ML20235W054
ML20235W054 | |
Person / Time | |
---|---|
Issue date: | 02/02/1987 |
From: | Roe J NRC |
To: | |
Shared Package | |
ML20235W048 | List: |
References | |
FOIA-87-388 NUDOCS 8710150563 | |
Download: ML20235W054 (2) | |
Text
. _ _ _. _
s ..
(v; n u
- x. -
. .. 1-
\
-0UTLINE-q
- 1. INTRODUCTION l u
- 2. TECHNICAL INTEGRATION CENTER (TIC) :
- a. BF.W Plant Safety Evaluation
- b. Code Applicability 3'. EXPERIMENTS (0VERVIEW)
- 4. OTSG SEPARATE EFFECTS {
- a. 0TSG Visual {
- b. OTSG Low Pressure Segment Facility
- c. OTSG Full Power
- 5. INTEGRAL SYSTEMS
- a. UMCP 2x4 I
- b. Improved Scaled Integral Facility (ISIF) !
- 6. INTEGRAL SYSTEM TEST ANALYSIS / SUPPORT
- a. IST Analysis
. 1
- b. IST Instrumentation and Facility Support
/J0TE: These two pages extracted from a February 2,1987, !
memorandum to Multiple Addressees from Jack W. Roe, i subject: " Minutes for Senior Contract Review Board (SCRB) Meeting #113 - January 29, 1987."
The memorandum and all other attachments to this memodonotfallwithinthescopeofrequestJ l
\
e, 8710150563 871014 PDR h0LL 3RR d/
i .:'.
+
. Q o. ;s: 1, l
)* .2 a. B&W Plant 1 Safety' Evaluation - (Under FIN A6328) .
i
! l Determine relative demands:of repre-h Objectives: l(1) sentative PWRs on' safety systems and L
L> operators L (2) Determine-if major differences are D included in PRAs' and'1f risk significant (3) Demonstrate operational' TIC. capability involving appropriate disciplines for:
issue resolution , ,
J Approach:
(1) Evaluate transient response of Oconee-(B&W),.
' Calvert Cliffs (CE), and H. B. Robinson-(W)-
'(2) SBLOCAr Steam line break and feedwater 1 line break transients analyzed' {
(3) Each transient assessed;using 1 (a) RELAP5 - T/H characteristics (b) Critical'. safety function' response trees -
alternate means for safe response (c)Operatorreliability l Products: (1) Supply plant comparison results to NRR by 4/87 l Ability to perform Follow-on analyses as needed (2) to evaluate:
(a) B&WQG recommendations (b) NRR recommendations (c) Other LWR safety issues not included in B&W reassessment I c .
l '
3 u
1