MONTHYEARML20217N4261999-10-25025 October 1999 Forwards Amend 17 to License DPR-9 & Safety Evaluation. Amend Revises TS by Deleting SR D.3.c,which Required Weekly Observation of Nitrogen Cover Gas Pressure within Sodium Storage Tanks Located in Sodium Building NRC-99-0085, Forwards Rev 15 to Fermi 2 Security Personnel Training & Qualification Plan, IAW 10CFR50.54(p)(2).Without Encl1999-10-22022 October 1999 Forwards Rev 15 to Fermi 2 Security Personnel Training & Qualification Plan, IAW 10CFR50.54(p)(2).Without Encl NRC-99-0094, Forwards Safeguards Event Rept 99-S01-00 for Reportable Event That Occurred on 990922.Commitments Made by Util Listed1999-10-22022 October 1999 Forwards Safeguards Event Rept 99-S01-00 for Reportable Event That Occurred on 990922.Commitments Made by Util Listed ML20217P1661999-10-21021 October 1999 Forwards Insp Rept 50-341/99-17 on 990927-1005.No Violations Noted ML20217M0771999-10-19019 October 1999 Confirms Discussion Between GL Shear,M Mitchell,E Kosky, D Williams,B Rumins,D Harmon & W Rutenberg in Public Meeting on 990923.Purpose of Meeting Was to Discuss Current Status RP Program at Enrico Fermi 2 ML20217N9231999-10-15015 October 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 40 ML20217E5671999-10-14014 October 1999 First Partial Response to FOIA Request for Documents.Records in App a Already Available in Pdr.App B Records Encl & Being Released in Entirety NRC-99-0087, Responds to NRC Re Violations Noted in Insp Rept 50-341/99-10.Licensee Contests Subject Violation,Due to Listed Reasons1999-10-12012 October 1999 Responds to NRC Re Violations Noted in Insp Rept 50-341/99-10.Licensee Contests Subject Violation,Due to Listed Reasons NRC-99-0083, Submits Requested Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal1999-10-0707 October 1999 Submits Requested Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal ML20217D5331999-10-0707 October 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 39 ML20217F5931999-10-0707 October 1999 Forwards Insp Rept 50-341/99-11 on 990724-0908.Two Violations Re Failure to Follow Procedures While Sampling Standby Liquid Control Tank & Wear Dosimetry Properly Being Treated as Noncited Violations ML20217B8261999-10-0404 October 1999 Forwards Summary of Decommissioning Insp Plan for Fy 2000. Plan Will Be Updated Annually & May Be Revised at Any Time Based Upon Future Insp Findings,Events & Resource Availability ML20212J8121999-10-0101 October 1999 Discusses Plant,Unit 2 Completion of Licensing Action for GL 98-01 & Suppl 1, Y2K Readiness of Computer Sys at Npps. Ack Efforts That Licensee Have Completed to Date in Preparing Plant for Y2K Transition ML20212K8881999-09-30030 September 1999 Refers to 990928 Meeting Conducted at Fermi Unit 2 to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PSA Staff ML20217A3261999-09-30030 September 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 38 NRC-99-0091, Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations1999-09-27027 September 1999 Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations ML20212J8331999-09-27027 September 1999 Responds to Licensee 990924 Request That NRC Exercise Discretion Not to Enforce Compliance with Actions Required in TS 3/4.6.1.8.Ltr Documents 990923 Telcon with Util in Which NRC Orally Issued NOED ML20216G9791999-09-24024 September 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 37 NRC-99-0092, Documents Util Request for Enforcement Discretion with Respect to Requirements of TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys1999-09-24024 September 1999 Documents Util Request for Enforcement Discretion with Respect to Requirements of TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys ML20216H3561999-09-23023 September 1999 Informs That During 990914 Telcon,L Sanders & M Bielby Made Arrangements with NRC to Inspect Licensed Operator Requalification Program at Fermi Nuclear Station for Week of 991129 Which Coincides with Util Regularly Scheduled Exam ML20216H4541999-09-23023 September 1999 Informs That During 990914 Telcon L Sanders & M Bielby Made Arrangements for Administration of Licensing Exams at Fermi Nuclear Station for Week of Jan 31,2000.NRC Will Make Exam Validation Visit to Facility During Week of Jan 10,2000 ML20212F3241999-09-20020 September 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 36 NRC-99-0081, Submits Eight Relief Requests Associated with Containment Inservice Exam Program for Fermi 2 Plant,Per Provisions of 10CFR50.55a(g)(5)(iv).Requested Relief Does Not Adversely Affect Health & Safety of Public1999-09-17017 September 1999 Submits Eight Relief Requests Associated with Containment Inservice Exam Program for Fermi 2 Plant,Per Provisions of 10CFR50.55a(g)(5)(iv).Requested Relief Does Not Adversely Affect Health & Safety of Public ML20217A9421999-09-0909 September 1999 Informs That NRC Plan to Conduct Addl Resident Insps Beyond Core Insp Program Over Next 6 Months to Assess Improvements in Areas of Procedural Compliance & Quality of Work. Historical Listing of Plant Issues Encl NRC-99-0079, Forwards Rev 15 to Fermi 2 ITS Submittal,Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev1999-09-0808 September 1999 Forwards Rev 15 to Fermi 2 ITS Submittal,Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev ML20211Q0991999-09-0303 September 1999 Forwards Rev 35 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0090, Forwards Proprietary Operator License Renewal Application, NRC Forms 398 & 396 for SW Burt,License SOP-30199-3. Proprietary Encls Withheld1999-09-0303 September 1999 Forwards Proprietary Operator License Renewal Application, NRC Forms 398 & 396 for SW Burt,License SOP-30199-3. Proprietary Encls Withheld NRC-99-0066, Forwards semi-annual fitness-for-duty Rept for Fermi 2 for Period of 990101-0630,IAW 10CFR26.71(d)1999-08-30030 August 1999 Forwards semi-annual fitness-for-duty Rept for Fermi 2 for Period of 990101-0630,IAW 10CFR26.71(d) ML20211G4951999-08-24024 August 1999 Forwards Rev 34 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0055, Forwards Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval, Per Provisions of 10CFR50.55a(f)(5)(iv).Rev Includes Four Pump Relief Requests & Ten Valve Relief Requests Requiring NRC Approval1999-08-19019 August 1999 Forwards Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval, Per Provisions of 10CFR50.55a(f)(5)(iv).Rev Includes Four Pump Relief Requests & Ten Valve Relief Requests Requiring NRC Approval IR 05000341/19990131999-08-19019 August 1999 Discusses Insp Rept 50-341/99-13 & OI Rept 3-98-039 Conducted Into Potential Misconduct of Operator Formerly Employed by De.Nrc Determined That Violation of NRC Regulations Occurred.Synopsis of IO Rept Encl NRC-99-0056, Forwards Rev 2,change 0 to ISI-Nondestructive Exam (ISI-NDE) Program (Plan) for Piping,Components & Integral Attachments, for Second ten-year Interval of Fermi 2 Plant Operation1999-08-19019 August 1999 Forwards Rev 2,change 0 to ISI-Nondestructive Exam (ISI-NDE) Program (Plan) for Piping,Components & Integral Attachments, for Second ten-year Interval of Fermi 2 Plant Operation ML20211C0521999-08-17017 August 1999 Forwards Tables for Sections 3.6 & 3.7 of Draft Safety Evaluation of Proposed Conversion of Current TS to Improved Standard TS NRC-99-0089, Forwards Rev 13 to Fermi 2 ITS Submittal Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev1999-08-17017 August 1999 Forwards Rev 13 to Fermi 2 ITS Submittal Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev ML20217E6181999-08-13013 August 1999 FOIA Request for Documents Re Implementing