Monthly Operating Repts for Jan 1998 for Vogtle Electric Generating Plant,Units 1 & 2
ML20202G544
Person / Time
Site: Vogtle  
Issue date: 01/31/1998
From: Hargis T, Mccoy C
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LCV-1169, NUDOCS 9802200164
Download: ML20202G544 (7)


Text

.-. - .. . _ . -.. .. . - - -

i

, . C. K. McCoy South:rn N:cleer

. , V(e President Operating CompaIy. Inc.

Vogtle Project 40 inverness Cer.ter Parkway

  • ~,,

P0. Box 1235 Birmingham. A!ahama 35201 Tel 206 932.7122 Fax 205 9320403 SOUTHERNk h l COMPANY '

Energy to Serve hurWorld" February 9,1998 LCV-Il69 Docket Nos. 50-424,425 U. S. Nuclear Regulatory Commission ATfN: Document Control Desk Washington, D. C. 20555 Ladies and Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT - JANUARY 1998 Southern Nuclear Operating Company hereby submits the January 1998 monthly operating reports for Vogtle Electric Generating Plant, Units 1 and 2, in accordance with the requirements of Technical Specifications 5.6.4.

Please contact this office if you have any questions.

Sincerciv, C. K. McCoy CKM/afs

Enclosures:

El- VEGP Unit 1 Monthly Operating Report - January 1998 E2- VEGP Unit 2 Monthly Operating Report - January 1998 cc: Southern Nuclear Ooeratinn Comoany Mr. J. B. Beasley, fr.

Mr. M. Sheibani NORMS U. S. Nuclear Renulatory Commiston Mr. L. A. Rcycs, Regional Administrator Mr. D. H. Jaffe, Senior Project Manager, NRR }lf Mr. J. Zeiler, Senior Resident Inspector, Vogtle 9902200164 980131 llllll llllllll l'llll l[ f

- PDR ADOCK 05000424 ..... ..

R PDR

. . - - . . . . . . - - . . . . . . . _ . - - . . - . - - - . - . . . . - . . . . . . . . _ . . - . - ~ . . . _ . ~ . . . - - . - . . .

4 ENCLOSUREI TABLE OF CONTENTS VOGR.E ELECTRIC GENERATING PLANT UNIT I hjONTHLY OPERATING REPORT FOR JANUARY 1998 OPERATING DATA REPORT and CHALLENGES TO PORV and SAFETY VALVES Page El 1 UNIT SHUTDOWNS mnd NARRATIVE REPORT Page El-2

OPERATING DATA REPORT

' Docket No : 50-424 Unit Name: yeGP UNIT 1 Date: Februay 2,1998 Completed By: T.S. Harg:s Telephone: (706) 826 3469 Operating Status

1. Reporting Period; Jan-98
2. Design Electncal Rating (Net MWe): 1169
3. Maximum Dependable Capacity (Net MWe): 1162' IhitMonth YeatlaDate Cumulative
4. Number Of Hours Reactor Was Critical. 744.0 744.0 31,716.0
5. Hours Generator On Line; 744.0 744.0 .v,418 8_
6. Unit Reserve Shutdown Hours: 0.0 0.0 01
7. Net Electrical Energy Generated (MWHe): 881,735 881,735 88,344.047 CHAlt.ENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES D_a_te iTag No. Event Desenption NA NA NA E1-1

. 1 UNIT SHUTDOWNS l Docket No.: 50-424 l Unit Name: VEGP UNIT 1 Date: February 2,1998 Completed By: T.S. Hargis Telephone: (706) 826-3469 Reporting Period: Jan-98 Type Met *iod of lF: Forced Duration Shutting Cause/ Corrective Actions s

No. Date Scheduled (Hours) , Reason (1) Down (2) Comments NA NA NA NA NA NA NA (1) REASON: (2) METHOD:

A Equipment Failure (Explai E Operstor Tranng/ License Examination 1 Manual 4. Continuation B - Maintenance or Test F Administrative 2. Manual Trip / Scram 5. Other C - Refuehng G Operational Error (Explain) 3. Automatic Tnp/ Scram O Regulatory Restriction H Other(Explain)

CAUSE/ CORRECTIVE ACTIONICOMMENTS:

NARRATIVE REPORT January 0100.00 Unit at 100% power with no operating problems.

January 3123:59 Unit at 100% power with no operating problems.

E1-2

t ENCLOSURE 2 TABLE OF CON 11NTS VOG'II.E ELECTRIC GENERATING PLANT UNIT 2 MONTHLY OPERATING REPORT FOR JANUARY 1998 .

OPERATING DATA REPORT and CHALLENGES TO PORV and SAFETY VALVES Pag: E21 UNIT SHUTDOWNS and NARRATIVE REPORT Page E2 2 i

  • OPERATING DATA REPORT

, Docket No.: 50-425 Unit Name: VEGP UNIT 2

. Date: February 2,1998 _

T.S}argis ..

Completed By:

Telephone: E001C26 3469 Operating Status

1. Reporting Period: Jan-98_.
2. Design Electncal Rating (Net M.Ve): 1169
3. Maximum Dependable Capacity (Net MWe): 1167 This_ Month YeaLTo Date Cumulative
4. Number Of Hours Reactor Was Critical: 744 0 744.0 69,567.8
5. Hours Generator On Line: 744.0 744.0 68,903.2 f,, Unit Reserve Shutdown Hours: 00~ 0.0 OT
7. Net Electncal Energy Generated (MWHe): 882,192 882,192 76,468,918 CHALLENGES TO PRESSUR'.JER PORV AND PRESEURIZER SAFETY VALVES Date Tag No. . Event Desenption NA NA NA E2-1

..-ii-.--......,-i.. .. , ,, .

, e

, UNIT SHUTDOWNS

.' Docket No.: 50-425

  • ~

l Unit Name:

, Date: yEG VRiti2 February 3,19 9 8

. Completed By: T}.Hargis_

Telephone: (706) 826-3469 Reporting Period: Jan-G8 Type Method of r Forced Duration Shutting Cause/ Corrective Actions No. !Date 8 8""*8 (Hours) iReanor (1)

Down (2) Comments NA NA NA NA NA NA NA I

(1) REASON: (2) METHOD:

A . E quipment Failure (E mplain) E . Operator Tranng/Ucense Esamination t Manual 4 Continuaten B . Maintenanca or Test F. Administrative 2. Manual inp/S /am 6 Other C . Refueling 0. Operational Error (Explain) 3 Automateinp/ Scram

0. Regulatory Restrction H . Othat (Explain)

CAUSE/ CORRECTIVE ACTIONICOMMENTS:

/

i NARRATIVE REPORT "

January 0100.00 Unit at 100% power with no operating problems, January 3123.59 Unit at 100% power with no operating problems.

e E2-2

,