ML20215E707
| ML20215E707 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 10/03/1986 |
| From: | Walker R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML20215E709 | List: |
| References | |
| NUDOCS 8610150468 | |
| Download: ML20215E707 (3) | |
See also: IR 05000424/1986076
Text
.- - _._ - . . _ _ _ _ . _ _ _ .. . . . . . -
- .. 3
~
Ve///W
-
.
-
s
.
, 007 0 3 1986
Docket Nos. 50-424, 50-425
License Nos. CPPR-108, CPPR-109
eorgia Power Company
ATTN: Mr. J. H. Miller, Jr.
President
P. O. Box 4545
Atlanta, GA 30302
. Gentlemen:
SUBJECT: NOTICE OF VIOLATION
(NRC INSPECTION REPORT NOS. 50-424/86-76 AND 50-425/86-37)
1
This refers to the Nuclear Regulatory Comission (NRC) inspection conducted by
G. A. Hallstrom, on August 18-22, 1986. The inspection included a review of
,
activities authorized for your Vogtle facility. At the conclusion of the-
inspection, the findings were discussed with those members of your staff
'
identified in the enclosed inspection report.
! Areas examined during the inspection are identified in the report. Within these
- areas, the inspection consisted of selective examinations of procedures and
! representative records, interviews with personnel, and observation of activities
4
in progress.
!
j - The inspection findings indicate that certain activities appeared to violate NRC
requirements. The violation, references to pertinent requirements, and elements
'
to be ' included in your response are described in the enclosed Notice of
Violation.
Your attention is invited to an unresolved item identified in the inspection report.
This matter will be pursued during future inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
The responses directed by this letter and its enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
pgAo1888!! 8th8)k
G
, _
_ .. . _ .__ _ ,__ _ _. _ .,__ _ . _ , _ ._ _ ,,. _ . , , _ _ _ _ _ , .
L' ,
'fD
-
, _ . _
. .
~
.
Georgia Power Company 2
W03m
Should you have any questions concerning this letter, please contact us.
Sincerely,
Original Signed by
Luis A. Reyes /for
Roger D. Walker, Director
Division of Reactor Projects
Enclosures:
2. NRC Inspection Report
ye w/encls:
VJ. P. O'Reilly, Senior Vice President
/ Nuclear Operations
V R. E. Conway, Senior Vice President &
Project Director
3
/D. O. Foster, Vice President., Project
/ Support
/ P. D. Rice, Vice President, Project
f Engineering
/R.H.Pinson,VicePresident, Project
Construction
]J.T.Beckham,VicePresident&
f General Manager - Operations
J R. A. Thomas, Vice President,
/ Licensing
V D. S. Read, General Manager,
Quality Assurance
/C. W. Hayes, Vogtle Quality
/ Assurance Manager
V W. C. Ramsey, Manager -
/ Readiness Review
/ G. B. Bockhold, General Manager,
/ Nuclear Operations
VL. Gucwa, Manager, Nuclear Safety
/ and Licensing
/ M. H. Googe, Project
Construction Manager
E. D. Groover, Quality
Assurance Site Manager -
/ Construction
V J. A. Bailey, Project Licensing
M
7 anager
VG. F. Trowbridge, Esq. , Shaw,
Pittman, Potts and Trowbridge
(cc w/encls - cont'd on page 3)
1
-. _ . , _ . - - _
_ . _ _ . _.._- _ ,
. .
beorgiaPowerCompany 3
/(ccw/enclscont'd)
B. W. Churchill, Esq., Shaw,
j Pittman, Potts and Trowbridge
J E. L. Blake, Jr., Esq., Shaw,
Pittman, Potts and Trowbridge
. E. Joiner, Troutman, Sanders,
Lockerman and Ashmore
. G. Ledbetter, Commissioner,
Department of Human Resources
C. H. Badger, Office of Planning
/ and Budget
VD. Kirkland, III, Counsel,
Office of the Consumer's Utility
Council
D. Feig, Georgians Against
Nuclear Energy
/M.B.Margulies,Esq., Chairman,
Atomic Safety and Licensing Board
Panel
MDr.O.H. Paris,AdministrativeJudge
Atomic Safety and Licensing Board
- ; Panel
J. A. Linenberger, Jr., Administrative Judge
Atomic Safety and Licensing Board
Panel
/B. P. Garde, Citizens Clinic Director
Government Accountability Project
be
I f.cReis,
w/encls:
0GC
v'W. M. Hill, IE
M. Miller, NRR
/W. Brach 0GC
M. Sinkule, RII
/E. Christnot, RII
,
V NRC Resident Inspector
, Document Control Desk
l State of Georgia
I
L
RII p RII RII RII RII
GAHallstrom:lb , Blake ARbdt VPa c era MSinkule VLB'rownlee
j 09/a/86 0 /g'b/86 09/%/86 09 gy86 09/g86 09/ /86
/
1(3c/74
- -