Regulations in 10CFR & Requesting That Region III Task Interface Agreement (TIA) Related to Fermi 2 Plant Be Made Available IR 05000341/19990011999-08-10010 August 1999 Forwards Insp Rept 50-341/99-01 on 990619-0723 & Nov. Violation of Concern Because Operators Did Not Understand License Requirements & Placed Plant in Configuration Where EDG 11 Was Removed from Service IR 05000341/19990121999-08-0606 August 1999 Forwards Insp Rept 50-341/99-12 on 990712-0716.No Violations Noted.Insp Focused on Implementation of Plant Chemistry & Radiological Environ Monitoring Programs & Operation of post-accident Sampling Sys ML20211C4761999-08-0606 August 1999 Forwards Draft Safety Evaluation Re Proposed Conversion of Current TS to Improved Standard TS NRC-99-0057, Forwards Rev 12 to ITS 980403 Submittal,Providing Update to Submittal for ITS Section 3.3,including Changes Associated with NRC Review of Rev 6 ITS1999-08-0404 August 1999 Forwards Rev 12 to ITS 980403 Submittal,Providing Update to Submittal for ITS Section 3.3,including Changes Associated with NRC Review of Rev 6 ITS ML20210N5451999-08-0303 August 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 33 NRC-99-0077, Forwards Rev 11 to Fermi ITS Submittal,Dtd 980403,providing Update to Submittal for ITS Sections 3.5,3.6 & 3.8.Update Includes Changes Associated with NRC Review of Util Transmittals of Revs 5,5a & 7 to ITS1999-07-26026 July 1999 Forwards Rev 11 to Fermi ITS Submittal,Dtd 980403,providing Update to Submittal for ITS Sections 3.5,3.6 & 3.8.Update Includes Changes Associated with NRC Review of Util Transmittals of Revs 5,5a & 7 to ITS ML20210J2121999-07-23023 July 1999 Discusses NRC OI Investigation Rept 3-98-039 Completed on 990524 & Forwards Notice of Violation NRC-99-0053, Forwards Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan, Per 10CFR50.54(p)(2).Changes Do Not Decrease Effectiveness of Plan.Summary of Changes Also Encl1999-07-15015 July 1999 Forwards Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan, Per 10CFR50.54(p)(2).Changes Do Not Decrease Effectiveness of Plan.Summary of Changes Also Encl ML20209H7211999-07-14014 July 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 32 NRC-99-0054, Forwards Rev 10 to Fermi 2 ITS Submittal, , Providing Update to Submittal for ITS Section 3.4,RCS.Update Includes Changes Associated with NRC Review of Util Transmittal of Rev 4 to ITS Submittal1999-07-13013 July 1999 Forwards Rev 10 to Fermi 2 ITS Submittal, , Providing Update to Submittal for ITS Section 3.4,RCS.Update Includes Changes Associated with NRC Review of Util Transmittal of Rev 4 to ITS Submittal ML20209F6571999-07-12012 July 1999 Forwards Insp Rept 50-341/99-09 on 990516-0618.No Violations Noted.Weak Procedural Guidance,Communications Issues & Configuration Control Weaknessess Were Evident NRC-99-0052, Forwards Rev 9 to Fermi 2 ITS Submittal,Dtd 980403. Attachment 1 Contains Brief Abstract of Changes Included in Rev.Attachment 2 Contains Revised Pages for Submittal Along with Rev Instructions1999-07-0707 July 1999 Forwards Rev 9 to Fermi 2 ITS Submittal,Dtd 980403. Attachment 1 Contains Brief Abstract of Changes Included in Rev.Attachment 2 Contains Revised Pages for Submittal Along with Rev Instructions ML20196J5511999-07-0202 July 1999 Discusses GL 92-01,Rev 1,Supp 1, Rv Integrity, Issued by NRC on 950519 & DE Responses & 980729 for Fermi 2.Informs That Staff Revised Info in Rvid & Released Info as Rvid Version 2 as Result of Review of Responses ML20209C6141999-07-0101 July 1999 Rev 31 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0076, Forwards Rev 8 to ITS Submittal to Provide Update to ITS Submittal for ITS Section 3.7.Brief Abstract of Changes Included1999-06-30030 June 1999 Forwards Rev 8 to ITS Submittal to Provide Update to ITS Submittal for ITS Section 3.7.Brief Abstract of Changes Included 1999-09-09
