NUREG-0800, Notice of Issuance & Availability of Revised SRP Sections 9.2.1 & 9.2.2 of NUREG-0800, SRP for Review of SARs for Nuclear Power Plants

From kanterella
Revision as of 06:19, 19 November 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notice of Issuance & Availability of Revised SRP Sections 9.2.1 & 9.2.2 of NUREG-0800, SRP for Review of SARs for Nuclear Power Plants
ML20199K006
Person / Time
Issue date: 06/24/1986
From: Harold Denton
Office of Nuclear Reactor Regulation
To:
References
RTR-NUREG-0800, RTR-NUREG-800 NUDOCS 8607080482
Download: ML20199K006 (4)


Text

. l U. S. NUCLEAR REGULATORY COMMISSION NUREG-0800 i

1

" STANDARD REVIEW PLAN FOR THE REVIEW 0F SAFETY j ANALYSIS REPORTS FOR NUCLEAR POWER PLANTS" NOTICE OF ISSUANCE AND AVAILABILITY REVISED SRP SECTION 9.2.1 AND SECTION 9.2.2 The U. S. Nuclear Regulatory Commission (NRC) has published a revision to SRP Section 9.2.1, " Station Service Water System" and to SRP Section 9.2.2,

" Reactor Auxilia.] Cealing Water System" of NUREG-0800, " Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants," LWR Edition (SRP).

The revision consists of SRP Section 9.2.1, Rev. 4 and Section 9.2.2, Rev. 3.

The revised SRP Sections incorporate the resolution of Generic Issues 36,

" Loss of Service Water (Calvert Cliffs, Unit 1)." These revisions ao not incorporate any new guidelines or requirements. These SRPs were clarified to alert reviewers to evaluate whether interconnected trains could lead to the total loss of all service water cooling. The acceptance criteria were also ,.

changed to clarify that all requirements of General Design Criterion 4 (missiles, pipe whip, jet loads and environmental conditions) and not just l

flow instabilities have to be met. All changes to the SRP Sections are identifi ed by lines in the margins of the revised SRP sections.

The revised SRP sections are effective immediately. A copy is expected to be availablo in the Public Document Room within two weeks. Copies of the revised SRP Sections or of the complete Standard Review Plan, NUREG-0800, Accession No. PD-81-920199, are available for purchase from the National Technical Information Service, 5285 Port Royal Road, Springfield, Virginia 22161; telephone (703) 487-4650.

Dated at Bethesda, Maryland this 24th day of June, 1986.

FOR THE NUCLEAR REGULATORY COMMISSION

/ k Harold R. Denton, Director Office of Nuclear Reactor Regulation t