ML20199J615

From kanterella
Revision as of 06:59, 19 November 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Proposed Tech Specs,Changing Period of Time That Portable gamma-sensitive Ion Chamber Utilized as Temporary Substitute,Provided That Substitute Can Be Monitored by Reactor Operator
ML20199J615
Person / Time
Site: Dow Chemical Company
Issue date: 01/29/1998
From:
DOW CHEMICAL CO.
To:
Shared Package
ML20199J606 List:
References
NUDOCS 9802050362
Download: ML20199J615 (1)


Text

_ __-

C e

s, .

Applicability These specifications apply to the radiation monitoring information available to the reactor operator during operation of the reactor.

Obiectiu The objective of these specifications is to ensure that the reactor operator has adequate information to assure safe operation of the reactor.

Snecifications A Continuous Air Monitor (CAM)(with readout meter and audible alarm) to measure radioactive particulates in the reactor room must be operating during operation of the reactor.

The Area Monitor (AM)(with readota meter and audible alarm)in the reactor room must be operating during operation of the reactor or when work is being done on or around the reactor core or experimental facilities. During short periods of repair to this monitor, not to exceed sixty days, reactor operations or work on or around the core or experimental facilities may continue while a portable gamma-sensitive ion chamber is utilized as a temporary substitute, provided that the substitute can be monitored by the reactor operator.

Bases The radiation monitors provide information of existing levels of radiation and air-bome radioactive materials which could endanger operating personnel or which could warn of possible malfunctions of the reactor or the experiments in the reactor.

Anwndmen;Na 8 9802050362 980129 n-PDR ADOCK 05000264 V PDR

_ _ _ . _ _ . I