Notifies of Meeting W/Westinghouse to Discuss General Layout & Unique Plant Design Features Due to Large Number of Staff Members Assigned to Review RESAR SP/90.Meeting Will Be Similar to June 1987 Meeting
ML20237K900
Person / Time
Site: 05000601
Issue date: 08/25/1987
From: Kenyon T
Office of Nuclear Reactor Regulation
To: Cheng C, Johnson G, Sellers D
NRC
Shared Package
ML20237K903 List:
References
NUDOCS 8708270336
Download: ML20237K900 (4)


Text

_ _ _ _ _ - .__ _

August 25, 1987

' Docket No. 50-601 {

MEMORANDUM T0: Distribution (See next page) 1 FROM: Thomas J. Kenyon, Project Manager Standardization and Non-Power Reactor Project Directorate '

Division of Reactor Projects III, IV, V and Special Projects, NRR

SUBJECT:

MEETING ON RESAR SP/90 Due to the large number of new staff that have been recently assigned to review RESAR SP/90, I have set up another meeting with Westinghouse to discuss the general layout and unique features of the plant design (see attached i meeting notice). This meeting will be similar to the one held in June 1987.

If you have been recently assioned to this project or missed the earlier meeting, I recommend you attend this general' introduction to the plant design if possible. If you have any questions, I can be reached at X28206.

origina'i signed by Thomas J. Kenyon, Project Manager Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects, NRR

Enclosure:

As stated DISTRIBUTION:

(DocketFile.1 NRC"PDR PDSNP Reading TKeyon EHytlon LRubenstein ).

on P)fh (DSIG LRubenstein 6}on 08/pl/87 T(6)A/87 08 08/g/87 8708270336 870G25 PDR ADOCK 05000601 A PDR

t. -. f August- 25, 1987 l
I . Docket No. 50-601 o

MEM0MNDUM TO: Distribution (See'next page)

FROM: Thomas J. Kenyon, Project Manager Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV,

V and Special Projects, NRR

SUBJECT:

'liEETING ON RESAR SP/90

/

Du to the'1arge number of new staff that have been recently assigned to review RESAR SP/90, I have set.up another meeting with Westinghouse to discuss the general layout and unique features of the plant design (see attached meeting notice).. This meeting will be similar to the one held in June 1987.

If you have been recently assigned to this project or missed the earlier 1

- meeting, I recommend you attend this general introduction to the plant design j if.possible. . If you have any questions I can be reached at X28206. ,

I original aigned by Thomas J. Kenyon, Project Manager

'"~ ^ '

Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects, NRR

Enclosure:

As stated DISTRIBUTION: l Docket File NRC PDR PDSNP Reading TKeyon EHytlon LRubenstein -,

- ,7 P Pp [D ( '

on W on LRubenstein ,

08/pl/87 08 /87 08/gf87 l

i i

J

, e, pH OIG d,' O UNITED STATES 7 -' !

g NUCLEAR REGULATORY COMMISSION' e

ff $; -Q' W ASHINGTON, D. C. 20555 N..+

/ ,

At)G 2 51987 Lf Decket'Wo. 50-601 5

MEMORANDUM T0: Distribution (See next page)

(fhi: Thomas J. Kenyon, Project Manager q Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects, NRR

SUBJECT:

MEETING ON RESAR SP/90 Due to the large number of new staff that have been recently assigned to

. review RESAR SP/90, I have set up another meeting with Westinghouse to discuss

. the general layout and unique features of the plant design (see attached meeting notice). This meeting will be similar to the one held in June 1987.

If you have been recently assigned to this project or missed the earlier meeting, I recommend you attend this general introduction to the plant design if possible. If you have any questions, I can be. reached at X28206.

l l'

l l

omas J. nyon,. Project Manager Standard ation and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects, NRR

)

Enclosure:

As stated

1 4 >

. o. ., .

t, _

L 4 (

s

% V  %-

t L DISTRIBUTION:J C..Y. Cheng G. Johnson 3 D. Sellers T. Marsh +

J. . Bramer ~-t <

S. flou <

. (L ' 83gchi. V ~

.1.'? Rei tir- , i,~

G. Giera,hhch- <

S. Chan: \c ,

j;,:

R. Pichumani xJ' G. Staley -4 C. McCracken - t t J. Wing [ a D. Notley -

't J. Joyce .,.

- F. Bijrrows - . 1 4 FiRosa y. C  : .\ ,,,

J. Knight  ? ,'t'4

~~

, i-N. Trshe+ s,,,{.

J. Craig. e

  • by d'-

.h Wermiel ;A '

-(

D. Schum G4' , , s. _

.kudricks ' .s a .. a v - -

J.'W.

M. Hodges i, *

  • ~<
h. -

R. Fell "

  • k A.-Gill O .- 1 J. Lee h '

C N

J. Raval- '

s s  ?- ~

. . _ . . _ , N. Wagner V .s

  • IN ks H. Walker S R. Jones , -.

S. Diab ,

A. Beech s

? '

F. flaskins J. Spraul 3 W. Regan S. Wiss .

G. lapinsky ,

w 3, R. Erick. son ,i -

R. Dubev $

B. Menecisohn J. Murphy H. Vandermolen i B. Hardir. '

'I R. Barrett ., . ,

A. El-Bassioni

S. Long g L-l T. Dorian L. Rubenstein s P. Leech ' , N ,'

G. Vissing ,

1 ,

i ats ,