Text
.
J l
Director, Office of Resource Management March Monthly Operating Report Page 1 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50/395 UNIT V. C. SUMER I DATE 4/01/87 COMPLETED BY G. A. LOIGNON TELEPHONE (803) 345-5209 MARCH 1987 1
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1.
791 17.
-11 2.
802 18.
-8 3.
801 19.
-4 4.
802 20.
-12 5.
799 21.
-8 6.
336 22.
-8 7.
-34 23.
-8 8.
-32 24.
-8
~
9.
-32 25.
-8 10.
-13 26.
-8 11.
-12 27.
-11 12.
-12 28.
-11 13.
-12 29.
-7 14.
-11 30.
-7 15.
-11 31.
-7 16.
-11 kDj40 870333
}
R 05000395 PDR
\\\\
Director, Office of Resource Management March Monthly Operating Report Page 2 ATTACHMENT II OPERATING DATA REPORT DOCKET NO.
50/395 UNIT V. C. SUMMER I DATE 4/01/87 COMPLETED BY G. A. LOIGNON TELEPHONE (803) 345-5209 OPERATING STATUS
- 1. Reporting Period:
March 1987 Gross Hours in Reporting Period:
744
- 2. Currently Authorized Power Level (MWt):
2775 Max. Depend. Capacity (MWe-Net):
885 Design Electrical Rating (MWe-Net):
900
- 3. Power Level to Which Restricted (If Any)(MWe-Net): N/A
- 4. Reasons for Restrictions: N/A THIS MONTH YR TO DATE CUMULATIVE
- 5. Number of Hours Reactor Critical 141.2 1557.2 22003.7
- 6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 7. Hours Generator on Line 140.2 1556.2 21547.4
- 8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 9. Gross Thermal Energy Generated (MWH) 333,666 4,149,036 56,543,356
- 10. Gross Electrical Energy (MWH) 109,290 1,366,570 18,776,029
- 11. Net Electrical Energy Generated (MWH) 96,797 1,300,832 17,884,109
- 12. Reactor Service Factor 19.0 72.1 77.3
- 13. Reactor Availability Factor 19.0 72.1 77.3
- 14. Unit Service Factor 18.8 72.0 75.7 1
- 15. Unit Availability Factor 18.8 72.0 75.7
- 16. Unit Capacity Factor (Using MDC) 14.7 68.0 71.0
- 17. Unit Capacity Factor (Design MWe) 14.5 66.9 69.8
- 18. Unit Forced Outage Rate 0.0 0.0 6.4
- 19. Shutdowns Scheduled Over Next 6 Months (Type, Date & Duration of Each):
N/A i
- 20. If Shut Down at End of Report Period, Estimated Date of Startup:
MAY 7,1987
- 21. Units in Test Status (Prior to Commercial Operation):
N/A
-l.
Director, Office of Resource Management March Monthly Operating Report Page 3 ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET N0.
50/395 UNIT V. C. SUMMER I DATE 4/01/87 COMPLETED BY G. A. LOIGNON TELEPHONE (803) 345-5209 MARCH 1987 Method of TYPE Shutting F or S Duration Down the Corrective Actions /
No.
Date Reason Forced or (Hours)
Reactor or Comments Scheduled Reducing Power 2
870306 S
603.8 C
2 62 DAY OUTAGE
i.
Director, Office of Resource Management March Monthly Operating Report Page 4 ATTACHMENT IV NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50/395 UNIT V. C. SUMMER I DATE 4/01/87 COMPLETED BY G. A. LOIGNON TELEPHONE (803) 345-5209 MARCH 1987 On March 1, 1987, the V. C. Summer Nuclear Station continued to operate at approximately 92% power due to the removal of 'B' Main Feedwater Pump from service on February 24, 1987.
On March 6, 1987, at 0100, a reactor shutdown commenced for the third refueling outage. The plant was held at 60% power to flush oil from the secondary side.
4 On March 6, 1987, at 2010, the plant was taken off line for the outage. The 1
I expected duration of the outage is approximately 62 days.
On March 31, 1987, the reactor remained shutdown.
i t
--