Forwards Insp Rept 50-285/85-21 on 850901-30.No Violation or Deviation Identified
ML20151Y906
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 02/10/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Andrews R
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20151Y909 List:
References
NUDOCS 8602130215
Download: ML20151Y906 (2)


See also: IR 05000285/1985021

Text

~

7, ;j - - 'i

-

.5

' ' *

., ,. ,

p F , FEB I 0192

,_

'

In Reply Refer To:

P Docket: 50-285/85-21 .a

-

r. -

, ' Omaha Public Power District

ATTN: R. L. Andrews, Division Manager -

-

n  :-

'

Nuclear Production

1623 Harney Street

Omaha, Nebraska . 68102

, -

p ,

Gentlemen:

~

This-refers to'the inspection conducted by Messrs. L. A. Yandell and R. A.

Caldwell of this office during the period September 1-30, 1985, of activities -

authorized by NRC Operating License DPR-40 for Fort Calhoun Station, and to the

discussion of our findings with you and other members 'of your staff at the

conclusion of the inspection.

Areas examined during the inspection included operational safety verification,

surveillance testing, and allegation followup. Within these areas, the .

'

'

inspection consisted of selective examination of procedures and representative '

records, interviews with personnel, and observations-by the inspectors. These

findings are documented in the enclosed inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

'

WeL apologize for any inconvenience that may have been caused by ' late issuance

of this report. Should you have any questions concerning this inspection ~, we

will be pleased to discuss them with you.

Sincerely,

,

yccUnal vs.a of

J. E. Gagliardo, Chief

Reactor Projects Branch

-

Enclosure: "

Appendix - NRC Inspection Report

50-285/85-21

cc (see page 2)

%

RIV:C:EP& PS

EP&Sh -E0 t4 RPS/Bh C:RPB, /

LYandell: .

ACaldw M.KEmerson DMHunnicutt JEGagl rdo

01/i,o /86 01/3o/ 6 G)/$/86 0F6 /86 pf/ 7 i8

v

0602130215 060210 5

PDR ADOCK 0500

  • gg51

lis

.. . . . - . _. - -.

._

. ,7

?i ..

_ ._

5

Omaha Public Power District -2-

.

cc'w/ enclosure:

W. G. Gates, Manager

Fort Calhoun Station

P.O. Box 399

Fort Calhoun, Nebraska 68023'

Harry'H. Voigt,'Esq.

LeBoeuf, Lamb, Leiby & MacRae

-1333 New Hampshire Avenue, NW

-Washington, DC 20036

Kansas Radiation Control Program Director

Nebraska Radiation Control Program Director

bec to DMB (IE35)

bec distrib. by RIV:

  • RPB-
  • R&SPB

'*RIV File

*RSB
  • Resident Inspector
  • Section Chief (RPB/B)

DRS&P.

l R. D. Martin, RA

  • MIS System

i

'

  • RSTS Operator-
  • D. Weiss, LFMB ( AR-2015)

l *R. Caldwell

'

  • L. A. Yandell

R. L. Bangart

  • w/766

!'

l

!-

l

l

_. _ . _ - - _ _ - _ . - . _ . - - - - _ - _ _ - - _ - - - _ _ _