ML20235W054

From kanterella
Jump to navigation Jump to search
Outline Extracted from JW Roe 870202 Memo Re Minutes for Senior Contract Review Board Meeting 113 on 870129
ML20235W054
Person / Time
Issue date: 02/02/1987
From: Roe J
NRC
To:
Shared Package
ML20235W048 List:
References
FOIA-87-388 NUDOCS 8710150563
Download: ML20235W054 (2)


Text

. _ _ _.

(v; s..

nu 1-x.

\\

-0UTLINE-q 1.

INTRODUCTION u

2.

TECHNICAL INTEGRATION CENTER (TIC) a.

BF.W Plant Safety Evaluation b.

Code Applicability 3'

EXPERIMENTS (0VERVIEW) 4.

OTSG SEPARATE EFFECTS

{

a.

0TSG Visual

{

b.

OTSG Low Pressure Segment Facility c.

OTSG Full Power 5.

INTEGRAL SYSTEMS a.

UMCP 2x4 I

b.

Improved Scaled Integral Facility (ISIF) 6.

INTEGRAL SYSTEM TEST ANALYSIS / SUPPORT a.

IST Analysis 1

b.

IST Instrumentation and Facility Support

/J0TE: These two pages extracted from a February 2,1987, memorandum to Multiple Addressees from Jack W. Roe, i

subject:

" Minutes for Senior Contract Review Board (SCRB) Meeting #113 - January 29, 1987."

The memorandum and all other attachments to this memodonotfallwithinthescopeofrequestJ l

\\

e, 8710150563 871014 h0LL 3RR PDR d/

i.:'.

Q o.

s

1

+

l

)*

.2 a.

B&W Plant 1 Safety' Evaluation - (Under FIN A6328) i l

l(1)

Determine relative demands:of repre-h Objectives:

L sentative PWRs on' safety systems and L>

operators L

(2)

Determine-if major differences are D

included in PRAs' and'1f risk significant (3)

Demonstrate operational' TIC. capability involving appropriate disciplines for:

issue resolution J

Approach:

(1)

Evaluate transient response of Oconee-(B&W),.

' Calvert Cliffs (CE), and H. B. Robinson-(W)-

'(2)

SBLOCAr Steam line break and feedwater 1

line break transients analyzed'

{

(3)

Each transient assessed;using 1

(a) RELAP5 - T/H characteristics (b) Critical'. safety function' response trees -

alternate means for safe response (c)Operatorreliability l

Products:

(1)

Supply plant comparison results to NRR l

by 4/87 (2)

Ability to perform Follow-on analyses as needed to evaluate:

(a) B&WQG recommendations (b) NRR recommendations (c) Other LWR safety issues not included in B&W reassessment I

c l

3 u

1

.