ML20263M174 | |
Person / Time | |
---|---|
Site: | Satsop |
Issue date: | 03/10/1980 |
From: | EBASCO SERVICES, INC. |
To: | WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
Shared Package | |
ML20064F801 | List:
|
References | |
D-6080, WPPS-3240, NUDOCS 8303140038 | |
Download: ML20263M174 (1) | |
Similar Documents at Satsop | |
---|---|
Category:DRAWINGS
MONTHYEARML20265D2001988-04-13013 April 1988
[Table view]Transformer Yard Sections ML20265D1911985-09-19019 September 1985 Satsop Substation A.C. Station SVC One Line Diagram. Sheet 1 of 1 ML20265D1821985-09-19019 September 1985 Construction One Line Diagram,Satsop Substation. Sheet 1 of 1 ML20265D1871985-03-19019 March 1985 Satsop Substation Plot Plan. Sheet 1 of 1 ML20263B4751983-09-0202 September 1983 Reactor Auxiliary Building CVCS Rupture Restraints & Jet Impingement Barrier. Rev Date Illegible ML20263B2761983-09-0202 September 1983 Reactor Bldg Internal Conc Containment Vessel Support M & R. Sheet 3.No Rev Date ML20263B2851983-09-0202 September 1983 Reactor Bldg Internal Conc Internal Base Conc - M. Sheet 3.No Rev Date ML20259D2191983-07-15015 July 1983 Plot Plan - Category I Structures. No Date ML20259D2231983-07-15015 July 1983 Radioactive Lines After Design Basis Accident Chemical & Volume Control System. Sheet 1 of 3.No Date ML20259D2281983-07-15015 July 1983 Radioactive Lines After Design Basis Accident Chemical & Volume Control System. Sheet 2 of 3.No Date ML20259D2331983-07-15015 July 1983 Marked-up Radioactive Liner After Design Basis Accident Chemical & Volume Control System. Sheet 3 of 3.No Date ML20259D2371983-07-15015 July 1983 Radioactive Lines After Design Basis Accident Safety Injection System. No Date ML20259D2421983-07-15015 July 1983 Radioactive Lines After Design Basis Accident Containment Spray System. No Date ML20263B4431983-05-26026 May 1983 General Arrangement:Reactor Auxiliary Building Sections. Sheet 5 ML20263B4411983-05-26026 May 1983 General Arrangement:Reactor Auxiliary Building Plan at El 335 Ft ML20265D2091983-04-13013 April 1983 Transformer Yard Arrangement Plan ML20265D2041983-04-13013 April 1983 Transformer Yard Sections ML20265D1941983-03-28028 March 1983 230 Kv Underground Tie Line Plan & Profile ML20263B4341983-03-10010 March 1983 Radioactive Lines After Design Basis Accident Containment Spray System ML20263B4301983-03-0909 March 1983 Radioactive Lines After Design Basis Accident Safety Injection System ML20263B4811983-02-25025 February 1983 Architectural Roof Plan ML20263B4841983-02-25025 February 1983 Architectural Details & Sections. Sheet 3 ML20263B2871983-02-25025 February 1983 Reactor Bldg Internal Conc Internal Base Conc - R. Sheet 1 ML20265D2141983-01-27027 January 1983 500 Kv Transmission Line. Sheet 1 of 2 ML20263B4581983-01-14014 January 1983 Reactor Auxiliary Bldg El 335 Ft Cable Trays & Conduits Seismic Supports. Sheet 5 ML20263B4611983-01-10010 January 1983 Break & Restraint Locations Auxiliary Steam and Condensate Piping. Sheet 1 of 5 ML20263B4561983-01-0707 January 1983 Reactor Auxiliary Building El 