Text
-_-____.
. . .. .
.
' .
,
-:v
LJune 18, 1998
J
l
Mr. Oliver D. Kingsley
. .
- President, Nuclear Generation Group -
.. Commonwealth Edison Company
>
- ATTN: Regulatory Services
- Executive Towers West ll1
1400 Opus Place, Suite 500
Downers Grove, IL 60515 -
SUBJECT:
NRC BRAIDWOOD EMERGENCY PREPAREDNESS EXERCISE INSPECTION :
REPORTS 50-456/98007(DRS); 50-457/98007(DRS)
< WDear Mr. Kingsley:
- On May 22,1998, the NRC completed an inspection of your emergency preparedness biennial
' exercise at the Braidwood Nuclear Generating Station, Units.1 and 2.- The purpose of this
. inspection was to evaluate the performance of the emergency response organization during the
'
exercise. The enclosed report presents the results of that inspection.
' Areas examined within your emergency preparedness exercise performance are identifed in
the report. Within those areas, the inspection consisted of a selective examination of
procedures and representative records, observation of performance, and interviews with staff.
~
The objective of the inspection effort was to determine whether the Emergency Plan was
- adequate and station personnel were capable of implementing the Emergency Plan in
.
- accordance with NRC requirements. Based on the results of this inspection, no violations of
NRC requirements were identified.
Overall performance during the 1998 Emergency Preparedness exercise demonstrated that
,
your emergency plan implementation activities were generally met regulatory requirements.
, Performance in the Control Room Simulator was professional and technically proficient. Overall
- performance of Operations Support Center staff was appropriate Personnel demonstrated
initiative in contending with simulated elevated radiation levels in the facility. Technical Support
Center personnel demonstrated effective response to the simulated emergency conditions.
"
- Corporate Emergency Operations facility (EOF) and near site EOF responders provided .
> .
appropriate emergency response management and support, and efficiently communicated with
L
- State officials. Interfacility, transfers of command and control of event response were orderly
P
and timely.> The exercise scenario was challenging.
"
4
\\
-
n
1
-
.
$'
p .
.
l
-
@}
'
990Mt
4 990618
o
PDR-
K OS0004S6
,.
( n'
,,e
.
._ g
,
.=
.
,
,
L__[. A_
- , _ . _ .
.
.
. . . ' -
.
,
,e
2
.
r
-
-
-
_. .
__-_- --___-_-_- _-_ - __ - __ - -
1.;}:
>
,
A
L O. Kingsley -
In accordar.w with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room (PDR).
Sincerely,-
Original-Signed by John A. Grobe:
John A. Grobe, Director .
Division of Reactor Safety
Docket Nos. 50-456; 50-457
Enclosure:
Inspection Reports 50-456/98007(DRS); 50-457/98007(DRS)
,
,
cc w/ encl:
M. Wallace, Senior Vice President
D. Helwig, Senior Vice President
G. Stanley, PWR Vice President
J. Perry, BWR Vice President
D. Farrar, Regulatory
Services Manager
1. Johnson, Licensing Director
DCD - Licensing -
T. Tulon, Site Vice President
Braidwood Station Manager
T. Simpkin, Regulatory
Assurance Supervisor
Richard Hubbard -
b
- Nathan Schloss, Economist
Office of the Attomey General
4
.. State Liaison Officer
Chairman, Illinois Commerce
Commission .
S
. DOCUMENT NAME:' G:DRS\\ BRA 98007.DRS:
)
v.
.
amem wv.com
n
v.c..
v . = co ,
OFFICE = Rlli
$Mrf
l-
Rlli . - c 2,-
' l --
Rlli .
Rlli na
l
'
_ g
, . ,
_
NAME:
RJicklind'jp
JCreedji '
MJordan M4
JGroW
' '
'
DATE-
06/// /98-
06/# /96 :
06M /98
06/)W8
' ' '
_ OFRCIAL RECORD COPY ;
,
,
{
.
_.
y
'
'4
5:q :q
_ _
_.
-
__
_ _ _ _ - - _ _
- _ _ - . -_.. __ _- _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ -
- _ _ _ _ _ _ _
sx
L. k -
o
O. Kingsley
3
I
!
L
Distribution:
l.
SAR (E-Mail)
l
Project Mgr., NRR w/enci
- C. Paperiello, Rlll w/enci
- J. Caldwell, Rill w/enci
B. Clayton, Rlll w/enci
. SRI Braidwood w/enci
DRP w/enci
'
TSS w/ encl
DRS w/enci
Rlll PRR w/enci -
Pl;3LIC IE-35 w/enci
Docket File w/enci
GREENS
IEO (E-Mail)
DOCDESK (E Mail)
4
i
,
,
./
.
. .
. .
'
23H153
i