ML20134M775

From kanterella
Revision as of 11:46, 20 August 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-346/96-05 on 960611-0814.Two Violations of NRC Requirements Were Identified Concerning Issues Initially Reviewed During Previous Insp
Date released: 05/27/2020 Download: ML20134M775


Insp Rept 50-346/96-05 on 960611-0814.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support
ML20134M832
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/19/1996
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
References
Download: ML20134M832 (31)
Notice of Violation from Insp on 960611-0814.Violation Noted:Polar Crane Was Used to Lift Reactor Vessel Head Lifting Rig Over Open Reactor Vessel on 960416
ML20134M804
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/19/1996
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
References
Download: ML20134M804 (2)
Forwards Insp Rept 50-346/96-05 on 960611-0814.Two Violations of NRC Requirements Were Identified Concerning Issues Initially Reviewed During Previous Insp
ML20134M772
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/19/1996
From: Caldwell J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: WOOD J K
CENTERIOR ENERGY
References
Download: ML20134M772 (3)