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217N4261999-10-25025 October 1999 Forwards Amend 17 to License DPR-9 & Safety Evaluation. Amend Revises TS by Deleting SR D.3.c,which Required Weekly Observation of Nitrogen Cover Gas Pressure within Sodium Storage Tanks Located in Sodium Building ML20217P1661999-10-21021 October 1999 Forwards Insp Rept 50-341/99-17 on 990927-1005.No Violations Noted ML20217M0771999-10-19019 October 1999 Confirms Discussion Between GL Shear,M Mitchell,E Kosky, D Williams,B Rumins,D Harmon & W Rutenberg in Public Meeting on 990923.Purpose of Meeting Was to Discuss Current Status RP Program at Enrico Fermi 2 ML20217E5671999-10-14014 October 1999 First Partial Response to FOIA Request for Documents.Records in App a Already Available in Pdr.App B Records Encl & Being Released in Entirety ML20217F5931999-10-0707 October 1999 Forwards Insp Rept 50-341/99-11 on 990724-0908.Two Violations Re Failure to Follow Procedures While Sampling Standby Liquid Control Tank & Wear Dosimetry Properly Being Treated as Noncited Violations ML20217B8261999-10-0404 October 1999 Forwards Summary of Decommissioning Insp Plan for Fy 2000. Plan Will Be Updated Annually & May Be Revised at Any Time Based Upon Future Insp Findings,Events & Resource Availability ML20212J8121999-10-0101 October 1999 Discusses Plant,Unit 2 Completion of Licensing Action for GL 98-01 & Suppl 1, Y2K Readiness of Computer Sys at Npps. Ack Efforts That Licensee Have Completed to Date in Preparing Plant for Y2K Transition ML20212K8881999-09-30030 September 1999 Refers to 990928 Meeting Conducted at Fermi Unit 2 to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PSA Staff ML20212J8331999-09-27027 September 1999 Responds to Licensee 990924 Request That NRC Exercise Discretion Not to Enforce Compliance with Actions Required in TS 3/4.6.1.8.Ltr Documents 990923 Telcon with Util in Which NRC Orally Issued NOED ML20216H4541999-09-23023 September 1999 Informs That During 990914 Telcon L Sanders & M Bielby Made Arrangements for Administration of Licensing Exams at Fermi Nuclear Station for Week of Jan 31,2000.NRC Will Make Exam Validation Visit to Facility During Week of Jan 10,2000 ML20216H3561999-09-23023 September 1999 Informs That During 990914 Telcon,L Sanders & M Bielby Made Arrangements with NRC to Inspect Licensed Operator Requalification Program at Fermi Nuclear Station for Week of 991129 Which Coincides with Util Regularly Scheduled Exam ML20217A9421999-09-0909 September 1999 Informs That NRC Plan to Conduct Addl Resident Insps Beyond Core Insp Program Over Next 6 Months to Assess Improvements in Areas of Procedural Compliance & Quality of Work. Historical Listing of Plant Issues Encl IR 05000341/19990131999-08-19019 August 1999 Discusses Insp Rept 50-341/99-13 & OI Rept 3-98-039 Conducted Into Potential Misconduct of Operator Formerly Employed by De.Nrc Determined That Violation of NRC Regulations Occurred.Synopsis of IO Rept Encl ML20211C0521999-08-17017 August 1999 Forwards Tables for Sections 3.6 & 3.7 of Draft Safety Evaluation of Proposed Conversion of Current TS to Improved Standard TS IR 05000341/19990011999-08-10010 August 1999 Forwards Insp Rept 50-341/99-01 on 990619-0723 & Nov. Violation of Concern Because Operators Did Not Understand License Requirements & Placed Plant in Configuration Where EDG 11 Was Removed from Service IR 05000341/19990121999-08-0606 August 1999 Forwards Insp Rept 50-341/99-12 on 990712-0716.No Violations Noted.Insp Focused on Implementation of Plant Chemistry & Radiological Environ Monitoring Programs & Operation of post-accident Sampling Sys ML20211C4761999-08-0606 August 1999 Forwards Draft Safety Evaluation Re Proposed Conversion of Current TS to