ML20155A813
| ML20155A813 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak, Allens Creek |
| Issue date: | 09/28/1988 |
| From: | Counsil W, Woodlan D TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| CP-87-115, TXX-88700, NUDOCS 8810060088 | |
| Download: ML20155A813 (1) | |
Text
- *
- .ma MM Log # TXX-88700 1
File # 10110 903.7 7t# ELECTRIC Ref. # 10CFR50.55(e)
Wileleat G. Coumeil 6""""""^""""
September 28, 1988 !
U. S. Nuclear Regulatory Commission Attn: Document Control Oesk ,.
Washington, D. C. 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 SE!SMIC ANALYSIS OF SERVICE WATER INTAKE STRUCTURE SDAR: CP-87-115 (SUPPLEMENTAL REPORT) l Gentlemen:
On February 4,1988, TV Electric letter loLJed TXX-88055 provided notification of a reportable deficiency involving a modeling error for seismic analysis of the service water intake structure. A similar problem was noted for seismic Category I concrete tanks. This report is submitted to provide the current i status of this issue. '
TXX-88055 indicated that Unit 1 corrective actions would be completed by i September 28, 1988. The completion date of September 28, 1988 was not met. l TU Electric's next report regarding the status of the corrective action completion dates for this issue will be submitted no later than November 30, i 1988.
i Very truly yours, (M.Co.
W. G. Counsil i
By: O D. R. Woodlan Docket I h ensiny Manager CBC/mlh i
c-Mr. R. D. Martin, Region IV [
Resident Inspectors CPSES (3) 8810060088 880928 ) t .
FfDR ADOCK0500g5 ; , g I
4 i 400 North Ok Street LB 81 Delles. Texas 1H01
!