ML20206D347
| ML20206D347 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 11/09/1988 |
| From: | Counsil W, Woodlan D TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| CP-85-39, TXX-88773, NUDOCS 8811170051 | |
| Download: ML20206D347 (1) | |
Text
_-
k/
'\
__. = File # 10110
= c 903.10 7UELECTRIC Ref. # 10CFR50.55(e) m=j,Cg, November 9, 1988 :
, U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555
SUBJECT:
COMANCHEPEAKSTEAMELECTRICSTATION(CPSES)
DOCKET NOS. 50-445 AND 50-446 EQUIPMENT CONDUIT INTERFACE SDAR: CP-85-39 (SUPPLEMENTAL REPORT)
L Gentlemen:
On January 11, 1988, we notified you via our report logged TXX-88035 of the
, corrective actions to resolve this item. Our last report was logged TXX-88447 dated May 13, 1988. This report is submitted to advise you of the revised -
corrective actions for this deficiency. '
TXX-88035, Attachment 1, Page 1 of 1, listed nine (9) cabinets requiring rework. Additional engineering review has concluded that five (5) of those
, cabinets are acceptable without rework. Two of these five (5) cabinets are e
the two installed in Unit 2. Therefore, no Unit 2 corrective action is required for this SDAR.. The remaining rework for Unit I has been completed.
Very truly yours, I ib b
, W. G. Counsil l I
, By:
l D. R. Woodlan Docket Liunsing Manager RSB/mlh i l
c - Mr. R. D. Martin, Region IV ;
Resident inspectors, CPSES (3) !
[
i GG11170051 es11o9 gDR ADOCK 05000445
/1 f j y .
j _,_ _ , u , , - r, _ ,,.,,