Improved Standard TS ML20210J2121999-07-23023 July 1999 Discusses NRC OI Investigation Rept 3-98-039 Completed on 990524 & Forwards Notice of Violation ML20209F6571999-07-12012 July 1999 Forwards Insp Rept 50-341/99-09 on 990516-0618.No Violations Noted.Weak Procedural Guidance,Communications Issues & Configuration Control Weaknessess Were Evident ML20196J5511999-07-0202 July 1999 Discusses GL 92-01,Rev 1,Supp 1, Rv Integrity, Issued by NRC on 950519 & DE Responses & 980729 for Fermi 2.Informs That Staff Revised Info in Rvid & Released Info as Rvid Version 2 as Result of Review of Responses ML20209E9991999-06-30030 June 1999 Forwards Insp Rept 50-016/99-01 on 990614-17.No Violations Noted.Potential Weakness in Airborne Effluent Concentration Assessment Identified ML20209B2471999-06-29029 June 1999 Informs That NRR Revised Schedule for Conversion of Fermi 2 TS to Improved Std Ts.Planned Amend Date Has Been Moved to 990930 & Date for Draft Amend Has Been Moved to 990806 ML20207E4961999-06-0101 June 1999 Forwards Insp Rept 50-341/99-07 on 990402-0515.One Violation of NRC Requirements Occurred Re Failure to Keep TS Requirements Re Approval of Overtime Deviations.Violations Being Treated as non-cited Violations,Consistent with App C ML20207D3311999-05-26026 May 1999 Forwards Insp Rept 50-341/99-04 on 990503-07.No Violations Noted.During Insp,Nrc Observation of Licensee Activities Showed Radiological Emergency Response Preparedness Program Maintained in Effective State of Operational Readiness ML20206N7351999-05-14014 May 1999 Forwards RAI Re Plant Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During DBA Conditions ML20206N4621999-05-13013 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization, Division of Licensing Project Management Created. Reorganization Chart Encl ML20206J9131999-05-10010 May 1999 Forwards SE Finding That Util Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, ML20206Q7041999-05-0606 May 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-341/99-02 on 990308 ML20206G4931999-05-0505 May 1999 Refers to DE 980804 Requests for Relief (PR-8,Rev 2 & PR-12) from IST Requirements of ASME Code for RHR Pumps.Review of Relief Requests Completed.Se Approving Relief Requests Encl ML20206K4031999-04-29029 April 1999 Forwards Partially Withheld (Ref 10CFR73.21) Insp Rept 50-341/99-08 on 990405-09.No Violations Noted.Concern Expressed Over NRC Observations of Poor Performance Demonstrated During Some Contingency Response Drills ML20205T3841999-04-23023 April 1999 Forwards Insp Rept 50-341/99-03 on 990218-0401.Two Violations Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20205S8481999-04-20020 April 1999 Informs That Changes in Rev 22 Do Not Decrease Effectiveness of Emergency Plan & Plan Continues to Meet Stds of 10CFR50.47(b) & Requirements of App E to 10CFR50.NRC Approval Is Not Required ML20205Q7001999-04-15015 April 1999 Forwards Amend 16 to License DPR-9,allowing Possession of Nominal Amount of Special Nuclear Matl,In Response to 980717 Application.Related SER & Notice of Issuance Also Encl ML20205P1691999-04-14014 April 1999 Forwards Insp Rept 50-341/99-06 on 990315-19.No Violations Noted.Insp Focused on Aspects of Radioactive Effluent Monitoring,Liquid Waste Processing,Esf Filtration & CR Habitability & Solid Waste Mgt & Transportation Programs ML20204E4061999-03-19019 March 1999 Forwards Insp Rept 50-341/99-05 on 990308-11.No Violations Noted.Insp Concluded That Fire Protection Program Was Effective ML20204E0271999-03-17017 March 1999 Forwards SE Accepting Licensee & Suppl, ,which Requested NRC Approval of Alternative Rv Weld Exam,Per 10CFR50.55a(a)(3)(i) & 10CFR50.55a(g)(6)(ii)(A)(5), for Plant,Unit 2 for 40-month Period ML20207L7281999-03-0909 March 1999 Informs That Util Ltrs & 981026 Responding to GL 