ML20211J501
| ML20211J501 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 11/03/1986 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML20211J506 | List: |
| References | |
| NUDOCS 8611110148 | |
| Download: ML20211J501 (3) | |
See also: IR 05000424/1986092
Text
.
. .
NOV 0 31986
Docket No. 50-424
License No. CPPR-108
Power Company
Georgia,Mr.
ATTN: V
_
J. H. - Miller, Jr.
President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: NRC INSPECTION REPORT N0. 50-424/86-92
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
W. J. Ross on September 29 - October 3,1986. The inspection included a review
of activities authorized for your Vogtle facility. At the conclusion of the
inspection, the findings were discussed with those members of your staff.-
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
86g11[Q Q $ bbOS24 poa
gD Virgil L. Brownlee, Chief
Reactor Projects Branch 3
DivisionofReactorProjects
Enclosure:
NRC Inspection Report
cc w/ encl: (see page 2)
. _ . _ - - . .- -
gb( lj I
i
. .
Georgia Power Company 2
cf/ w/ enc 1:
\/J P. O'Reilly, Senior Vice President
Nuclear Operations
. E. Conway, Senior Vice President &
f roject
P Director
W. O. Foster, Vice President, Project
Support
/P.D. Rice,VicePresident, Project'
Engineering
. H. Pinson, Vice President, Project
A onstruction
vJ. T. Beckham, Vice President & >
j General Manager - Operations
VR. A. Thomas, Vice President,
/ Licensing
A). S. Read, General Manager,
Quality Assurance
/C.W. Hayes,VogtleQuality
d.AssuranceManager
C. Ramsey, Manager -
f Readiness Review
v fG. B. Bockhold, General Manager,
/ Nuclear Operations
VL. Gucwa, Manager, Nuclear Safety
/ .and
M H.Licensing
Googe, Project
/ Construction Manager
JE.' D. Groover, Quality
Assurance Site Manager -
/ Construction
A. Bailey, Project Licensing
Manager
.
G. F. Trowbridge, Esq., Shaw,
t Pittman, Potts and Trowbridge
W. Churchill, Esq., Shaw,
Pittman, Potts and Trowbridge
. L. Blake, Jr. , Esq. , Shaw,
l Pittman, Potts and Trowbridge
E. Joiner, Troutman, Sanders,
l Lockerman and Ashmore
i . G. Ledbetter, Commissioner,
l Department of Human Resources
t
t
.H. Badger, Office of Planning
and Budget
l . Kirkland, III, Counsel,
- Office of the Consumer's Utility
i' / Council
v'D. Feig, Georgians Against
Nuclear Energy
,
(cc w/ encl cont'd - see page 3)
l
!
!
i
"
-
. .
<
Georgia-Power Ccmpany 3
-_ fecw/ enc 1 cont'd)
v'M. B. Margulies, Esq. , Chairman,
Atomic Safety and Licensing Board
-/ Dr.
Panel O. H. Paris, Administrative Judge
Atomic Safety and Licensing Board
. Panel-
G. A. Linenberger, Jr. , Administrative Judge
Atomic Safety and Licensing Board
/ Panel
vt P. Garde, Citizens Clinic, Director
Government Accountability Project
c w/ enc 1:
. Reis, GS0 l
'
. M. Hill, IE
-
. Miller, NRR
. Brach, G50
. Sinkule, RII
Christnot, RII
' RC Resident Inspector
Document Control Desk-
State of Georgia
1
.-
l
t
1/, k 4 AAL$
WJRo s:er DMCollins JPStohr MVSinkule
,
10//0/86 10/J7/86 10/zf'/86 10 /86