ML20236P362

From kanterella
Revision as of 20:29, 20 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Application for Amends to Licenses NPF-37,NPF-66 & NPF-72, Revising Tech Spec Tables 3.3-6 & 4.3-3 to Allow Control Room Ventilation Sys to Remain in Operation,Provided That Radiation Monitors Operable on Ventilation Train.Fee Paid
ML20236P362
Person / Time
Site: Byron, Braidwood, 05000000
Issue date: 11/06/1987
From: Hunsader S
COMMONWEALTH EDISON CO.
To: Murley T
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM), Office of Nuclear Reactor Regulation
Shared Package
ML20236P365 List:
References
3801K, NUDOCS 8711170265
Download: ML20236P362 (2)


Text

e- 1

' ~ N ' Commonwealth Edison

/ One First National Plan, Chicago, Illinois . .;

' ~ ] x Address Reply to: Post Office Box 767

' Chicago, Illinois 60690 - 0767 -

y xm,,-

0 November 6, 1987 i

Mr. Thomas E. Murley, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 Attn: Document Control Desk

Subject:

Byron Station Units 1 and 2 Braidwood Station Units 1 and 2 Application for Amendment to Facility Operating Licenses NPF-37, NPF-66, and NpF-72 Appendix A, Technical Specifications NRC Docket Nos. 50-454, 50-455, 50-456 and 50-457

Dear Mr. Murley:

Pursuant to 10 CFR 50.90, commonwealth Edison proposes to amend Appendix A, Technical Specifications, of Facility Operating Licenses NpF-37, NpF-66,'and NpF-72. The proposed amendment requests changes to Technical Specification Tables 3.3-6 and 4.3-3, to allow the control room ventilation (VC) system to remain in operation, providing there are two (2) radiation monitors operable on the ventilation train that is operating. These changes apply to Braidwood Station. Unit 2 as well.

The revised Technical Specification pages are contained in Attachment A. The description and summary of the' proposed changes is l presented in Attachment B.

The proposed changes have been reviewed and approved by both on-site and off-site review in accordance with Commonwealth Edison procedures. Commonwealth Edison has reviewed this proposed amendment in accordance with 10 CFR 50.92(c) and has determined that no significant hazards consideration exists. This evaluation is documented in Attachment C.

Commonwealth Edison is notifying the State of Illinois of our application for this amendment by transmitting a copy of this letter and its attachments to the designated State Official.

b 8711170265 871106 PDR h

P ADOCK 05000454 i dg

}gh pyg \

o _ - -- _-- - -- - _ - - _ - - - - - a

m_

Nov;mbar 6, 1987 US.NRC In accordance with 10 CFR 170, a fee remittance in the amount of I

$150.00 is enclosed.

Please direct any questions you may have concerning this matter to this office.

Very truly yours,

. C.

S. C. Hunsader Nuclear Licensing Administrator j cs

Enclosure:

Fee Remittance Attachments (A): Propoced Technical Specification Changes (B): Description and Summary (C): Evaluation of Significant Hazards Consideration i

cc: Resident' Inspector - Byron Resident Inspector - Braidwood L. N. Olshan - NRR S. Sands - NRR Region III Office M. C. Parker - State of Ill.

3801K i

l l

l l

l _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _