ML20154Q918
ML20154Q918 | |
Person / Time | |
---|---|
Issue date: | 06/01/1988 |
From: | Beckjord E NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES) |
To: | Stello V NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
Shared Package | |
ML20154Q921 | List: |
References | |
REF-GTECI-086, REF-GTECI-093, REF-GTECI-126, REF-GTECI-136, REF-GTECI-NI, TASK-086, TASK-093, TASK-1.D.4, TASK-126, TASK-136, TASK-2.E.4.3, TASK-86, TASK-93, TASK-OR, TASK-TM NUDOCS 8806070164 | |
Download: ML20154Q918 (3) | |
Text
)
pn ueu -
- UNITED STATES
[T g(/(kg NUCLEAR REGULATORY COMMISSION g iW j W ASHING TON, 0. C. 20555 t A ;'t.. /
1, 1988 MEMORANDUh FOR: Victor Stel1% 1r., Executive Director for Operations j FROM: Eric S. Beckjord, Director, Office of Nuclear Regulatory Research ,
SUBJECT:
GENERIC ISSUE MANAGEMENT CONTROL SYSTEM - SECOND OVARTER FY-88 UPDATE l l
Enclosdd is the Second Quarter FY-88 update of the Generic Issue Management Control System (GIMCS) for your information. This report contains the
'ollowing highlights:
(1) Four generic safety issues (GSIs) were resolved during the reporting l period:
z86(Nearly-Resolved) long Range Plan for Dealing with Stress Corrosion Cracking in BWR Piping
[G f93 (HIGH) Steam Binding of Auxili$ry Feedwater Pumps I.D.4 (MEDIUM) Control Room Design Standard II.E.4.3(HIGH) Containment Integrity Check (2) Three GSIs were prioritized during the reporting period:
125.11.13 (DROP) Operator Job Aids 126(LicensingIssue! Reliability of PWR Main Steam Safety Valves 136(Resolved) Storage and Use of large Quantities of Cryogenic Combustibles on Site (3) Nine USIs and 51 GSIs remained to be resolved at the end of March 1988. Of these issues, 5 USIs and 13 GSIs are scheduled for resolution in FY-88 (see Table 4).
D 8806070164 880601 PDR GTECI GNI s
Victor Stello, Jr. 2 DON 1 1999 Four issues have already slipped beyond the Five-Year Plan completion dates by approximately three months and the schedule cannot be remedied. Six issues are projected to slip beyond the completion dates specified in the Five-Year Plan by about six months. We plan to take corrective action to put these issues back on a schedule consistent with the Five-Year Plan.
I shall continue to keep you informed quarterly of progress in resolving all outstanding generic issues as well as any major problems that surface during the course of resolving these issues. -
. L Eric S. Beckjord Director Office of Nucle'a Regulatory Research
Enclosure:
Generic Issue Management Contrcl System cc: See next page O '
O
O l
d DON 011988
)
cc: w/ enclosure i RES NRR C Alexander, NL/S-169 J. Partlow, 9A2 N. Anderson, NL/S-217A S. Varga, 14E4 R. Baer, NL/S-217A P. Leech, 11H3 R. Bosnak, NL-007- W. Hadges, 8E23 F. Cherny, NL/S-217A A. Thadani, 7E4 F. Coffman, NL/N-316 F. Hebdon, 12020 R. Emrit, NL/S-169 J. Hannon, 10D18 R. Frahm, NL/S-169 P. Polk, 11H22 W. Houston, NL-007 E. Merschoff, EWS312 J. Hulman , NL/S-324 J. Norberg, BE2 T. King, NL/S-169 R. Dudley, 13A2 K. Kniel, NL/N-344 S. Bajwa, 11H22 G. Mazetis, NL/N-344 W. Schwink, 12D20 A. Dipalo, NL/S-129 P. Cota, 12D20 B. Sheron, NL-007 R. Cleveland, 12D20 W. Minners, NL-007 F. Gillespie, 12G18 A. Murphy, NL/S-302 T. Murley, 12G18
- q J. Murphy, NL-372 J. Sniezek, 12G18 P. Horian, NL/N-344 T. Kenyon, 11H3 B. Morris, NL-007 L. Riani, NL-007 D. Ross, NL-007 Z. Rosztoczy, NL-007 G. Arlotto, NL-007 C. Serpan, NL/S-217C L. Shotkin, NL/N-353 M. Silberberg, NL/S-314 D. Sullivan, NL/S-217B T. Speis, NL-00'/
J. Wilson, NL/S-169 A. Eiss, NL-007 G. Marino, NL-007 A. Marchese, NL-007 AEOD ARM UTrieltemes C Hartfield, 7602 G. Lanik, WWS-207 W. Usilton, P-612 l B. Richter, NL-007 B. St. Mary, P-612 D. Adams, ACRS, H-1016 S. Duraiswamy, ACRS (6), H-1016 J. Kopeck, MNBB-3217 p
H. Schecter, IP, 3H-5
{V)E.Heumann,MNBB-12217 PDR eDCSdD w .- .- .