ML20206B844

From kanterella
Revision as of 15:46, 11 December 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Design Calculation Review Insp Repts 50-327/87-06 & 50-328/87-06 on 870202-13.No Violations Noted
ML20206B844
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 04/08/1987
From: Ebneter S
NRC OFFICE OF SPECIAL PROJECTS
To: White S
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20206B848 List:
References
NUDOCS 8704100064
Download: ML20206B844 (2)


See also: IR 05000327/1987006

Text

,

? i

-

DCs

  1. ^

o UNITED STATES

8" o NUCLEAR REGULATORY COMMISSION

i e

{ ,$ WASDHNGTON, D. C. 20046

s...../ m,w

.

Docket Nos.: 50-327, 50-328

License Nos.: DPR-77, DPR-79 i

Tennessee Valley Authority

ATTN: Mr. Steven A. White

Manager of Nuclear Power

6N 38A Lookout Place

1101 Market Street

Chattanooga, Tennessee 37402-2801

l Gentlemen:

! SUBJECT: SEQUOYAH DESIGN CALCULATION REVIEW: REPORT NOS. 50-327/87-06

AND 50-328/87-06

This letter forwards the inspection report associated with the Sequoyah

design calculation review inspection performed at your Knoxville,

Tennessee, offices from February 2 to 13,1987.

.

Mr. J. M. Taylor's letter to you dated March 5, 1987, provided our

characterization of the observations included in the ins)ection report.

We have received your response to this letter dated Marc 113,1987 and

will factor this information into our next inspection.

Our next planned inspection of your calculation review program is

tentatively scheduled for the last week of April 1987. As a part of

our inspection we intend to review the corrective actions associated

with our inspection report observations and associated with the findings

generated as a result of the technical audit conducted by your Engineering

Assurance group.

l

Should you have any questions concernin

,

me or Mr. Steven D. Richardson at (301)g this inspection,

492-7761 please contact

of this office.

Sincerely,

!

4%.1 ls. (k i

.[gtewartD.Ebneter, Director

TVA Projects Division

Office of Special Projects

Enclosure:

Inspection Report 30-327/87-06

and 50-328/87 06

i

cc w/cnclosure: See next page

n704toco64 070400

PDH ADOCK 03000327

0 PDR

i

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

' '

.o .

Mr. S. A. White

Tennessee Valley Authority Sequoyah Nuclear Plant

l

cc:

Tennessee Department of Public Regional Administrator; Region II

Health U.S. Nuclear Regulatory Commission,

ATTN: Director, Bureau of 101 Marietta Street, N.W., Suite 2900

Environmental Health Services Atlanta, Georgia 30323

Cordell Hull Building

Nashville, Tennessee 37219

W. C. Drotleff

ATTN: J. A. Raulston Mr. Michael H. Mobley, Director

Tennessee Valley Authority Division of Radiological Health

400 West Summit Hill Drive, W12 A12 T.E.R.R.A. Building

Knoxville, Tennessee 37902 150 9th Avenue North

, Nashville, Tennessee 37203

, Mr. Bob Faas

I Westinghouse Electric Corp. County Judge

'

P.O. Box 355 Hamilton County Courthouse '

<

Pittsburgh, Pennsylvania 15230 Chattanooga, Tennessee 37402

i .

R. L. Gridley

. Tennessee Valley Authority

SN 1578 Lookout Place

Chattanooga, Tennessee 37402-2801

, M. R. Harding *

l Tennessee Valley Authority

i Sequoyah Nuclear Plant

P.O. Box 2000 -

{

Soddy Daisy, Tennessee 37379

Resident Inspector /Sequoyah NPS

. "- c/o U.S. Nuclear Regulatory Commission

'

2600 Igou Ferry Road

-

Soddy Daisy, Tennessee 37379 ~

!

l ' l

l

4

. I

i

1

F e

l

l

l

.