ML20263J644
From kanterella
Jump to navigation
Jump to search
ML20263J644 | |
Person / Time | |
---|---|
Site: | Satsop |
Issue date: | 01/03/1983 |
From: | ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY, EBASCO SERVICES, INC. |
To: | WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
Shared Package | |
ML20064F801 | List:
|
References | |
3240-2499, B-8973-414-063, B-8973-414-63, NUDOCS 8302230018 | |
Download: ML20263J644 (1) | |
Similar Documents at Satsop | |
---|---|
Category:DRAWINGS
MONTHYEARML20265D2001988-04-13013 April 1988
[Table view]Transformer Yard Sections ML20265D1911985-09-19019 September 1985 Satsop Substation A.C. Station SVC One Line Diagram. Sheet 1 of 1 ML20265D1821985-09-19019 September 1985 Construction One Line Diagram,Satsop Substation. Sheet 1 of 1 ML20265D1871985-03-19019 March 1985 Satsop Substation Plot Plan. Sheet 1 of 1 ML20263B4751983-09-0202 September 1983 Reactor Auxiliary Building CVCS Rupture Restraints & Jet Impingement Barrier. Rev Date Illegible ML20263B2761983-09-0202 September 1983 Reactor Bldg Internal Conc Containment Vessel Support M & R. Sheet 3.No Rev Date ML20263B2851983-09-0202 September 1983 Reactor Bldg Internal Conc Internal Base Conc - M. Sheet 3.No Rev Date ML20259D2191983-07-15015 July 1983 Plot Plan - Category I Structures. No Date ML20259D2231983-07-15015 July 1983 Radioactive Lines After Design Basis Accident Chemical & Volume Control System. Sheet 1 of 3.No Date ML20259D2281983-07-15015 July 1983 Radioactive Lines After Design Basis Accident Chemical & Volume Control System. Sheet 2 of 3.No Date ML20259D2331983-07-15015 July 1983 Marked-up Radioactive Liner After Design Basis Accident Chemical & Volume Control System. Sheet 3 of 3.No Date ML20259D2371983-07-15015 July 1983 Radioactive Lines After Design Basis Accident Safety Injection System. No Date ML20259D2421983-07-15015 July 1983 Radioactive Lines After Design Basis Accident Containment Spray System. No Date ML20263B4431983-05-26026 May 1983 General Arrangement:Reactor Auxiliary Building Sections. Sheet 5 ML20263B4411983-05-26026 May 1983 General Arrangement:Reactor Auxiliary Building Plan at El 335 Ft ML20265D2091983-04-13013 April 1983 Transformer Yard Arrangement Plan ML20265D2041983-04-13013 April 1983 Transformer Yard Sections ML20265D1941983-03-28028 March 1983 230 Kv Underground Tie Line Plan & Profile ML20263B4341983-03-10010 March 1983 Radioactive Lines After Design Basis Accident Containment Spray System ML20263B4301983-03-0909 March 1983 Radioactive Lines After Design Basis Accident Safety Injection System ML20263B4811983-02-25025 February 1983 Architectural Roof Plan ML20263B4841983-02-25025 February 1983 Architectural Details & Sections. Sheet 3 ML20263B2871983-02-25025 February 1983 Reactor Bldg Internal Conc Internal Base Conc - R. Sheet 1 ML20265D2141983-01-27027 January 1983 500 Kv Transmission Line. Sheet 1 of 2 ML20263B4581983-01-14014 January 1983 Reactor Auxiliary Bldg El 335 Ft Cable Trays & Conduits Seismic Supports. Sheet 5 ML20263B4611983-01-10010 January 1983 Break & Restraint Locations Auxiliary Steam and Condensate Piping. Sheet 1 of 5 ML20263B4561983-01-0707 January 1983 Reactor Auxiliary Building El 335 Ft Cable Trays & Conduits Seismic Supports. Sheet 4 ML20263J8351983-01-0303 January 1983 Elementary Wiring Diagram:Solenoid Operated Valves. Sheet 35 of 41.Rev Date Illegible ML20263J9001983-01-0303 January 1983 Elementary Wiring Diagram:Solenoid Operated Valves. Sheet 3 of 41.Rev Date Illegible ML20263J8971983-01-0303 January 1983 Elementary Wiring Diagrams:Solenoid Operated Valves. Sheet 2 of 2.Rev Date Illegible ML20263J8931983-01-0303 January 1983 Elementary Wiring Diagram:Solenoid Valves. Sheet 1 of 2. Rev Date Illegible ML20263J8901983-01-0303 January 1983 Elementary Wiring Diagram:Solenoid Operated Valve. Sheet 2 of 41.Rev Date Illegible ML20263J8871983-01-0303 January 1983 Elementary Wiring Diagram:Electro Pneumatic Valve Index. Rev Date Illegible ML20263J8671983-01-0303 January 1983 Elementary Wiring Diagram:Solenoid Operated Valves. Sheet 24 of 41.Rev Date Illegible ML20263J8641983-01-0303 January 1983 Elementary Wiring Diagram:Solenoid Operated Valves. Sheet 25 of 41.Rev Date Illegible ML20263J8611983-01-0303 January 1983 Elementary Wiring Diagram:Solenoid Operated Valves. Sheet 26 of 41.Rev Date Illegible ML20263J8581983-01-0303 January 1983 Elementary Wiring Diagram:Solenoid Operated Valves. Sheet 27 of 41.Rev Date Illegible ML20263J8521983-01-0303 January 1983 Elementary Wiring Diagram:Solenoid Operated Valves. Sheet 29 of 41.Rev Date Illegible ML20263J5001983-01-0303 January 1983 Elementary Wiring Diagram:General Notes. Revision Date Illegible ML20263J5211983-01-0303 January 1983 Elementary Wiring Diagram:Pump Motor Controls. Sheet 1 of 3.Rev Date Illegible ML20263J6411983-01-0303 January 1983 Sbm Control Switch Development. Rev Date Illegible ML20263J6441983-01-0303 January 1983 Elementary Wiring Diagram:Switch Development. Sheet 1 of 4.Rev Date Illegible ML20263J7181983-01-0303 January 1983 Elementary Wiring Diagram:Electro-Pneumatic Valves. Sheet 3 of 5.Rev Date Illegible ML20263J8081983-01-0303 January 1983 Elementary Wiring Diagram:Pump Motor Controls. Sheet 6 of 9.Rev Date Illegible ML20263J8041983-01-0303 January 1983 Elementary Wiring Diagram:Pump Motor Controls. Sheet 8 of 9.Rev Date Illegible ML20263J8121983-01-0303 January 1983 Elementary Wiring Diagram:Pump Motor Controls. Sheet 4 of 9.Rev Date Illegible ML20263J8181983-01-0303 January 1983 Elementary Wiring Diagram:Motor-Operated Valves. Sheet 1 of 4.Rev Date Illegible ML20263J8221983-01-0303 January 1983 Elementary Wiring Diagram:Solenoid Operated Valves. Sheet 41 of 41.Rev Date Illegible ML20263J8001983-01-0303 January 1983 Elementary Wiring Diagram:Legend and Device Table. Sheet 1 of 2.Rev Date Illegible ML20263J7921983-01-0303 January 1983 Elementary Wiring Diagram:Electro Pneumatic Valve. Rev Date Illegible 1988-04-13 Category:ELECTRICAL DRAWINGS-APPLICANT'S FACILITY MONTHYEARML20265D1911985-09-19019 September 1985
[Table view]Satsop Substation A.C. Station SVC One Line Diagram. Sheet 1 of 1 ML20265D1821985-09-19019 September 1985 Construction One Line Diagram,Satsop Substation. Sheet 1 of 1 ML20265D1941983-03-28028 March 1983 230 Kv Underground Tie Line Plan & Profile ML20263B4581983-01-14014 January 1983 Reactor Auxiliary Bldg El 335 Ft Cable Trays & Conduits Seismic Supports. Sheet 5 ML20263B4561983-01-0707 January 1983 Reactor Auxiliary Building El 335 Ft Cable Trays & Conduits Seismic Supports. Sheet 4 ML20263J8901983-01-0303 January 1983 Elementary Wiring Diagram:Solenoid Operated Valve. Sheet 2 of 41.Rev Date Illegible ML20263J9001983-01-0303 January 1983 Elementary Wiring Diagram:Solenoid Operated Valves. Sheet 3 of 41.Rev Date Illegible ML20263J8971983-01-0303 January 1983 Elementary Wiring Diagrams:Solenoid Operated Valves. Sheet 2 of 2.Rev Date Illegible ML20263J8931983-01-0303 January 1983 Elementary Wiring Diagram:Solenoid Valves. Sheet 1 of 2. Rev Date Illegible ML20263J8871983-01-0303 January 1983 Elementary Wiring Diagram:Electro Pneumatic Valve Index. Rev Date Illegible ML20263J8671983-01-0303 January 1983 Elementary Wiring Diagram:Solenoid Operated Valves. Sheet 24 of 41.Rev Date Illegible ML20263J8641983-01-0303 January 1983 Elementary Wiring Diagram:Solenoid Operated Valves. Sheet 25 of 41.Rev Date Illegible ML20263R3011983-01-0303 January 1983 Reactor Aux Bldg El 390 Ft Cnd Trays & Grd. Sheet 8. Rev Date Illegible ML20263J8611983-01-0303 January 1983 Elementary Wiring Diagram:Solenoid Operated Valves. Sheet 26 of 41.Rev Date Illegible ML20263J8581983-01-0303 January 1983 Elementary Wiring Diagram:Solenoid Operated Valves. Sheet 27 of 41.Rev Date Illegible ML20263J8521983-01-0303 January 1983 Elementary Wiring Diagram:Solenoid Operated Valves. Sheet 29 of 41.Rev Date Illegible ML20263J8491983-01-0303 