ML20134E562

From kanterella
Revision as of 00:50, 21 August 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Mgt Meeting Rept 50-336/85-26 on 850718.Meeting to Discuss Measures Taken to Assure That All Design Changes Made During Recent Outage Accomplished & Verified.Facility Operation Can Resume
Date released: 05/27/2020 Download: ML20134E562


Mgt Meeting Rept 50-336/85-26 on 850718.Major Areas Discussed:Changes Made During Recent Outage,Including Spray Valve Controller Design Change
ML20134E576
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/07/1985
From: Mccabe E, Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
References
Download: ML20134E576 (20)
Forwards Mgt Meeting Rept 50-336/85-26 on 850718.Meeting to Discuss Measures Taken to Assure That All Design Changes Made During Recent Outage Accomplished & Verified.Facility Operation Can Resume
ML20134E560
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/13/1985
From: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: OPEKA J F
NORTHEAST NUCLEAR ENERGY CO.
References
Download: ML20134E560 (2)