OPERATING DATA REPORT-DOCKET N0. 50-336 DATE 1/7/88 COMPLETED BY J. Gibson-TELEPHONE (203) 447-1791-Extension 4431' OPERATING STATUS
- 1. l Unit Name: Millstone Unit 2 l Notes: Items 21 and 22 .l
- 2. Reporting Period: December, 1987 l cumulative are weighted . l'
- 3. Licensed Thermal Power (MWt): 2700 l averages. - Unit operated l
- 4. Nameplate Rating (Gross MWe): 909 lat 2560 MW Thermal prior l
S. Design Electrical Rating (Net MWe):'870 Ito its uprating-to the l
- 6. Maximum Dependable Capacity-(Gross MWe):888.75l current 2700 MWTH power l_
- 7. Maximum Dependable Capacity (Net MWe): 857.25-l level -1
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons: N/A
- 9. Power Level To Which Restricted, If Any (Net MWe): N/A
- 10. Reasons For Restrictions, If Any: N/A ;
This Month Yr.-to-Date . Cumulative
- 11. Hours In Reporting Period 744 8,760 105,336-
- 12. Number Of Hours Reactor Was Critical 722.5 8,242 77,380.3
- 13. Reactor Reserve Shutdown Hours 0 0 2,205.5
- 14. Hours Generator On-Line 720.8 8,180.1 73,253
- 15. Unit Reserve Shutdown Hours 0 0 468.2
- 16. Gross Thermal Energy Generated (MWH) 1,879,773 21,767,398 204,562,262
- 17. Gross Elec. Energy Generated (MWH) 612,900 7,154,100- 60,871,579
- 18. Net Electrical Energy Generated-(MWH) 590,443 6,892,531 58,676,538
- 19. Unit Service Factor 96.9 93.4 69.5
- 20. Unit Availability Factor 96.9 93.4= 70.0
- 21. Unit Capacity Factor (Using MDC Net) 92.6 91.8 65.4
- 22. Unit Capacity Factor (Using DER Net) 91.2 90.4 64.4 ,
- 23. Unit Forced Outage Rate 0.0 6.4 15.2
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Currently in E0C 8 Refueling and Maintenance outage: -12/31/87: Duration approximately 8 weeks
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: March, J38
- 26. Units In Test Status (Prior to Commercial' Operation): Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 8801140349 871231 PDR ADOCK 05000336 I
,R DCD I /
_ - - . . ~. - - -. -
- s. .
AVERAGE DAILY UNIT POWER LEVEL, DOCKET NO. 50-336 UNIT Millstone 2 DATE 1/7/88 COMPLETED BY J.'Gibson TELEPHONE (203) 447-1791 Extension 4431-MONTH OECEMBER, 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 855 17 827 2 854 18 822 ,
3 853 19 814 4 853 20 812 ,
5 853 21 806 6 852 22 802 7 852 23 797 ,
8 853 24 793 9 854 25 788 ,
t 10 855 26 784
{
11 855 27- 780 l
12 851 28 775 ;
t 13 846 29 770 14 842 30 705 15 837 31 0 16 832 INSTRUCTIONS On this format, list the-average daily unit power level in HWe-Net for each~ day l in the reporU ng month. Compute to the nearest whole megawatt.
P 5
e
-r y 4e , - - ~ - , - , , -es- -ve y - --w+-
DOCKET.NO. 50-336 .
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Millston 2 DATE 1/7/88-COMPLETED BY J. Gibson -
REPORT MONTH DECEMBER, 1987 TELEPHONE-(203) 447-1791 Extension 4431 l No. Date Type l Duration Reason 2 Method of Licensee System Component Cause & Corrective l (Hours) Shutting Event Code 4 Code 5 Action to Down Reactor 3 Report # Prevent Recurrence i
8 12/31/87 S 23.2 C 1 N/A N/A N/A Unit currently-in E0C 8 refueling outage 1 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions-5: Scheduled A-Equipment Failure (Explain). 1-Manual. for Preparation of Data
. B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee.
C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued from (NUREG-0161)
E-Operator Training & License Examination previous month F-Administrative 5-Power Reduction. s G-Operational Error (Explain) (Duration =.0) Exhibit 1 - Same Source H-Other (Explain) 6-Other (Explain)
. _ _ _ _ . -. _ . = _ _ -- -. _
REFUELING INFORMATION REQUEST
- 1. Name of facility: Millstone 2
- 2. Scheauled date for next refueling shutdown: Currently in E0C 8 refueling outage
- 3. Schedule date for restart following refueling: March, 1988
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
None at this time
- 5. Scheduled date(s) for submitting licensing action and supporting information:
None at this time
- 6. Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed aesign or performance analysis methods, significant changes in fuel design, new operating procedures:
None
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) In Core: (a) 217 (b) 512
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
Currently 1277
- 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
1994, Spent Fuel Pool Full Core off load capacity is reached 1998, Core Full, Spent Fuel Pool Full 2009, Spent Fuel Pool, Full Core off load capacity is reached-contingent upon license approval to store consolidated fuel.
l
UTILITIES cenerai Offices . seiden street. Berlin, Connecticut 1 sYd EsYaNcUu5. P.O. 00X 270
- ** wea wa ** HARTFORD, CONNECTICUT 06141-o270 l k k J N((Y.5[1Y2,"~. (203) 665-5000 January 8, 1988 MP-11333 Re: 10CFR50.71(a)
U.S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555
Reference:
Facility Operating License No. DPR-65 Docket No. 50-336
Dear Sir:
This letter is forwarded to provide the report of operating and shutdown experience relating to Millstone Unit 2 Monthly Operating Report 87-12 in accordance with Appendix A Technical Specifications, Section 6.9.1.3.
One additional copy of the report is enclosed.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY h $W dtD Ste hen E. Scace Station Superintendent Millstone Nuclear Power Station SES/GN:1fg cc: W.T. Russell, Region I Administrator D.H. Jaffe, NRC Project Manager, Millstone Unit No. 2 W.J. Raymond, Senior Resident Inspector, Millstone Unit Nos. 1, 2 & 3 I