January 1983 Elementary Wiring Diagram:Solenoid Operated Valves. Sheet 30 of 41.Rev Date Illegible ML20263J8471983-01-0303 January 1983 Elementary Wiring Diagram:Solenoid Operated Valves. Sheet 31 of 41.Rev Date Illegible ML20263J8421983-01-0303 January 1983 Elementary Wiring Diagram:Solenoid Operated Valves. Sheet 33 of 41.Rev Date Illegible ML20263J8391983-01-0303 January 1983 Elementary Wiring Diagram:Solenoid Operated Valves. Sheet 34 of 41.Rev Date Illegible ML20263J8351983-01-0303 January 1983 Elementary Wiring Diagram:Solenoid Operated Valves. Sheet 35 of 41.Rev Date Illegible ML20263J8331983-01-0303 January 1983 Elementary Wiring Diagram:Solenoid Operated Valves. Sheet 37 of 41.Rev Date Illegible ML20263J8301983-01-0303 January 1983 Elementary Wiring Diagram:Solenoid Operated Valves. Sheet 38 of 41.Rev Date Illegible ML20263J8261983-01-0303 January 1983 Elementary Wiring Diagram:Solenoid Operated Valves. Sheet 36 of 41.Rev Date Illegible ML20263J8221983-01-0303 January 1983 Elementary Wiring Diagram:Solenoid Operated Valves. Sheet 41 of 41.Rev Date Illegible ML20263J8181983-01-0303 January 1983 Elementary Wiring Diagram:Motor-Operated Valves. Sheet 1 of 4.Rev Date Illegible ML20263J8121983-01-0303 January 1983 Elementary Wiring Diagram:Pump Motor Controls. Sheet 4 of 9.Rev Date Illegible ML20263J8081983-01-0303 January 1983 Elementary Wiring Diagram:Pump Motor Controls. Sheet 6 of 9.Rev Date Illegible ML20263J8041983-01-0303 January 1983 Elementary Wiring Diagram:Pump Motor Controls. Sheet 8 of 9.Rev Date Illegible ML20263J6851983-01-0303 January 1983 Elementary Wiring Diagram:Pump & Heater Control Index. Sheet 1 of 3.Rev Date Illegible ML20263J5001983-01-0303 January 1983 Elementary Wiring Diagram:General Notes. Revision Date Illegible ML20263J5211983-01-0303 January 1983 Elementary Wiring Diagram:Pump Motor Controls. Sheet 1 of 3.Rev Date Illegible ML20263J6411983-01-0303 January 1983 Sbm Control Switch Development. Rev Date Illegible ML20263J6441983-01-0303 January 1983 Elementary Wiring Diagram:Switch Development. Sheet 1 of 4.Rev Date Illegible ML20263J6931983-01-0303 January 1983 Elementary Wiring Diagram:Pump and Heater Control Index. Sheet 2 of 3.Rev Date Illegible ML20263J6971983-01-0303 January 1983 Elementary Wiring Diagram:Motor-Operated Valve Index. Sheet 1 of 2.Rev Date Illegible ML20263J7061983-01-0303 January 1983 Elementary Wiring Diagram:Switch Development. Sheet 3 of 4.Rev Date Illegible ML20263J7091983-01-0303 January 1983 Elementary Wiring Diagram:Solenoid Operated Valves. Sheet 18 of 41.Rev Date Illegible ML20263J7221983-01-0303 January 1983 Elementary Wiring Diagrams:Pumps. Rev Date Illegible ML20263J7921983-01-0303 January 1983 Elementary Wiring Diagram:Electro Pneumatic Valve. Rev Date Illegible ML20263J7271983-01-0303 January 1983 Elementary Wiring Diagrams:Pumps. Sheet 1 of 3.Rev Date Illegible ML20263J8001983-01-0303 January 1983 Elementary Wiring Diagram:Legend and Device Table. Sheet 1 of 2.Rev Date Illegible ML20263J7181983-01-0303 January 1983 Elementary Wiring Diagram:Electro-Pneumatic Valves. Sheet 3 of 5.Rev Date Illegible ML20263J7251983-01-0303 January 1983 Elementary Wiring Diagrams:Pump. Sheet 3 of 3.Rev Date Illegible ML20263B4541982-12-21021 December 1982 Reactor Auxiliary Building El 335 Ft Cable Trays & Conduits Seismic Supports. Sheet 3 ML20263P7041982-08-31031 August 1982 Power Distribution and Motor Data Sheet 480V Power Center A21,A22,B21 & B22. Sheet 14 ML20263K9471982-08-18018 August 1982 Control Wiring Diagram:Charging Pump 3 Seal Lube System Sheet 2. Sheet 2006 ML20263L7251982-08-18018 August 1982 Control Wiring Diagram:Airborne Radioactivity Removal Air Cleanup Unit CU-2B Fan. Sheet 2737 ML20263L7221982-08-18018 August 1982 Control Wiring Diagram:Airborne Radioactivity Removal Air Cleanup Unit CU-2A Fan. Sheet 2731 ML20263K6451982-08-17017 August 1982 Control Wiring Diagram:Hvac Instrumentation Sheet 1. Sheet 2994 1985-09-19 |