335 Ft Cable Trays & Conduits Seismic Supports. Sheet 4 ML20263J8351983-01-0303 January 1983 Elementary Wiring Diagram:Solenoid Operated Valves. Sheet 35 of 41.Rev Date Illegible ML20263J9001983-01-0303 January 1983 Elementary Wiring Diagram:Solenoid Operated Valves. Sheet 3 of 41.Rev Date Illegible ML20263J8971983-01-0303 January 1983 Elementary Wiring Diagrams:Solenoid Operated Valves. Sheet 2 of 2.Rev Date Illegible ML20263J8931983-01-0303 January 1983 Elementary Wiring Diagram:Solenoid Valves. Sheet 1 of 2. Rev Date Illegible ML20263J8901983-01-0303 January 1983 Elementary Wiring Diagram:Solenoid Operated Valve. Sheet 2 of 41.Rev Date Illegible ML20263J8871983-01-0303 January 1983 Elementary Wiring Diagram:Electro Pneumatic Valve Index. Rev Date Illegible ML20263J8671983-01-0303 January 1983 Elementary Wiring Diagram:Solenoid Operated Valves. Sheet 24 of 41.Rev Date Illegible ML20263J8641983-01-0303 January 1983 Elementary Wiring Diagram:Solenoid Operated Valves. Sheet 25 of 41.Rev Date Illegible ML20263J8611983-01-0303 January 1983 Elementary Wiring Diagram:Solenoid Operated Valves. Sheet 26 of 41.Rev Date Illegible ML20263J8581983-01-0303 January 1983 Elementary Wiring Diagram:Solenoid Operated Valves. Sheet 27 of 41.Rev Date Illegible ML20263J8521983-01-0303 January 1983 Elementary Wiring Diagram:Solenoid Operated Valves. Sheet 29 of 41.Rev Date Illegible ML20263J5001983-01-0303 January 1983 Elementary Wiring Diagram:General Notes. Revision Date Illegible ML20263J5211983-01-0303 January 1983 Elementary Wiring Diagram:Pump Motor Controls. Sheet 1 of 3.Rev Date Illegible ML20263J6411983-01-0303 January 1983 Sbm Control Switch Development. Rev Date Illegible ML20263J6441983-01-0303 January 1983 Elementary Wiring Diagram:Switch Development. Sheet 1 of 4.Rev Date Illegible ML20263J7181983-01-0303 January 1983 Elementary Wiring Diagram:Electro-Pneumatic Valves. Sheet 3 of 5.Rev Date Illegible ML20263J8081983-01-0303 January 1983 Elementary Wiring Diagram:Pump Motor Controls. Sheet 6 of 9.Rev Date Illegible ML20263J8041983-01-0303 January 1983 Elementary Wiring Diagram:Pump Motor Controls. Sheet 8 of 9.Rev Date Illegible ML20263J8121983-01-0303 January 1983 Elementary Wiring Diagram:Pump Motor Controls. Sheet 4 of 9.Rev Date Illegible ML20263J8181983-01-0303 January 1983 Elementary Wiring Diagram:Motor-Operated Valves. Sheet 1 of 4.Rev Date Illegible ML20263J8221983-01-0303 January 1983 Elementary Wiring Diagram:Solenoid Operated Valves. Sheet 41 of 41.Rev Date Illegible ML20263J8001983-01-0303 January 1983 Elementary Wiring Diagram:Legend and Device Table. Sheet 1 of 2.Rev Date Illegible ML20263J7921983-01-0303 January 1983 Elementary Wiring Diagram:Electro Pneumatic Valve. Rev Date Illegible 1988-04-13 Category:INSTRUMENTATION DRAWINGS-APPLICANT'S FACILITY MONTHYEARML20263B4341983-03-10010 March 1983
