ML20262E202
From kanterella
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ML20262E202 | |
Person / Time | |
---|---|
Site: | Perry |
Issue date: | 01/05/1984 |
From: | GILBERT/COMMONWEALTH, INC. (FORMERLY GILBERT ASSOCIAT |
To: | CLEVELAND ELECTRIC ILLUMINATING CO. |
Shared Package | |
ML20126M785 | List:
|
References | |
D-811-605, NUDOCS 8508070606 | |
Download: ML20262E202 (1) | |
Similar Documents at Perry | |
---|---|
Category:ARRANGEMENT-GENERAL--DRAWINGS-APPLICANT'S FACILITY
MONTHYEARML20262E2251984-06-0404 June 1984
[Table view]I&C Location Layout Auxiliary Building Above Elevation 620 Ft 6 Inches West ML20262E2161984-04-0606 April 1984 Location Layout Reactor Building Above Elevation 642 Ft West ML20262E2381984-02-0808 February 1984 I&C System D17 Plant Radiation Monitoring K670,K700,K760 ML20262E1931984-02-0707 February 1984 I&C Location Layout Reactor Building Above Elevation 574 Ft 10 Inches East ML20263G9301984-01-0505 January 1984 Plant Layout Plan Above Elev 767 Ft Reactor Buildings. Rev Date Illegible ML20263G9321984-01-0505 January 1984 Final Plant Layout Section a Unit 1 Auxiliary Building Reactor Building & Fuel Handling Area. Rev Date Illegible ML20262E2331984-01-0505 January 1984 I&C Location Layout Fuel Handling Building Above El 620 Ft 6 Inches ML20262E2291984-01-0505 January 1984 I&C Location Layout Intermediate Building Above Elevation 654 Ft 6 Inches North ML20262E2201984-01-0505 January 1984 I&C Location Layout Reactor Building Above Elevation 642 Ft East ML20262E2071984-01-0505 January 1984 I&C Location Layout Reactor Building Above Elevation 620 Ft 6 Inches East ML20262E2021984-01-0505 January 1984 I&C Location Layout Reactor Building Above Elevation 620 Ft 6 Inches West ML20262E1981984-01-0505 January 1984 I&C Location Layout Reactor Bldg Above El 599 Ft 9 Inches East ML20263G9141984-01-0505 January 1984 Final Plant Layout Plan Above 620 Ft 6 Inches Turbine Power Complete Auxiliary Building and Reactor Building. Rev Date Illegible ML20263G9171984-01-0505 January 1984 Final Plant Layout Plan Above El 642 Ft Reactor Bldg - Aux Bldg Roof & El 642 Ft 6 Inches Turbine Power Complex. Rev Date Illegible ML20263G9221984-01-0505 January 1984 Final Plant Layout Plan Above Elev 664 Ft 7 Inches Reactor Building. Rev Date Illegible ML20263G9251984-01-0505 January 1984 Final Plant Layout Plan Above Elev 639 Ft 6 Inches Reactor Building Refueling Floor. Rev Date Illegible ML20263G9281984-01-0505 January 1984 Final Plant Layout Plan Above Elev 721 Ft Reactor Building. Rev Date Illegible ML20263G9181982-10-29029 October 1982 Final Plant Layout Plan Above El 652 Ft 6 Inches Aux Bldg Roof El 664 Ft Reactor Bldg & El 667 Ft 6 Inches Turb Power Complex Roof ML20263B1371981-06-19019 June 1981 Control of Heavy Loads Study:Auxiliary Bldg El 599-0 West ML20263B1121981-06-19019 June 1981 Control of Heavy Loads Study:Plan a Control of Heavy Loads ML20263B1141981-06-19019 June 1981 Control of Heavy Loads Study:Auxiliary Bldg Plan El 574 Ft 10 East ML20263B1181981-06-19019 June 1981 Control of Heavy Loads Study:Auxiliary Bldg Plan El 574-10 West ML20263B1251981-06-19019 June 1981 Control of Heavy Loads Study:Plan B Control of Heavy Loads ML20263B1321981-06-19019 June 1981 Control of Heavy Loads Study:Auxiliary Bldg El 599-0 East ML20263B1421981-06-19019 June 1981 Control of Heavy Loads Study:Plan C Control of Heavy Loads ML20263B1481981-06-19019 June 1981 Control of Heavy Loads Study:Auxiliary Bldg Plan El 620-6 East ML20263B1511981-06-19019 June 1981 Control of Heavy Loads Study:Auxiliary Bldg Plan El 620-6 West