ML20211J764

From kanterella
Revision as of 13:42, 6 May 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Informs That 860929 Rev to Plant Emergency Plan Meets Planning Stds of 10CFR50.47(b) & Requirements of 10CFR50, App E.All Future Changes Should Be Submitted to NRC
ML20211J764
Person / Time
Site: Surry  Dominion icon.png
Issue date: 11/03/1986
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
References
NUDOCS 8611110275
Download: ML20211J764 (1)


Text

NOV 0 31986 Virgini ~

ATTN Mr. (/p Electric and Power W. L. Stewart, Company Vice President, Nuclear Operations P. O. Box 26666 Richmond, VA 23261 Gentlemen:

SUBJECT:

SURRY POWER STATION EMERGENCY PLAN REVIEW DOCKET NOS. 50-280 AND 50-281

- We have completed our review of the September 29, 1986, revision to the Surry Power Station Emergency Plan.

Our review indicated that these changes to your Surry Power Station Emergency Plan meet the planning standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50.

Please be reminded that 10 CFR 50.54(q) requires that proposed changes that decrease the effectiveness of your Emergency Plan shall not be implemented without application to and approval by the Coninission. However, changes may be made without approval if such changes do not decrease the effectiveness of the Plan, and the Plan as changed, continues to meet the standards of 50.47(b) and the requirements of Appendix E to 10 CFR 50. In all cases, you should furnish copies of each. change to the NRC in accordance with 10 CFR 50.54(q). Also, any changes to the Emergency Plan Implementing Procedures should be made in accordance with the requirements of 10 CFR 50, Appendix E, Section V.

Should you have any questions regarding this letter, please contact Mr. Thomas R.

Decker of the Region II staff at (404) 331-2559.

Sincerely, Virgil L. Brownlee, Chief Reactor Projects Branch 3 Division of Reactor Projects cc: . F. Saunders, Station Manager

. J. Hardwick, Manager - Nuclear Programs and Licensing bec C Resident Inspector Document Control Desk Commonwealth of Virginia f Y hkL Q (N)k ATabaka dTDecker DCollins Algnatonis 10/je/86 1080/86 10/.'c/86 \t r 10/5l/86 8611110275 861103 PDR ADOCK 05000200 ,

F PDR