ML20213G093

From kanterella
Revision as of 00:14, 20 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Requests Deletion of Parenthetical Expressions Added to 860912 Proposed Change to License Condition 2.C.(25)(b),per 860929 Telcon.Change Proposed to Be Consistent W/Ser Re Tdi Emergency Diesel Generators.Expressions No Longer Necessary
ML20213G093
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 11/07/1986
From: Kingsley O
MISSISSIPPI POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
TAC-61970, NUDOCS 8611170321
Download: ML20213G093 (2)


Text

,

9 MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi EsikhilddiddB P. O. B O X 16 4 0. J A C K S O N, MIS SIS SIP PI 39215-1640 November 7, 1986 O. D. KINGSLEY, JR.

UICE PRESIDENT NUCLE AR OPERATIONS U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D. C. 20555 Attention: Mr. Harold R. Denton, Director

Dear Mr. Denton:

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Revision to PC0L-86/20 Cylinder Block Inspections AECM-86/0341 By letter dated September 12, 1986 (AECM-86/0282) Mississippi Power &

Light (MP&L) Company proposed a change to Operating License Condition (0LC) 2.C.(25)(b). The change was proposed to be consistent with the recommendations contained in the NRC Generic Safety Evaluation Report on TDI Emergency Diesel Generators (EDG) (MAEC-86/0206, dated 6/26/86) by specifying additional controls on maintenance and surveillance activities of key EDG components.

During a teleconference on September 29, 1986, Mr. L. L. Kintner (NRC GGNS Project Manager) requested that the parenthetical expressions added to proposed OLC 2.C.(25)(b), items 3a and 3b (related to cylinder block inspections), be deleted. Based on further review, MP&L agrees with the NRC that the parenthetical expressions are not necessary. Thus, the purpose of this letter is to document MP&L's concurrence with the deletion of the parenthetical expressions on items 3a and 3b of the proposed change to OLC 2.C.(25)(b).

The parenthetical expressions were intended for clarification purposes to address the applicability of MP&L's planned partial inspection of the GGNS Division II EDG during the first refueling outage (RF01) on proposed items 3a and 3b. However, due to availability, the cylinder block inspections required to identify ligament cracks were successfully performed on the Division II EDG during RF01. Therefore, the parenthetical expressions are no longer necessary.

8611170321 861107 O$l gpR ADOCK 05000416 F PDR i 0 J19AECM86102301 - 1 Member Middle South Utilities System

  • AECM-86/0341 Page 2 Based on completion of the required inspections, MP&L requests that the parenthetical expressions on proposed OLC 2.C.(25)(b), items 3a and 3b be deleted.

Yours uly, s

ODK:baa cc: Mr. T. H. Cloninger Mr, R. B. McGehee Mr. N. S. Reynolds l Mr. H. L. Thomas Mr. R. C. Butcher Mr. James M. Taylor, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Dr. J. Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta St. , N. W. , Suite 2900 Atlanta, Georgia 30323 i