ML20263B1601981-06-19019 June 1981 Control of Heavy Loads Study:Plan D Control of Heavy Loads ML20263B1641981-06-19019 June 1981 Control of Heavy Loads Study:Plan E Control of Heavy Loads ML20263B1681981-06-19019 June 1981 Control of Heavy Loads Study:Plan F Control of Heavy Loads ML20263B1721981-06-19019 June 1981 Control of Heavy Loads Study:Plan G Cont of Heavy Loads ML20263B1741981-06-19019 June 1981 Control of Heavy Loads Study:Emerg Ser Wat Cont of Heavy Loads ML20263B1781981-06-19019 June 1981 Control of Heavy Loads Study:Refueling Flor Cont of Heavy Loads ML20263B1831981-06-19019 June 1981 Control of Heavy Loads Study:Fuel Handling Building ML20260H4151981-01-14014 January 1981 Final Plant Layout:Plan Above Elev 620 Ft 6 Inches Control Complex & Diesel Generator Building ML20262E2101980-12-0909 December 1980 I&C Location Layout Reactor Building Above El 599 Ft 9 Inches West ML20261B6281977-03-31031 March 1977 Caisson Barrier for Ice Protection of Intake Structure 1984-06-04 Category:DRAWINGS MONTHYEARML20262E8281993-12-0606 December 1993
[Table view]Shroud and Top Guide Data.Sheet 1 of 2 ML20262E8321993-12-0606 December 1993 Shroud and Top Guide Data.Sheet 2 of 2 ML20261E4961991-11-11011 November 1991 Civil Site STORM Drainage Plan - South Half.Drawing Not Dtd ML20261E5011991-11-11011 November 1991 Civil Site STORM Drainage Plan - North Half.Drawing Not Dtd ML20261J2101986-05-30030 May 1986 Plant Industrial Waste Transformer Basins Plan & Details ML20261B6231985-11-11011 November 1985 Civil Location Plan ML20265A6291985-10-31031 October 1985 Piping System Diagram:E12 Residual Heat Removal System ML20265A6241985-10-31031 October 1985 Piping System Diagram:E12 Residual Heat Removal System ML20262G0101985-09-18018 September 1985 Electrical Lighting Layout Control Complex - East & West - El 654 Ft 6 Inches, as-built ML20262G0151985-09-18018 September 1985 Electrical Lighting Layout Control Complex - Luminous Ceiling - El 654 Ft 6 Inches, as-built ML20262E1781985-07-22022 July 1985 Piping System Diagram:B31 Leak Detection System. No Rev Date ML20261G2621985-05-0909 May 1985 Electrical One Line Diagram:Class 1E DC System, as-built. Rev Date Illegible ML20262E2861985-04-18018 April 1985 Electrical Elementary Diagram:Leak Detection System Sensitive Sump Monitor. Sheet A15 ML20262E2811985-04-18018 April 1985 Electrical Elementary Diagram:Leak Detection System Leakage Flow Monitors. Sheet A08 ML20262E2521985-04-10010 April 1985 Electrical Elementary Diagram:Containment Atmosphere Monitoring Drywell Train a Temperature Process Instrumentation. Sheet 212 ML20262E2671985-04-10010 April 1985 Electrical Elementary Diagram:Containment Atmosphere Monitoring Drywell Train a Temperature Process Instrumentation. Sheet 210 ML20262E2571985-04-10010 April 1985 Electrical Elementary Diagram:Containment Atmosphere Monitoring Drywell Train B Temperature Process Instrumentation. Sheet 213 ML20262E2721985-04-10010 April 1985 Electrical Elementary Diagram:Containment Atmosphere Monitoring Drywell Train B Pressure Process Instrumentation. Sheet 205 ML20262E2621985-04-10010 April 1985 Electrical Elementary Diagram:Containment Atmosphere Monitoring Drywell Train B Temperature Process Instrumentation. Sheet 211 ML20262E2761985-04-10010 April 1985 Electrical Elementary Diagram:Containment Atmosphere Monitoring Drywell Train a Pressure Process Instrumentation. Sheet 204 ML20262E2481985-02-27027 February 1985 Electrical Elementary Diagram:Plant Radiation Monitoring System Drywell - Gas. Sheet 211 ML20261G2711984-12-0606 December 1984 Electrical-Elementary Diagram:Control