96-01, Testing of Safety-Related Logic Circuits, Completes Licensing Action for Fermi 2 ML20207J1401999-03-0808 March 1999 Forwards Insp Rept 50-341/99-02 on 990111-29 & Notice of Violation.One Violation Identified in Area of Design Control.Violation of Concern Because Errors Existed in Three of Six Calculations Reviewed ML20207G5711999-03-0404 March 1999 Discusses 990301 Meeting Between GL Shear,M Mitchell, D Williams,C Budnik & M Clements Re Current Status of Radiation Protection Program at Facility ML20207E2491999-02-22022 February 1999 Discusses Licensee 980617 Updated Response to GL 96-05 Indicating Intent to Implement Provisions of JOG Program for MOV Periodic Verification for Fermi-2.Forwards RAI Re Fermi-2 Response to GL 96-05 ML20207E6451999-02-22022 February 1999 Submits Correction to Insp Rept 50-341/98-15 Issued on 981207.Rept Incorrectly Documented That Loose Internal Sleeving on Turbine Control Valve Caused Power Oscillations Greater than 10% During Plant Operation ML20203F6761999-02-11011 February 1999 Forwards Request for Addl Info Re Conversion to Improved Standard Ts,Section 3.6 for Fermi 2 ML20203F2541999-02-10010 February 1999 Informs That Beginning 990216,DE Hills Will Be Chief of Operations Branch Which Includes Operator Licensing Function ML20203F6911999-02-10010 February 1999 Discusses Completion of Licensing Action for Bulletin 96-03, Potential Plugging of Emergency Core Cooling Suction Strainers by Debris in Boiling-Water Reactors, ML20203G6411999-02-0808 February 1999 Informs of Receipt of Encl FEMA Correspondence Received 990119,transmitting FEMA Final Exercise Rept for 980608 Plume Exposure Pathway Exercise at Enrico Fermi II Npp.No Deficiencies Were Identified During Exercise ML20202H8881999-02-0404 February 1999 Clarifies Intent of RAI Re Plant Staff Qualifications & Reg Guide 1.8,Rev 2, Qualification & Training of Personnel for Nuclear Power Plants, Dtd Apr 1987.Staff Position on Issue Neither New Nor Different Position from Previous Position ML20202H6111999-01-25025 January 1999 Requests Addl Info Re Conversion to Improved Std Tss, Section 3.5 for Fermi 2 ML20206S1111999-01-21021 January 1999 Forwards Insp Rept 50-341/98-19 on 981110-990104.No Violations Noted.Inspectors Noted Potential Trend Re Documented Operability Assessments That May Not Have Been Performed for C/A Resolution Documents ML20199G7561999-01-14014 January 1999 Forwards Request for Addl Info Re Conversion to Improved Stds Tss,Section 3.3 for Plant ML20198S3101999-01-0606 January 1999 Forwards Amend 15 to License DPR-9,consisting of Changes to TS in Response to 980128 Application.Related SER & Notice of Issuance,Also Encl 1999-09-09
[Table view] |
See also: IR 05000341/1997011
Text
e
L
March 4, 1998
EA 97-479
,
Mr. D. R. Gipson
.
Senior Vice President
Nuclear Generation
Fermi 2 Nuclear Power Plant
The Detroit Edison Company
6400 North Dixie Highway
Newport, MI 48166
SUBJECT: , NRC PRE-DECISIONAL ENFORCEMENT CONFERENCE SUMMARY AND
NOTICE OF VIOLATION (INSPECTION REPORT NO. 50-341/97011(DRS))
Dear Mr. Gipson:
This refers to an inspection conducted from August 4,1997 through October 10,1997 at the
Enrico Fermi 2 Nuclear Power Plant (Fermi 2). An apparent violation, involving a change to the
emergency equipment cooling water (EECW) system that appeared to represent an unreviewed
safety question (USQ), was identified during this inspection. The exit meeting for this
- inspection was conducted on October 10,1997. The inspection report was mailed to Fermi 2
by letter dated October 29,1997. On November 18,1997, a predecisional enforcement
conference (PEC) was held in the NRC Region Ill office to discuss the apparent violation. The
attendance list and the slides used during your portion of the conference presentation are
enclosed with this letter.
