ML20211N017

From kanterella
Revision as of 02:48, 6 May 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Annual Rept of Facility Changes,Tests & Experiments,Describing Changes to Facility Performed Since Oct 1996
ML20211N017
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 10/08/1997
From: Rang J
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20211N021 List:
References
NUDOCS 9710150224
Download: ML20211N017 (1)


Text

. - - .- . . - , . _ _ . . ~ - . . - _ . _ .

q m Ersorgy s

A CATS Energy Cewy Sg M M Myy M mp,m 10269 US 31 Norm Plant General Alman Chanew, MI 49720 l

October 8, 1997 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 - 0001 DOCKET 50-155 LICENSE DPR 6 BIG ROCK POINT PLANT - ANNUAL REPORT OF FACILITY CHANGES, TESTS AND EXPERIMENTS.

In accordance with 10 CFR 50.82(a)(1)(i) and (ii), the Big Rock Point Plant has docketed certifications for ]ermanent cessation of operations and permanent removal of fuel from tie reactor vessel. The decision to shut the facility down permanently resulted in the cancellation of facility changes that were planned to support continued operation of the facility.

Pursuant to 10 CFR 50.59(b)(2), find attached to this letter Consumers Energy Company's Annual Report describing changes to the Big Rock Point facility performed since October 8. 1996. Attachment 1 describes the modifications performed at the facility, and Attachment 2 provides miscellaneous changes to procedures, programs and technical specifications.

A \ \

k James S Rang Business. Regulatory and Services Manager CC: Administrator. Region III. USNRC /

[

NRC Resident Inspector - Big Rock Point NRR Project Manager - OWFN ATTACHMENTS 9710150224 971008 PDR ADOCK 05000155 ll PDR l!lllOll!O!lOljlOlEl,llllj0l!ll