Room Annunciator Division 3 Diesel DC System Trouble, as-built.Sheet 283 ML20261G2661984-12-0606 December 1984 Electrical-Elementary Diagram:Control Room Annunciator ECCS Benchboard (1H13-P601) Section 16A. Sheet 282 ML20261G2501984-12-0303 December 1984 Electrical-Elementary Diagram:Metal Clad Switchgear 15 & 15 Kv 4.16 Kv Bus EH13 Diesel Brkr EH1301. Sheet 37 ML20261M8331984-09-24024 September 1984 Recirculation Elbow (Welded) Cal Block PY-22-XX2-5S-F ML20261G2541984-09-24024 September 1984 Electrical-Elementary Diagram:Dc Systems Metering & Relaying Bus ED-1-A, as-built.Sheet 14 ML20262E1801984-09-21021 September 1984 Piping System Diagram:D23 Containment Atmosphere Monitoring System ML20261G2581984-09-21021 September 1984 Electrical-Elementary Diagram:Dc Systems Metering & Relaying Bus ED-1-B, as-built.Sheet 15 ML20261M8301984-07-31031 July 1984 Reactor Recirculation Cal Blocks (Welded) ML20265A6071984-07-27027 July 1984 Piping System E12 Residual Heat Removal - Auxiliary Building Sections ML20265A6191984-07-27027 July 1984 Piping System E12 Residual Heat Removal - Auxiliary Building Plan El 568 Ft 4 Inches and 574 Ft 10 Inches (West) ML20265A6141984-07-27027 July 1984 Piping System E12 Residual Heat Removal - Auxiliary Building El 599 Ft - Plans & Sections ML20262E2251984-06-0404 June 1984 I&C Location Layout Auxiliary Building Above Elevation 620 Ft 6 Inches West ML20262E1701984-05-17017 May 1984 Piping System B21,B31 Leak Detection System and Reactor Head Vent Drain Reactor Building - Sections ML20261G4701984-05-0404 May 1984 Mechanical Details:Pool Swell Deflector Assembly for Valves ML20263P0221984-04-0909 April 1984 Piping System Diagram E21 Low Pressure Core Spray System. Rev Date Illegible ML20262E2161984-04-0606 April 1984 Location Layout Reactor Building Above Elevation 642 Ft West ML20262E3051984-02-27027 February 1984 I&C Instrument Diagram:Drywell Atmosphere Radiation Monitor D17-K670 H51-PC71 ML20262C2191984-02-24024 February 1984 Piping System E12 Residual Heat Removal System Reactor Bldg Plan El 539 Ft-9 Inches and 574 Ft-10 Inches - East ML20262C2151984-02-24024 February 1984 Piping System E12,Residual Heat Removal System Reactor Building - Plan El 590 Ft 9 Inches and El 574 Ft 10 Inches West ML20262E2911984-02-15015 February 1984 I&C Instrument Diagram:Drywell Area Equipment Drain Sump Level Leak Detection ML20262E2381984-02-0808 February 1984 I&C System D17 Plant Radiation Monitoring K670,K700,K760 ML20262E1931984-02-0707 February 1984 I&C Location Layout Reactor Building Above Elevation 574 Ft 10 Inches East ML20262E1841984-01-13013 January 1984 Instrument Diagram:Containment Atmosphere Monitoring and Vacuum Relief Systems B Loop ML20262E2291984-01-0505 January 1984 I&C Location Layout Intermediate Building Above Elevation 654 Ft 6 Inches North ML20263G9281984-01-0505 January 1984 Final Plant Layout Plan Above Elev 721 Ft Reactor Building. Rev Date Illegible ML20262E2071984-01-0505 January 1984 I&C Location Layout Reactor Building Above Elevation 620 Ft 6 Inches East ML20263G9321984-01-0505 January 1984 Final Plant Layout Section a Unit 1 Auxiliary Building Reactor Building & Fuel Handling Area. Rev Date Illegible ML20263G9251984-01-0505 January 1984 Final Plant Layout Plan Above Elev 639 Ft 6 Inches Reactor Building Refueling Floor. Rev Date Illegible ML20263G9171984-01-0505 January 1984 Final Plant Layout Plan Above El 642 Ft Reactor Bldg - Aux Bldg Roof & El 642 Ft 6 Inches Turbine Power Complex. Rev Date Illegible 1993-12-06 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20262E202&oldid=3136667"