Based on the information developed during the inspection and the information provided by
representatives of Fermi 2 at the PEC, the NRC has determined that a violation of NRC
requirements occurred. This violation involves the failure to perform an adequate safety
evaluation, such that it was not readily apparent that an USQ did not exist. During and after the
conference, members of the Fermi 2 staff presented additional information as to why an USQ
did not exist.
The issue involved a 1995 safety evaluation for a modification to the plant to allow use of the i
safety-related EECW system to supplement the non-safety-related reactor building closed
cooling water (RBCCW) system during normal operation. This operational modification was
primarily to ensure adequate drywell cooling during hot weather conditions. Prior to that time,
EECW would be automatically initiated on: (1) high drywell pressure, (2) loss of offsite power,
and (3) loss of RBCCW. Although manualinitiation was available, it was not used during
normal operation, other than for testing purposes. Initiation of EECW, either by automatic or Il ,
I '
.
J manual means, would isolate several non-ssfety-related loads, especially control rod drive 1
motor cooling. In order to use the EECW to augment RBCCW, operators would be required to i
restore these non-safety-related loads following manual initiation. When the safety evaluation j
was first approved, the Fermi 2 engineering staff assumed that any accidents would result in l
automatic initiation of EECW, along with re-isolation of the non-safety-related loads.
7
46
9803130111 990304
IIIIRIERHilBER
"**
Y p/
.
'
PDR
G
ADOCK 05000341
PDR
[
j
.
e
D. R. Gipson 2 March 4, 1998
In 1996, the NRR Project Manger identified the potential for an accident scenario outside
containment which would not re-isolate the non-safety-related loads. In following up on this
concem, engineering personnel performed a worst-case computer analysis and determined
that, during a high energy line break and without a concurrent loss of offsite power, some
components cooled by EECW apparently would not reosive adequate flow to handle their
design-basis heat load. To rectify this condition, the engineers determined that operator action
to rainitiate EECW following a high energy line break was necessary. The safety evaluation
was revised accordingly.
During review of the revised safety evaluation, the inspectors questioned whether a new EECW
failure mode had been introduced. The change to the facility to permit augmentation of
RBCCW normal loads by the EECW system potentially introduced an USQ because there was
now a possibility of a malfunction of a safety-related system that was different than that
evaluated in the safety an.Jysis report. It appeared that, when EECW augmented RBCCW, a
loss of RBCCW would not automatically start EECW and the non-safety-loads would not be
isolated, depriving the essentialloads of adequate cooling. This scenario was not previously
evaluated.
During the PEC, members of the Fermi 2 staff presented the results of additional analyses
which showed that the operator actions were not actually necessary following a high energy line ;
break. Based on this more realistic modeling of the post-accident heat sources, the staff was j
able to confirm that the safety related loads would still have received adequate cooling, even if i
the operators had not taken the procedurally required actions. Although this end result was
fortunate, the NRC is concemed that the Fermi 2 staff did not recognize that the Interim safety
evaluation, which concluded that operator action was necessary to ensure adequate cooling to
safety-related loads, posed an apparent USQ, based upon procedural guidance, and did not
take steps to resolve that discrepancy. The NRC depends on a licensee performing an
adequate safety analyses to determine whether or not an USQ exists. A licensee's safety
analysis for the existence of an USQ is fundamental to ensuring the bases on which the plant
was licensed are maintained. NRC determined that a major factor leading to the inadequate
analysis was an engineering mind set that use of operator actions was acceptable. Therefore,
the initial Fermi 2 analyses were done to show that sufficient time existed for the operator to
take action under an extreme set of heat load conditions, rather than to evaluate whether ,
operator actions were truly necessary. Once NRC questioned this premise, the Fermi 2 i
engineers identified the conservatism in the analyses, and, based on engineering judgement of I
the extent of the conservatisms, determined that sufficient flow would be available for
equipment cooling. This engineering judgement was then promptly confirmed through
computer analyses.
Therefore, after consultation with the Director, Office of Enforcement and in accordance with
the " General Statement of Policy and Procedures for NRC Enforcement Actions," NUREG-1600
(Enforcement Policy), the violation was categorized at Severity Level IV. This decision was
based on: 1) a detailed evaluation not being needed to resolve the matter; 2) the operator
actions not being necessary; and 3) given the time frame available, had the operators taken the
actions specified by the procedure, there was little likelihood of either operator error or adverse
consequences in taking the actions specified.
j
.
D. R. Gipson 3 March 4, 1998
.
During the conference, members of the Fermi 2 staff identified immediate corrective actions
including: restricting use of the EECW system in the augmentation mode, communication of
the safety evaluation deficiencies to all preparers and a review of other safety evaluations as I
part of the overall 10 CFR 50.59 upgrade program. The staff members also noted that all
safety evaluations were being approved by an engineering manager to ensure overall quality.
Also discussed were efforts to upgrade the 10 CFR 50.59 process. These included a reduced
number of preparers; additional training, with an emphasis on licensing basis documents;
procedural upgrades; and updated search capabilities. Finally, the staff noted that Fermi 2 was
participating in the industry initiatives on 10 CFR 50.59, and were performing a validation of the
updated final safety analysis report to remove inconsistencies. These corrective actions appear I
acceptable. ,
i
You are required to respond to this letter and should follow the instructions specified in the
enclosed Notice when preparing your response. In your response, you should document the
specific actions taken and any additional actions you plan to prevent recurrence. Your
response may reference or include previous docketed correspondence, if the correspondence
adequately addresses the required response. After reviewing your response to this Notice,
including your proposed corrective actions and the results of future inspections, the NRC will ;
determine whether further NRC enforcement action is necessary to ensure compliance with I
NRC regulatory requirements.
I
In accordance with 10 CFR 2.790 of the NRC's " Rules and Practice," a copy of this letter and its :
enclosures will be placed in the NRC Public Document Room (PDR). To the extent possible, I
your response should not include any personal privacy, proprietary, or safeguards .nformation I
so that it can be placed in the PDR without redaction. l
l
Sincerely,
original signed by H. O. Christensen
g
John A. Grobe, Director
Division of Reactor Safety
Docket No. 50-341 1
License No. NPF-43
Enclosures: 1. Notice of Violation
2. List of Attendees at Predecisional Enforcement Confesace
3. Licensee Slides Presented at Predecisional Enforcement Conference
cc w/encis: N. Peterson, Supervisor of Compliance l
P. A. Marquardt, Corporate Legal Department
Richard Whale, Michigan Public
Service Commission
Michigan Department of Public Health
Monroe County, Emergency Management Division
See Attached Distribution
DOCUMENT NAME: G:\DRS\FER02278.DRS
To receive a copy of this document. Indicate in the box "C" = Copy w/o attach /enci"E" = Copy w/ attach! enc'"N" = No copy
OFFICE Rlll:DRS C Rill;DRE Rill:DRP A[ NRR/OE /Y Rill:RAO E Rlll:DRS h
"
NAME Loug ed:sd J .
- k" OkVe"s w Ca _
n/ Grobe
DATE 2/23/98 2 / 2/I/98 3'y/98 2/.3 /98 / I/98
OFFICIAL RECORD COPY
(- .
.
D. R. Gipson 4 March 4, 1998
Distribution
Docket File w/encls Rlli PRR w/encls Rlli Enf. Coordinator w/encls
PUBLIC IE-01 w/encls SRI, Fermi w/encls TSS w/encls
LPM, NRR w/encls J. L. Caldwell, Rlll w/encls DOCDESK w/encls
DRP w/encls A. B. Beach, Rlli w/encls IEO w/encls
DRS w/encls J. Lieberman, OE w/encls J. Goldberg, OGC w/encls
B. Boger, NRR w/encls
l
l
.l
l l
!
,
.