Forwards Insp Rept 99901034/85-01 on 851021-24 & Notice of Nonconformance
ML20151T630
Person / Time
Issue date: 02/04/1986
From: Zech G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Benke J
DIETERICH STANDARD CORP.
Shared Package
ML20151T634 List:
References
REF-QA-99901034 NUDOCS 8602100325
Download: ML20151T630 (3)


Text

-

u

  1. pn neo g'o, UNITED STATES E ~ 7, NUCLEAR REGULATORY COMMISSION

{ i. wAsmNGTON, D. C. 20555

'g ***** ,o February 4, 1986 D:cket No. 99901034/85-01 Dietrich Standard Corporation ATTN: Mr. James L. Benke President Post Office Box'9000 Boulder, Colorado 80301 Gentlemen:

This refers to the inspection conducted by R. Correia and P. Prescott of this

~

office on October 21-24, 1985, of your facility in Boulder, Colorado and to the discussions of our findings with members of your staff at the conclusion of the inspection. This was the first inspection of the Dietrich Standard Corporation conducted by the NRC.

The purpose of this inspection was to evaluate Dietrich Standard Corporation's quality assurance and engineering activities .in general and specifically those.

related to the design, procurement, manufacturing, inspection and testing of a safety-related replacement flow element for the Ft. Calhoun Station component cooling water system. Areas examined during the inspection and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.

During the inspection it was found that the implementation of your QA program failed to meet certain NRC requirements. The findings demonstrate a weakness by Dietrich Standard to implement your quality assurance program in the areas of nonconforming components, design control.and quality assurance records. The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.

Please provide us within 30 days from the date of-this letter a written statement containing: (1) a description of steps that have been or will be taken to correct these items; (2) a description of steps that have been or will be taken to prevent recurrence; and (3) the dates your corrective actions and preventive measures were or will be completed. Consideration may be given to extending your response time for good cause shown.

The responses requested by this letter are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork j Reduction Act of 1980, PL 96-511. O t

S. 8602100325 860204 01N h original dommment not available se me cartified b llMW b o

Dietrich Standard Corporation February 4,1986 In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document-Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, n

c t-Gary t.' Zech, Chief Vendor Program Branch Division of Quality Assurance, Vendor, and Technical Training Center Programs Office of Inspection and Enforcement

Enclosures:

1. Appendix A-Notice of Nonconforman~ce
2. Appendix B-Inspection Report 99901034/85-01.
3. Appendix C-Inspection Data Sheets (2 pages) cc w/ enclosures:

Omaha Public Power District ATTN: Mr. R. L. Andrews Division Manager, Nuclear Production 1623 Harney Street Omaha, Nebraska 68102 Commerical Union Insurance Company ATTN: Mr. John Gouldman, ANI Post Office Box 17590 Denver, Colorado 80217 Dietrich Standard Corporation ATTN: M. G. Anderson QA Manager 5601 N. 71st Street Boulder, Colorado 80310

s

.. O Dietrich 5tandard Corporation February 4,1986 American Society of Mechanical Engineers Accreditation Department, Mail Stop 8A 345 East 47th Street New York, New York 10017 Northeast Nuclear Energy Company ATTN: Mr. John F. Opeka Senior Vice President Nuclear Engineering & Operations Post Office Box 270 Hartford, Connecticut 06141-0270 Georgia Power Company ATTN: Mr. Donald Foster Vice President and Project General Manager Rt. 2, Box 299A Waynesboro, Georgia 30830 DISTRIBUTION:

@ :IE:09 VPB Reading DQAVT Reading RVollmer JStone LParker JWCraig RCorreia (S)

PJPrescott EJohnson, Region IV P. Harrell, SRI, Ft. Calhoun RStarostecki, Region I TRebelowski, SRI, Millstone RWalker, RII

-WSanders, SRI, Vogle ETourigny, NRR EDoolittle, NRR MMiller, NRR

  • D' T VF T :DQAVT ' B:00AVT RC :tt GGZech BKGr s r

01/3r/86 J1/2 (/86 0}/p/86 01/ /6

-