ML21098A145

From kanterella
Revision as of 13:16, 9 September 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
2A - Generic Issue - Overview of GI Process for Aluminum HEAF
ML21098A145
Person / Time
Issue date: 04/06/2021
From: Js Hyslop
NRC/NRR/DRA/APLB
To:
Kenneth Hamburger
Shared Package
ML21098A144 List:
References
Download: ML21098A145 (7)


Text

Overview of GI process for Aluminum HEAF NRR/Division of Risk Assessment RES/Division of Risk Analysis Dr. J.S. Hyslop, NRR/DRA/APLB, presenting

No Immediate Safety Concern

  • HEAF already evaluated in plants with a PRA
  • A larger ZOI for Al HEAF does not necessarily mean a higher risk
  • Plants maintain defense-in-depth to safely shutdown a plant following a fire
  • Measures are in place at plants which can prevent a HEAF
  • Plants already have contingency plans for loss of large areas from fires and explosions HEAF Pre-Generic Issue Update - April 6th, 2021 2

Met Screening Phase Criteria

  • Potentially significant risk increase from Al HEAF (above existing approach for HEAF)

- Test results indicate potential for larger ZOI

- Al HEAF, like fire PRA in general, is highly configuration specific

  • Issue applies to two or more plants
  • Issue is well defined, discrete, and technical
  • Issue is not being addressed using other regulatory programs and processes, existing regulations, policies, or guidance.

HEAF Pre-Generic Issue Update - April 6th, 2021 3

Met Screening Phase Criteria (cont.)

  • Issue can be resolved by new or revised regulation, policy, or guidance
  • Resolution of the issue may involve review, analysis, or action by the affected licensees

- Can resolve issue by licensees identifying location of Al and performing analysis, and taking appropriate action HEAF Pre-Generic Issue Update - April 6th, 2021 4

Assessment Phase

  • Current phase
  • Al HEAF is Pre-GI 018 at this phase
  • EPRI survey indicates that all plants have Aluminum in some HEAF susceptible equipment
  • Evaluate increase in risk due to Al HEAF enhanced model for current configuration of plants with fire PRAs

- Use PRA methodology for Al HEAF under development by NRC/EPRI MOU working group, including new ZOIs

  • Evaluate impact on protected train for plants with no fire PRA (i.e. a subset of those plants with a deterministic licensing basis)

HEAF Pre-Generic Issue Update - April 6th, 2021 5

Regulatory Office Implementation(ROI)

Phase

  • Should the assessment determine that either a plant with a fire PRA, or a plant with a deterministic licensing basis and no fire PRA, meet the staff criteria for significance, then the issue will transition to the ROI phase.
  • Perform a regulatory analysis for plants with a fire PRA
  • Courses of action evaluated
  • Generic communication as necessary
  • Advantages to industry and the NRC for plants to participate in Assessment and ROI phases HEAF Pre-Generic Issue Update - April 6th, 2021 6

GI Process Summary HEAF Pre-Generic Issue Update - April 6th, 2021