ML20249B677
| ML20249B677 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 06/18/1998 |
| From: | Grobe J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Kingsley O COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20249B678 | List: |
| References | |
| 50-456-98-07, 50-456-98-7, 50-457-98-07, 50-457-98-7, NUDOCS 9806240044 | |
| Download: ML20249B677 (3) | |
See also: IR 05000456/1998007
Text
-_-____.
. . .. .
.
'. ,
-
- v
LJune 18, 1998 J
l
Mr. Oliver D. Kingsley . .
- President, Nuclear Generation Group -
>
.. Commonwealth Edison Company
- ATTN: Regulatory Services
- Executive Towers West ll1
1400 Opus Place, Suite 500
Downers Grove, IL 60515 -
SUBJECT: NRC BRAIDWOOD EMERGENCY PREPAREDNESS EXERCISE INSPECTION :
REPORTS 50-456/98007(DRS); 50-457/98007(DRS)
< WDear Mr. Kingsley:
- On May 22,1998, the NRC completed an inspection of your emergency preparedness biennial
' exercise at the Braidwood Nuclear Generating Station, Units.1 and 2.- The purpose of this
'
. inspection was to evaluate the performance of the emergency response organization during the
exercise. The enclosed report presents the results of that inspection.
' Areas examined within your emergency preparedness exercise performance are identifed in
the report. Within those areas, the inspection consisted of a selective examination of
procedures and representative records, observation of performance, and interviews with staff. ~
The objective of the inspection effort was to determine whether the Emergency Plan was
- adequate and station personnel were capable of implementing the Emergency Plan in
.
- accordance with NRC requirements. Based on the results of this inspection, no violations of
NRC requirements were identified.
, Overall performance during the 1998 Emergency Preparedness exercise demonstrated that
your emergency plan implementation activities were generally met regulatory requirements.
, Performance in the Control Room Simulator was professional and technically proficient. Overall
- performance of Operations Support Center staff was appropriate Personnel demonstrated
initiative in contending with simulated elevated radiation levels in the facility. Technical Support
" Center personnel demonstrated effective response to the simulated emergency conditions.
> . : Corporate Emergency Operations facility (EOF) and near site EOF responders provided .
appropriate emergency response management and support, and efficiently communicated with
L - State officials. Interfacility, transfers of command and control of event response were orderly
"
P and timely.> The exercise scenario was challenging.
4
n -
\
1 -
p . .
.
$'
-
l
'
990Mt 4 990618
o ,. PDR- K OS0004S6 @}
( n' ,,e , .
PDR ._ g
,
.
- .= ,
L__[. A_ -,_._. .
.
. . . ' - . , ,e 2 . r - -
- _. . __-_- --___-_-_- _-_ - __ - __ - -
1.;}:
>
,
A
L O. Kingsley -
In accordar.w with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room (PDR).
Sincerely,-
Original-Signed by John A. Grobe:
John A. Grobe, Director .
Division of Reactor Safety
Docket Nos. 50-456; 50-457
,
, Enclosure: Inspection Reports 50-456/98007(DRS); 50-457/98007(DRS)
cc w/ encl: M. Wallace, Senior Vice President
D. Helwig, Senior Vice President
G. Stanley, PWR Vice President
J. Perry, BWR Vice President
D. Farrar, Regulatory
Services Manager
1. Johnson, Licensing Director
DCD - Licensing -
T. Tulon, Site Vice President
Braidwood Station Manager
T. Simpkin, Regulatory
Assurance Supervisor
Richard Hubbard -
b : Nathan Schloss, Economist
Office of the Attomey General
4
.. State Liaison Officer
Chairman, Illinois Commerce
Commission .
S
. DOCUMENT NAME:' G:DRS\ BRA 98007.DRS: )
v. . amem wv.com n v.c.. v . = co ,
,.,
'
OFFICE = Rlli $Mrf l- Rlli . - c 2,- ' l -- Rlli . _ g Rlli na l
- ' '
_
'
NAME: RJicklind'jp JCreedji ' MJordan M4 '
JGroW
DATE- 06/// /98- 06/# /96 : 06M /98 06/)W8
_ OFRCIAL RECORD COPY ;
,
,
{
. _.
y
' '4
5:q :q
_ _ _. - __
_ _ _ _ - - _ _ - _ _ - . -_.. __ _- _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ - - _ _ _ _ _ _ _
sx
L. k -
o
O. Kingsley 3
I
!
L Distribution:
l. SAR (E-Mail)
l Project Mgr., NRR w/enci
- C. Paperiello, Rlll w/enci
- J. Caldwell, Rill w/enci
B. Clayton, Rlll w/enci
. SRI Braidwood w/enci
'
DRP w/enci
TSS w/ encl
DRS w/enci
Rlll PRR w/enci -
Pl;3LIC IE-35 w/enci
Docket File w/enci
GREENS
IEO (E-Mail)
DOCDESK (E Mail)
4
i
,
,
./
. . . . .
'
23H153
i