Forwards Insp Repts 50-327/88-13 & 50-328/88-13 on 880201-19 Re Corrective Actions Performed by Licensee in Response to Findings of Integrated Design Insp (Idi).All Idi Findings Closed But Findings Requiring Resolution Indicated in App a
ML20155D231
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/26/1988
From: Ebneter S
NRC OFFICE OF SPECIAL PROJECTS
To: White S
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20155D236 List:
References
NUDOCS 8806150011
Download: ML20155D231 (4)


See also: IR 05000327/1988013

Text

1

UNITED STATES

f  %,

NUCLEAR REGULATORY COMMISSION

y g

.t WASHINGTON, D. C 20555

..... MAY 2 61988

.

Docket Nos. 50-327/328

Tennessee Vcliey Authority

ATTN: Mr. S. A. White

Manager of Nuclear Power

6N 38A Lookout Place

1101 Market Street

Chattanooga, Tennessee 37402-2801

Gentlemen:

SUBJECT: INSPECTION REPORT N05. 50-327/88-13 AND 50-328/88-13 - INTEGRATED

DESIGN INSPECTION FOLLOW-UP

This letter forwards the results of an inspection of the corrective actions

performed by TVA in response to the findings of the Integrated Design

Inspection (IDI) conducted in TVA's Knoxville offices between February 1 and

February 19, 1988. During this inspection, the team reviewed both the specific

and generic corrective actions associated with the IDI findings that remained

open following our previous inspection that was documented in NRC Inspection

, Report 50-327/87-74 and 50-328/87-74 It should be noted that although all

the IDI findings are indicated as closed, several findings involved licensing

issues which must be resolved by TVA with NRC's Office of Special Projects.

These items then are no longer considered IDI issue's and are closed only for

the purpose of this report. IDI findings requiring resolution by the Office

of Special Projects are so indicated in the issue-specific sumaries contained

in Appendix A to the enclosed report. In addition, for many of the IDI findings

a substantial portion of the corrective actions has been deferred by TVA until

after the restart of Sequoyah Unit 2. In each such instance, the NRC has

reviewed and agrees with the TVA post-restart decision for completion of

corrective action. Such IDI findings were closed by the team by verifying

that the necessary post-restart corrective actions have been entered on TVA's

Corporate Comitment Tracking System (CCTS). The CCTS is used by TVA to track

regulatory comitments and is being relied on by the NRC to provide an

auditable trail to assure that the corrective actions are completed in a,

timely manner.

During the IDI exit meeting on September 11, 1987, the NRC made several general

observations that were programmatic in nature. Thes'e related to: (1) lack of

timely implementation of changes to operating procedures resulting from design

changes; (2) lack of timely corrective action; (3) lack of system integration

and (1) weakness in the design verification process.

8806150011 080526 7

DR ADOCK 0500


_--J

!

'

e j

S. A. White -2- MAY 2 61988

The NRC considers that TVA has taken responsible corrective actions to

alleviate the above programatic concerns. However, it is not possible to

assess the effectiveness of these procedural and organizational changes at

this time. The impact of these changes depends largely on their diligent

implementation by TVA and can only be assessed after they have been implemented

for a sufficient period of time. The NRC recomends that the TVA management

periodically evaluate the effectiveness of their corrective actions to the

NRC's programatic concerns to assure themselves that the corrective actions

are being properly implemented and more importantly, are producing the desired

end results. The NRC also recomends that TVA periodically review their CCTS

to assure that the committed corrective actions are implemented in a timely

manner.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, please contact me or

Mr. Eugene Imbro, (301) 492-0954.

'

Sincerely,

  • / / n

/

'7 94 &g'

Stewart D. Ebneter, Director

Office of Special Projects

Enclosure:

Inspection Report 50-327/88-13

l and 50-328/88-13

l

cc w/ enclosure: See next page

1

l

1

l

!

.

- - . - . - ~ , - , , . - - - - , - - - . , - - , - - -

.

. ,

AIAY 2 61988

Mr. S. A. White

Tennessee Valley Authority Sequoyah Nuclear Plant

SUBJECT: INSPECTION REPORT NOS. 50-327/88-13 AND 50-328/88-13 INTEGRATED

DESIGN INSPECTION FOLLOWUP

Distribution: (w/ encl)

DC5 (Docket Nc. 50-327/328)

PDR

LPDR

OSP R/F

TVA R/F

TVA TP R/F

SEbneter

JAxelrad

SRichardson

BDLiaw

RHermann

KBarr, RII

JPartlow, NRR

BGrimes, NRR

CHaughney, NRR

Elmbro, NRR

FMiraglia, NRR

JFair

TCheng

RShewmaker

JDonohew l

FMcCoy, RII l

BHayes, 01 1

'

SConnelly 0IA

EJordan, AE0D l

JRutberg, 0GC

Inspection Team

Residcat Inspector

ACRS (10)

OGC

TVA.Rockville

a*\ 6,V

/d/ b o\ 40 b

0FC :hRR:RSIB :NRR NRR:D .DR :NRR: 5 :0SP TVA:05P:D :TF CNP

,

.... :.__... g .: g,:RSIB.. M .:: ... .

__:..... ....: ....:..__.......:. . W....

! NAME :EVlmbro:acm :CHaughney :B r' :JGPar  : Rich rdson :SEbneter  : BDL1 w

.....:......__....:.....__......:............:...._____...:.___........:.__........:...........

DATE :5/# f/88 :5/#f/88 :5/ /o/88 :5/1 6 /88 :5/SW/88 :5/3,/88  : 5/ 4 /88

0FFICIAL RECORD COPY ,g}'t'd

-- _ __-_

e s'

,

I

.

Mr. S. A. White ,

Tennessee Valley Authority Sequoyah Nuclear Plant  !

l

CC:

General Counsel Regional Administrator, Region 11

Tennessee Valley Authority U.S. Nuclear Regulatory Commission l

400 West Summit Hill Drive 101 Marietta Street, N.W. I

E11 B33 Atlanta, Georgia 30323

Knoxville, Tennessee 37902

Resident Inspector /Sequoyah NP 1

Mr. R. L. Gridley c/o U.S. Nuclear Regulatory Commission i

Tennessee Valley Authority 2600 Igou Ferry Road

SN 157B Lookout Place Soddy Daisy, Tennessee 37379

Chattanooga, Tennessee 37402-2801 l

Mr. Richard King

Mr. H. L. Abercrombie c/o U.S. GA0

Tennessee Valley Authority 1111 North Shore Drive

Sequoyah Nuclear Plant Suite 225, Box 194

P.O. Box 2000 Knoxville, Tennessee 37919

Soddy Daisy, Tennessee 37379 i

Tennessee Department of Health I

Mr. M. R. Harding and Environment ,

Tennessee Valley Authority ATTN: Director, Bureau of Environment i

Sequoyah Nuclear Plant T.E.R.R. A. Building,1st Floor l

P.O. Box 2000 150 9th Avenue North

Soddy Daisy, Tennessee 37379 Nashville, Tennessee 37219-5404

Mr. D. L. Williams Mr. Michael H. Mobley, Director

Tennessee Valley Authority Division of Radiological Health

400 West Summit Hill Drive T.E.R.R.A. Building, 6th Floor

W10 B85 150 9th Avenue North

Knoxsille, Tennessee 37902 Nashville, Tennessee 37219-5404 l

County Judge Dr. Henry Myers, Science Advisor

Hamilton County Courthouse Committee on Interior

Chattanooga, Tennessee 37402 and Insular Affairs

U.S. House of Representatives

Washington, D.C. 20515

l