. __ - -_ _ _ -
1 1
J l
l Director, Office of Resource Management March Monthly Operating Report Page 1 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50/395 UNIT V. C. SUMER I DATE 4/01/87 COMPLETED BY G. A. LOIGNON TELEPHONE (803) 345-5209 1 MARCH 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)
- 1. 791 17. -11
- 2. 802 18. -8
- 3. 801 19. -4
- 4. 802 20. -12
- 5. 799 21. -8
- 6. 336 22. -8
- 7. -34 23. -8
- 8. -32 24. -8
-8
~
- 9. -32 25.
- 10. -13 26. -8
- 11. -12 27. -11
- 12. -12 28. -11
- 13. -12 29. -7
- 14. -11 30. -7
- 15. -11 31. -7
- 16. -11 kDj40 870333 }
R 05000395 PDR \\
Director, Office of Resource Management March Monthly Operating Report Page 2 ATTACHMENT II OPERATING DATA REPORT DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE 4/01/87 COMPLETED BY G. A. LOIGNON TELEPHONE (803) 345-5209 OPERATING STATUS
- 1. Reporting Period: March 1987 Gross Hours in Reporting Period: 744
- 2. Currently Authorized Power Level (MWt): 2775 Max. Depend. Capacity (MWe-Net): 885 Design Electrical Rating (MWe-Net): 900
- 3. Power Level to Which Restricted (If Any)(MWe-Net): N/A
- 4. Reasons for Restrictions: N/A THIS MONTH YR TO DATE CUMULATIVE
- 5. Number of Hours Reactor Critical 141.2 1557.2 22003.7
- 6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 7. Hours Generator on Line 140.2 1556.2 21547.4
- 8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 9. Gross Thermal Energy Generated (MWH) 333,666 4,149,036 56,543,356
, 10. Gross Electrical Energy (MWH) 109,290 1,366,570 18,776,029
- 11. Net Electrical Energy Generated (MWH) 96,797 1,300,832 17,884,109
- 12. Reactor Service Factor 19.0 72.1 77.3
- 13. Reactor Availability Factor 19.0 72.1 77.3
- 14. Unit Service Factor 18.8 72.0 75.7 1
- 15. Unit Availability Factor 18.8 72.0 75.7
- 16. Unit Capacity Factor (Using MDC) 14.7 68.0 71.0
- 17. Unit Capacity Factor (Design MWe) 14.5 66.9 69.8
- 18. Unit Forced Outage Rate 0.0 0.0 6.4
- 19. Shutdowns Scheduled Over Next 6 Months (Type, Date & Duration of Each):
N/A i
- 20. If Shut Down at End of Report Period, Estimated Date of Startup:
MAY 7,1987
- 21. Units in Test Status (Prior to Commercial Operation): N/A
)
-l .
- i Director, Office of Resource Management March Monthly Operating Report Page 3 ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET N0. 50/395 UNIT V. C. SUMMER I DATE 4/01/87 COMPLETED BY G. A. LOIGNON TELEPHONE (803) 345-5209 MARCH 1987 Method of TYPE Shutting Date F or S Duration Reason Down the Corrective Actions /
No. Reactor or Forced or (Hours) Comments Scheduled Reducing Power 2 870306 S 603.8 C 2 62 DAY OUTAGE
i .
Director, Office of Resource Management March Monthly Operating Report
, Page 4 ATTACHMENT IV NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE 4/01/87 COMPLETED BY G. A. LOIGNON TELEPHONE (803) 345-5209 MARCH 1987 On March 1, 1987, the V. C. Summer Nuclear Station continued to operate at approximately 92% power due to the removal of 'B' Main Feedwater Pump from service on February 24, 1987.
On March 6, 1987, at 0100, a reactor shutdown commenced for the third refueling 4
outage. The plant was held at 60% power to flush oil from the secondary side.
1 On March 6, 1987, at 2010, the plant was taken off line for the outage. The I expected duration of the outage is approximately 62 days.
On March 31, 1987, the reactor remained shutdown.
i t
, , _,__ , . _ _ _ _ , ., . - - - , -- .- - - - . - - --