C Q. ; ' M -- 4
- w. a. m u nan a see , va n 4 o
4* l It' . t C[f3 v t ELV-00340 March 15, 1989 0199e Director, Office of Resource Management U. S. Nuclear Regulatory Comission Washington, D. C. -20555 PLANT V0GTLE - UNITS 1, 2 NRC DOCKETS 50-424, 50-425 OPERATING LICENSES NPF-68, NPF-79
< MONTHLY OPERATING REPORTS Gentlemen:
Enclosed is a copy of the January, 1989 monthly operating report for Vogtle Unit 1 which has been updated to reflect revised plant operating information.
Also enclosed are the February, 1989 monthly operating reports for Vogtle Units 1 and 2. These reports are submitted in accordance with Technical Specification 6.8.1.5.
Sincerely, (A). .h 5 W. G. Hairston, III JH/gm
Enclosures:
- 1. Revised Unit 1 Monthly Operatjng Report for January, 1989
- 2. Unit 1 Monthly Operating Report for February, 1989
- 3. Unit 2 Monthly Operating Report for February, 1989 c(w): Georgia Power Company ,
Mr. P. D. Rice l Mr. C. K. McCoy Mr. J. P. Kane -
Mr. G. Bockhold, Jr.
NORMS U. S. Nuclear Regulatory Commission Mr. S. Ebneter, Regional Administrator Mr. J. B. Hopkins, Licensing Project Manager, NRR (2 copies)
Mr. J. F. Rogge, Senior Resident Inspector, Vogtle r
n p 8903240247 890315 E. 1 PDR ADOCK 05000424i R PDR % $\
e O
" ~
GEORGIA POWER COMPANY MONTHLY OPERATING DATA REPORTS PLANT V0GTLE UNITS 1 AND 2 mk 17,g.-en % SENWNMM :,
l '- 'l
, ~
\ ~ u --
\
%. t
- - *% 4 m
... g f ,
A -.~:c - /
g;R32a83S?!$s8sjk //
ENCLOSURE 1 PLANT V0GTLE - UNIT 1 i NRC DOCKET 50-424 l OPERATING LICENSE NPF-68 REVISED MONTHLY OPERATING REPORT FOR JANUARY, 1989 TABLE OF CONTENTS l
NARRATIVE REPORT Page El-1 OPERATING DATA REPORT Page El-2 AVERAGE DAILY POWER LEVEL Page El-3 UNIT SHUTDOWNS AND POWER LEVELS Page El-4
I NARRATIVE REPORT DOCKET N0. 50-424 l
UNIT 1 DATE: FEB 10, 1989 l COMPLETED BY: R. A. M0YE TELEPHONE: (404) 724-8114 x3212 JANUARY 1 0:00 UNIT 1 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.
JANUARY 19 13:50 PREPARING FOR PLANT SHUTDOWN DUE TO PRESSURE B0UNDARY LEAK JANUARY 19 14:30 DECREASING LOAD.
JANUARY 19 17:35 UNIT 1 REACTOR MANUALLY TRIPPED TO REPAIR PRESSURE B0UNDARY LEAK.
JANUARY 20 08:20 UNIT 1 ENTERED MODE 5.
l JANUARY 25 12:07 UNIT 1 ENTERED MODE 4.
JANUARY 25 21:52 UNIT 1 ENTERED MODE 3.
JANUARY 27 12:42 UNIT 1 ENTERED MODE 2.
JANUARY 27 13:12 REACTOR BECAME CRITICAL.
JANUARY 27 19:34 UNIT 1 ENTERED MODE 1.
JANUARY 28 05:00 UNIT 1 TIED TO GRID.
JANUARY 29 05:38 UNIT 1 AT 100% POWER.
JANUARY 31 23:59 UNIT 1 AT 100% POWER WITH N0 OPERATIONAL PROBLEMS.
