ML20138K513

From kanterella
Revision as of 02:33, 17 August 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Safety Evaluation Accepting Util 840731 & 850306 Proposed Revised Sections III.G.3 & Iii.L of 10CFR50,App R Re Alternate Shutdown Capability W/Identified Mods & Compensatory Measures
Date released: 05/31/2020 Download: ML20138K513


Safety Evaluation Concluding That Util Proposed post-fire Alternate Shutdown Design Meets Requirements of 10CFR50,App R,Sections III.G.3 & Iii.L W/Proposed Mods & Interim Measures & Acceptable
ML20138K521
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 10/15/1985
From:
Office of Nuclear Reactor Regulation
To:
References
Download: ML20138K521 (6)
Forwards Safety Evaluation Accepting Util 840731 & 850306 Proposed Revised Sections III.G.3 & Iii.L of 10CFR50,App R Re Alternate Shutdown Capability W/Identified Mods & Compensatory Measures
ML20138K508
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 10/15/1985
From: Butcher E
Office of Nuclear Reactor Regulation
To: WITHERS B D
PORTLAND GENERAL ELECTRIC CO.
References
Download: ML20138K508 (2)