Update on NRR Radiation Protection Activities - Overview (ML20206K856)
Kevin Hsueh, Chief Radiation Protection and Consequence Branch Division of Risk Assessment Office of Nuclear Reactor Regulation 2020 NEI Radiation Protection Forum August 12, 2020 1
Lessons Learned / Impact of COVID-19
- NRC working to collect and document lessons learned regarding impact of COVID-19
- General areas
- Employee safety
- Telework
- Remote oversight
- Licensing actions 2
Lessons Learned / Remote Inspections
- NRC working to collect and develop lessons learned regarding remote inspections
- Pre-view
- Modifications to inspection program necessary to accommodate site access restrictions
- Remote inspections are appropriate and effective in certain applications
- May require enhanced licensee support 3
Part 37 - Physical Protection of Category I/II Materials
- Goal is to fully incorporate Part 37 oversight into the Public Radiation Safety Cornerstone of the ROP
- Status
- Part 37 incorporated into the baseline inspection procedures (IP71124.08)
- Regional-based reactor HP inspectors have been trained
- Staff is developing SDP for Part 37
- Use enforcement policy until SDP is complete
- Goal to complete SDP by Fall 2020 4
ROP Related Documents Development & Update
- 2020 Inspection Procedure Update (IP71124)
- Public Radiation Safety Significance Determination Process (IMC 0609, App D and associated basis)
- Incorporate Part 37
- Update transportation SDP
- Occupational Radiation Safety SDP (IMC 0609, App C and associated basis)
- Administrative updates 5
Regulatory Guide Updates
- RG 1.21 on Measuring, Evaluating and Reporting Effluents and Solid Waste, draft rev 3
- Include acceptable calibration methods for accident-range gaseous effluent monitors
- Draft RG to be issued for comment in Fall 2020
- RG 8.34 on Monitoring and Calculating Dose, draft rev 1
- Guidance on dose calculations and prospective dose assessments
- Draft RG to be issued for comment in Spring 2021 6
Major Upcoming Activities in 2020
- Draft RG 1.21 issued for public comment - Fall
late Summer
- Public meeting on SDP - Fall 7
NRC Panel Discussion
- Kevin Hsueh, BC, NRR
- Anthony Dimitriadis, BC, RI
- Binoy Desai, BC, RII
- Steve Orth, BC, RIII
- Greg Warnick, BC, RIV 8