ML20136H886

From kanterella
Revision as of 07:19, 19 August 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Responds to FOIA Request for Two Specified Repts to Be Placed in Pdr.App Identifies Two Repts Placed in PDR
Date released: 05/29/2020 Download: ML20136H886


Analysis of Station Blackout Transient at Seabrook Nuclear Power Plant.
ML20136H916
Person / Time
Site: 05000000
Issue date: 09/30/1984
From: Bayless P, Chambers R
EG&G IDAHO, INC.
To:
NRC
References
CON-FIN-A-6354, FOIA-85-503, REF-GTECI-A-44, REF-GTECI-EL, TASK-A-44, TASK-OR
Download: ML20136H916 (78)
Analysis of Station Blackout Transient for Bellefonte PWR, Draft Preliminary Rept for Comment
ML20136H908
Person / Time
Site: 05000000
Issue date: 04/30/1984
From: Dobbe C
EG&G IDAHO, INC.
To:
NRC
References
CON-FIN-A-6354, FOIA-85-503, FOIA-850503, REF-GTECI-A-44, REF-GTECI-EL, TASK-A-44, TASK-OR
Download: ML20136H908 (54)
Responds to FOIA Request for Two Specified Repts to Be Placed in Pdr.App Identifies Two Repts Placed in PDR
ML20136H882
Person / Time
Site: Bellefonte Tennessee Valley Authority icon.png
Issue date: 07/27/1985
From: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
To: SHOLLY S C
UNION OF CONCERNED SCIENTISTS
References
FOIA-85-503, REF-GTECI-A-44, REF-GTECI-EL
Download: ML20136H882 (2)