[Table view]Radioactive Lines After Design Basis Accident Containment Spray System ML20263B4301983-03-0909 March 1983 Radioactive Lines After Design Basis Accident Safety Injection System ML20263B4191982-12-17017 December 1982 Radioactive Lines After Design Basis Accident Chemical & Volume Control System. Sheet 1 of 3 ML20263B4271982-12-17017 December 1982 Radioactive Lines After Design Basis Accident Chemical & Volume Control System. Sheet 3 of 3 ML20263B4221982-12-17017 December 1982 Radioactive Lines After Design Basis Accident Chemical & Volume Control System. Sheet 2 of 3 ML20263M6041982-08-0606 August 1982 Instrument Schematic - Logic Diagram:Rb - Unidentified Leak Detection System. Sheet 603B ML20263M6001982-08-0606 August 1982 Instrument Schematic - Logic Diagram:Rb Unidentified Leak Detection Sys. Sheet 603A ML20263M5971982-08-0606 August 1982 Instrument Schematic - Logic Diagram:Rb Identified Leak Detection Sys. Sheet 602 ML20263M5921982-08-0606 August 1982 Instrument Schematic - Logic Diagram:Rb Identified Leak Detection System. Sheet 601B ML20263M5891982-08-0606 August 1982 Instrument Schematic - Logic Diagram:Rb Identified Leak Detection System. Sheet 601A ML20263M6081982-08-0606 August 1982 Instrument Schematic - Logic Diagram:Rb - Unidentified Leak Detection System. Sheet 603C ML20263M0291982-07-29029 July 1982 Instrument Schematic - Logic Diagram:Shutdown Cooling Hexr A(Sa) & Containment Analyzer A(Sa) CCW Outlet Valves. Sheet 155B ML20263M0091982-07-29029 July 1982 Instrument Schematic - Logic Diagram:Ccw Suction & Essential Header a Isolation Valves. Sheet 152B ML20263M0621982-07-29029 July 1982 Instrument Schematic - Logic Diagram:Shutdown Cooling Heat Exchanger B(Sb). Sheet 161A ML20263M0561982-07-29029 July 1982 Instrument Schematic - Logic Diagram:Containment Spray Pump Motor Cooler B(Sb). Sheet 160A ML20263M0591982-07-29029 July 1982 Instrument Schematic - Logic Diagram:Containment Spray Pump Motor Cooler B(Sb) CCW Outlet Valve. Sheet 160B ML20263M0641982-07-29029 July 1982 Instrument Schematic - Logic Diagram:Shutdown Cooling Hexr B(Sb) & Containment Analyzer B(Sb) CCW Outlet Valves. Sheet 161B ML20263M0441982-07-29029 July 1982 Instrument Schematic - Logic Diagram:Ccw Suction & Essential Header B Isolation Valves. Sheet 158B ML20263M0471982-07-29029 July 1982 Instrument Schematic - Logic Diagram:Ccw Essential Hdr B & Containment Isolation Valves. Sheet 158C ML20263M0501982-07-29029 July 1982 Instrument Schematic - Logic Diagram:Ccw Pumps 1B & 2B (Sb). Sheet 159A ML20263M0341982-07-29029 July 1982 Instrument Schematic - Logic Diagram:Ccw Heat Exchanger B(Sb). Sheet 158A ML20263M0261982-07-29029 July 1982 Instrument Schematic - Logic Diagram:Shutdown Cooling Heat Exchanger A(Sa). Sheet 155A ML20263M0321982-07-29029 July 1982 Instrument Schematic - Logic Diagram:Hvac Chiller & Emergency Diesel Gen Heat Exchanger A(Sa). Sheet 156A ML20263M0411982-07-29029 July 1982 Instrument Schematic - Logic Diagram:Ccw Dry Cooling Tower and CCW Surge Tank B(Sb). Sheet 157 ML20263M0531982-07-29029 July 1982 Instrument Schematic - Logic Diagram:Ccw Pumps 1B & 2B (Sb). Sheet 159B ML20263M0121982-07-29029 July 1982 Instrument Schematic - Logic Diagram:Ccw Essential Hdr a & Containment Isolation Valves. Sheet 152C