ML20128L997

From kanterella
Revision as of 16:31, 23 August 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rev 0 to Procedure SPDS-DST-001, SPDS Dynamic Simulation Test Plan Per 850612 Commitment Re NUREG-0737, Item I.D.2.Test Scheduled for Late Aug.Results Will Be Submitted to NRC by 851004
Date released: 05/21/2020 Download: ML20128L997


Rev 0 to Procedure SPDS-DST-001, SPDS Dynamic Simulation Test Plan.
ML20128M002
Person / Time
Site: Clinton Constellation icon.png
Issue date: 06/14/1985
From:
ILLINOIS POWER CO.
To:
References
Download: ML20128M002 (16)
Forwards Rev 0 to Procedure SPDS-DST-001, SPDS Dynamic Simulation Test Plan Per 850612 Commitment Re NUREG-0737, Item I.D.2.Test Scheduled for Late Aug.Results Will Be Submitted to NRC by 851004
ML20128L992
Person / Time
Site: Clinton Constellation icon.png
Issue date: 07/09/1985
From: Spangenberg F
ILLINOIS POWER CO.
To: BUTLER W R
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-1.D.2, TASK-TM
Download: ML20128L992 (2)