ML20137S091

From kanterella
Revision as of 04:44, 18 August 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 86-001-00 Re Chemical & Vol Control Sys Pump Inoperable for More than 72 H.Decision to Repair Pump to Stop Leakage Resulted in Pump Being Declared Inoperable
Date released: 05/30/2020 Download: ML20137S091


:on 860105,during Mode 1,chemical & Vol Control Sys Pump 1B Inoperable More than 72 H.Caused by Delay in Pump Repair.Repairs Completed.Memo to Maint Personnel Re Matl Handling Will Be Written
ML20137S094
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 02/04/1986
From: Day J
DUKE POWER CO.
To:
References
Download: ML20137S094 (4)
Forwards LER 86-001-00 Re Chemical & Vol Control Sys Pump Inoperable for More than 72 H.Decision to Repair Pump to Stop Leakage Resulted in Pump Being Declared Inoperable
ML20137S089
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 02/04/1986
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
Download: ML20137S089 (1)