Text
. _ _ _.
(v; s..
nu 1-x.
\\
-0UTLINE-q 1.
INTRODUCTION u
2.
TECHNICAL INTEGRATION CENTER (TIC) a.
BF.W Plant Safety Evaluation b.
Code Applicability 3'
EXPERIMENTS (0VERVIEW) 4.
OTSG SEPARATE EFFECTS
{
a.
0TSG Visual
{
b.
OTSG Low Pressure Segment Facility c.
OTSG Full Power 5.
INTEGRAL SYSTEMS a.
UMCP 2x4 I
b.
Improved Scaled Integral Facility (ISIF) 6.
INTEGRAL SYSTEM TEST ANALYSIS / SUPPORT a.
IST Analysis 1
b.
IST Instrumentation and Facility Support
/J0TE: These two pages extracted from a February 2,1987, memorandum to Multiple Addressees from Jack W. Roe, i
subject:
" Minutes for Senior Contract Review Board (SCRB) Meeting #113 - January 29, 1987."
The memorandum and all other attachments to this memodonotfallwithinthescopeofrequestJ l
\\
e, 8710150563 871014 h0LL 3RR PDR d/
i.:'.
Q o.
- s
1
+
l
)*
.2 a.
B&W Plant 1 Safety' Evaluation - (Under FIN A6328) i l
l(1)
Determine relative demands:of repre-h Objectives:
L sentative PWRs on' safety systems and L>
operators L
(2)
Determine-if major differences are D
included in PRAs' and'1f risk significant (3)
Demonstrate operational' TIC. capability involving appropriate disciplines for:
issue resolution J
Approach:
(1)
Evaluate transient response of Oconee-(B&W),.
' Calvert Cliffs (CE), and H. B. Robinson-(W)-
'(2)
SBLOCAr Steam line break and feedwater 1
line break transients analyzed'
{
(3)
Each transient assessed;using 1
(a) RELAP5 - T/H characteristics (b) Critical'. safety function' response trees -
alternate means for safe response (c)Operatorreliability l
Products:
(1)
Supply plant comparison results to NRR l
by 4/87 (2)
Ability to perform Follow-on analyses as needed to evaluate:
(a) B&WQG recommendations (b) NRR recommendations (c) Other LWR safety issues not included in B&W reassessment I
c l
3 u
1
.