l El-1
-)
OPERATING DATA REPORT DOCKET NO. 50-424 i DATE: 1989 I COMPLETED FEBBY: 10,R.A. M0YE l
TELEPHONE: (404) 724-8114 x3212 OPERATING STATUS )
- 1. UNIT NAME: A. W. V0GTLE UNIT 1 l 2. REPORT PERIOD:- JAN 89 l- 3. LICENSED THERMAL POWER (MWt : 3411 l
- 4. NAMEPLATE RATING (GROSS MWe : 1148
- 5. DESIGN ELECTRICAL RATING-(N T MWe): 1101
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 1137
- j
- 7. MAXIMUM DEPENDABLE CAPACITY 1083 *
- 8. IF CHANGES OCCUR INRATINGS CAPACITY (NET MWe):
4(ITEMS 3 THROUGH 7 l
MEGAWATTS DUE TO) COOLING TOWER IMPROVEMENTS.SINCE LAST REPORT, GIVE REA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): NO RESTRICTIONS j
- 10. REASONS FOR RESTRICTION, IF ANY: N/A THIS MONTH YR. TO DATE CUMULATIVE-
- 11. HOURS IN REPORTING PERIOD: 744 744 14665
'12. NUMBER OF HOURS REACTOR WAS CRITICAL: 556.4 I 556.4 l 1.1431.5 l
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE: 540.6 l 540.6 l 11033.3 I
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED MWH 1771903 1771903. 36203058.6
'17. GROSS ELEC. ENERGY GENERATED (M H):): 587920- 587920 11977990
-18. NET ELEC. ENERGY GENERATED (MWH : 552000 552000 11264130
- 19. REACTOR SERVICE FACTOR 74.8% 74.8% 78.0%
- 20. REACTOR AVAILABILITY FACTOR 74.8% 74.8% 78.0%
- 21. UNIT SERVICE FACTOR: 72.7% 72.7% 75.2%
- 22. UNIT AVAILABILITY FACTOR: 72.7% 72.7% 75.2%
- 23. UNIT CAPACITY FACTOR USING MDC NET): 68.5% 68.5% 71.2%
- 24. UNIT CAPACITY FACTOR USING DER NET): 67.4% 67.4% 69.8%'
- 25. UNIT FORCED OUTAGE RA E: 27.3% l 27.3% ! 15.7%l
- 26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
- 27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
- 28. UNITS IN TEST STATUS ( PRIOR TO COMMERCIAL OPERATION): N/A i El-2
_ _ _.-_-_ ___ _----_----_ - - _ - - - - - - 1
1
. j t
L J a
'4 l UNIT 1 AVERAGE DAILY DOCKET NO. 50-424 POWER LEVEL DATE:- FEB 10,-1989 l' COMPLETED BY: R. A. M0YE TELEPHONE: (404) 724-8114 x3212 l
! DAY Net MW j
- 1 ......... 1099 * '
2 ......... 1111
- j 3 ......... 1107
- I 4
4 ......... 1112
- 5 ......... 1112
- 6 ......... 1105
- l 7 ......... 1099
- 8 ......... 1098
- 9 ......... 1062 i 10 ......... 1038 11 ......... 1004
- 12 ......... 982 1
13 ......... 966 14 ......... 982 15 ......... 970 16 ......... 965 17 ......... 978 18 ......... 1040 19 ......... 741 20 ......... 0 21 ......... 0 22 ......... 0 23 ......... 0 24 ......... 0 25 ......... 0 26 ......... 0 27 ......... 0 28 ......... 416 29 ......... 1089
- 30 ......... 1062 ,
i 31 ......... 1099
- i
I
)
El-3 i
i I
l-UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-424 DATE: FEB 10, 1989 l UNIT NAME: V0GTLE UNIT 1 COMPLETED BY: R. A. M0YE TELEPHONE: (404) 724-8114 x3212 REPORT MONTH JAN 89 R M 5 E E Y T A T LICENSEE SC Y S H EVENT T0 COMP 0NENT CAUSE & CORRECTIVE P DURATION 0 0 REPORT ED CODE ACTION TO NO. DATE E (H0URS) N D NUMBER HE (SUBCODE) PREVENT RECURRENCE i 89-1 12-19 t 203.42 ~K~ ~2~ 89-004 ~~XB~ PLR SEE BELOW F: FORCED REASON: METHOD: EVENTS REPORTED INVOLVE S: SCHEDULED 1 - MANUAL A GREATER THAN 20%
A-EQUIPMENT B-MAINTENANCE OR TESTFAILURE (EXPLAIN) 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEEDING 24 HOURS.
E-0PERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)
G-0PERATIONAL ERROR (EXPLAIN)
H-0THER (EXPLAIN) 89-1 CAUSE: HIGH VIBRATION DUE TO INADEQUATE PIPING SUPPORT ON A DRAIN LINE MANIFOLD CAUSING A CRACK TO DEVELOP IN A WELDED COUPLING.
89-1 CORRECTIVE ACTION: CRACK WAS REPAIRED AND NEW PIPE SUPPORTS ADDED TO REDUCE VIBRATION.
El-4