On 11/28/07, during Unit 1 Containment Close-out walkdown, the inspectors identified that loose bat insulation had been placed in a 15\' X 5\'
penetration in the \'C\' Loop Room. The insulation had not been found by the licensee during their containment readiness verification walkdown. When the inspectors notified the licensee, they removed two 55 gallon bags which were approximately 45 lbs of fibrous insulation. This issue was documented in the corrective action program as Condition Report CR025641. The walkdown was performed by the inspectors to verify that the containment walkdown conducted by the licensee was in accordance with procedural requirements. Later investigation found that the insulation had been there for a number of years. The inspectors reviewed the affected start-up procedure, 1-GOP-1.7 Rev 2, Unit Startup,
RCS heatup from ambient to HSD and determined that even though the procedure had several steps in attachment 3 to ensure containment was clear of debris and fibrous material, the associated licensee walkdown failed to reveal the presence of the loose insulation. The licensee performed a more thorough walkdown of containment and verified that no other loose material was present. The issues associated with the fibrous material left in containment and the effects on the containment
sump are identified as an unresolved item (
URI) pending additional inspection and review from the NRC. This
URI is designated
05000280/2007005-04, Fibrous Material left in Unit 1 Containment.