ML20263M0201982-07-29029 July 1982 Instrument Schematic - Logic Diagram:Containment Spray Pump Motor Cooler A(Sa). Sheet 154A ML20263M0031982-07-29029 July 1982 Instrument Schematic - Logic Diagram:Ccw Dry Cooling Tower and CCW Surge Tank A(Sa). Sheet 151 ML20263M0061982-07-29029 July 1982 Instrument Schematic - Logic Diagram:Ccw Heat Exchanger A(Sa). Sheet 152A ML20263M0231982-07-29029 July 1982 Instrument Schematic - Logic Diagram:Containment Spray Pump Motor Cooler A(Sa) CCW Outlet Valve. Sheet 154B ML20263M0171982-07-29029 July 1982 Instrument Schematic - Logic Diagram:Ccw Pumps 1A & 2A (Sa). Sheet 153B ML20263M0671982-07-29029 July 1982 Instrument Schematic - Logic Diagram:Hvac Chiller & Emergency Diesel Gen Heat Exchanger B(Sb). Sheet 162A ML20263L9351982-07-22022 July 1982 Instrument Schematic - Logic Diagram:Steam Generator 1 & 2 Main Steam Isolation Valves. Sheet 1C ML20263L9671982-07-22022 July 1982 Instrument Schematic - Logic Diagram:Feedwater to Steam Generators a & B. Sheet 38B ML20263M0871982-06-25025 June 1982 Instrument Schematic - Logic Diagram:Fuel Pool Cooling Pumps A(Sa) & B(Sb) and Heat Exchangers a & B(Sn). Sheet 176A ML20263M5841982-06-25025 June 1982 Instrument Schematic - Logic Diagram:Steam Generator 2 Blowdown System. Sheet 402 ML20263M5811982-06-25025 June 1982 Instrument Schematic - Logic Diagram:Sg Blowdown System Isolation Valves. Sheet 401C ML20263M5761982-06-25025 June 1982 Instrument Schematic - Logic Diagram:Steam Generator 1 Blowdown System. Sheet 401A ML20263M5751982-06-25025 June 1982 Instrument Schematic - Logic Diagram:Auxiliary Feedwater to Steam Generators 1 & 2. Sheet 379C ML20263M5721982-06-25025 June 1982 Instrument Schematic - Logic Diagram:Auxiliary Feedwater to Steam Generators 1 & 2. Sheet 379B ML20263M5701982-06-25025 June 1982 Instrument Schematic - Logic Diagram:Auxiliary Feedwater to Steam Generators 1 & 2. Sheet 379A ML20263M5671982-06-25025 June 1982 Instrument Schematic - Logic Diagram:Motor & Steam Turbine Driven Auxiliary Feedwater Pumps B(Sb). Sheet 378B ML20263M5651982-06-25025 June 1982 Instrument Schematic - Logic Diagram:Motor & Steam Turbine Driven Auxiliary Feedwater Pumps B(Sb). Sheet 378A ML20263M5621982-06-25025 June 1982 Instrument Schematic - Logic Diagram:Motor & Steam Turbine Driven Auxiliary Feedwater Pumps A(Sa). Sheet 377B ML20263M5601982-06-25025 June 1982 Instrument Schematic - Logic Diagram:Motor & Steam Turbine Driven Auxiliary Feedwater Pumps A(Sa). Sheet 377A ML20263M5571982-06-25025 June 1982 Instrument Schematic - Logic Diagram:Condensate Storage Tank X-SA/B Make-Up Valve. Sheet 376B ML20263M5541982-06-25025 June 1982 Instrument Schematic - Logic Diagram:Condensate Storage Tank X-SA/B. Sheet 376A ML20263M0901982-06-25025 June 1982 Instrument Schematic - Logic Diagram:Fuel Pool Cooling Pumps A(Sa) & B(Sb). Sheet 176B ML20263M6131982-06-24024 June 1982 Instrument Schematic - Logic Diagram:Letdown Isolation System. Sheet 701A ML20263M6161982-06-24024 June 1982 Instrument Schematic - Logic Diagram:Letdown Isolation System. Sheet 701B 1983-03-09 |