6 s nn w usavc., e .a, wno m eo m n.ar., eu m m 3 November 14, 1997 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Dear Sir:
In the Matter ot ) Docket No. 50-260 Tennessee Valley Authority )
BROWNS FERRY NUCLEAR PLANT (BFN) - SPECIAL REPORT ON INOPERABLE HIGH RANGE PRIMARY CONTAINMEN4 RADIATION MONITOR This Special Report is being submitted in accordance with Technical Specification (TS) 3. 2 . F, Table 3.2.F, Note (7) and TS 6.9.2. This report informs NRC that a Unit 2 High Range Primary Containment Radiation Monitor (HRPCRM) has been inopetable for more than seven (7) days. The containment high-range radiation monitors were installed in response to NUREG-0737, Clarification of TMI Action Plan Requirements, Item II . F.1. 3. The purpose of these monitors is to detect gross fuel failures after an accident.
There are two HRPCRMs (2-90-272C and 2-90-273C) in the drywell on elevation 582. On October 31, 1997, one of the HRPCRMs
!. 2-90-27 2 C ) was declared inoperable due to a downscale indication. A downscale indication is the rcsult of a failed monitor or the monitor is not sensitive enough. At this time, HRPCRM (2-90-273C) is operable and capable of detecting gross fuel failures after an accident. The Post-Accident Sampling System (PASS) also provides a redundant method for detecting .
gross fuel failures, through both the sampling of primary 3/'
system coolant and the containment atmosphere. -jf I
0}
ll 9711240287 N P ^" " 971114* PJ . lillil.lil.RI.RR!Iltil w_.
I f
U.S. Nuclear Regulatory Commission Page 2 November 14,1997 The'immediate corrective actions taken for HRPCRM 2-90-272C (1) changed out the monitcr chassis,- (2) : tested -
-include:
coaxial cable from the monitor chassis to-the detector using a Time Domain Reflectometer, (3) repaired. rear connector of the monitor chassis, and (4) took continuity measurements-of the cable from its shielding to ground an'd-from the center
~
conductor to shield / ground using an electrometer and a digita]
multimeter. Based on these corrective actions, the root cause of the inoperable HRPCRM continues to be indeterminate.-
However, the most probable cause is a component / cable' failure inside the drywell. During power operations, the.drywell atmosphere is required to be inerted. Hence, additional troubleshooting within the drywell is not possible at this time.
TVA plans to repair / replace the detector or its associated cable the next time BFN has a forced Unit 2 outcge of sufficient duration in which ti.e drywell is entered, or the l next Unit 2 refueling outage, whichever comes first.
If you have any questions regarding this report, please contact me at (205) 729-2635, 4 Spacelely, O
W T. E. ey _
Manager Lic sing .
and Ind stry Affairs !
P - -
. .+
5 l
U.S. Nuclear-Regulatory Commission Page 3 November 14, 1997 cc:' Mr. Mark S.-Lesser, Branch Chief ~
- U.S. Nuclear Regulatory Commission
- Region II 61 Forsyth Street S.W.
Suite 23T05 Atlanta, Georgia 30303 NRC Resident Inspector ,
Browns Ferry Nuclear Plant- -
10833 Shaw Road .
Athens, Alabama 35611 Mr. Luis A. Reyes Regional Administrator U.S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street S.W.
Suite 23T85 Atlanta,-Georgia 30303 Mr. J. F. Williams, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 a
e _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ - _ .