ML20128H910

From kanterella
Revision as of 20:38, 23 August 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Provides Requested Reanalysis to NRC Which Indicates That Some DACs Will Remain Far Below SBO Temp Limits for Duration of Postulated SBO Event.Rev 1 to Calculation M-73-116 Encl
Date released: 05/21/2020 Download: ML20128H910


Rev 1 to M-73-116, Room Temp Response During Station Blackout.
ML20128H918
Person / Time
Site: San Onofre 
Issue date: 01/20/1993
From:
SOUTHERN CALIFORNIA EDISON CO.
To:
References
Download: ML20128H918 (331)
Provides Requested Reanalysis to NRC Which Indicates That Some DACs Will Remain Far Below SBO Temp Limits for Duration of Postulated SBO Event.Rev 1 to Calculation M-73-116 Encl
ML20128H909
Person / Time
Site: San Onofre 
Issue date: 02/12/1993
From: Marsh W
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML20128H909 (2)