Interim Deficiency Rept Re Cracks in Internal Pressure Relief Valve Mfg by Wkm.Caused Unknown.B&W & Wkm Valve Group Are Preparing Repair/Insp Program.Repairs & Addl Examinations Performed Under Licensee Direction
ML20125D716
Person / Time
Site: Washington Public Power Supply System
Issue date: 01/07/1980
From:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
Shared Package
ML20125D715 List:
References
NUDOCS 8001150471
Download: ML20125D716 (3)


Text

I

. 1 1

l Attachment A WNP-1/4 Docket Nos. 50-460 and 50-513 Reportable Condition 10CFR50.55(e)

WKM Valve Cracks INTERIM REPORT

Background

B&W notifi.ed WPPSS on October 8,1979 of a defective condition which existed in the internal WNP-1/4 reportability (pressure relief valve of this of theisWKM defect beingmanufactured evaluated byvalves B&W).being Due supplied to this for defect, all valves manufactured by WKM were shipped back to their factory in Houston for repair and WPPSS took this opportunity to perform the ASME Sec. XI visual exam of the large Sec. III, Cl 1 valves in WKM's factory.

This examination revealed numerous linear indications in the conduit region of five (5) of the eight (8) valves examined and arc strikes on the gate and segment of six (6) valves.

Description of Deficienc_y Unacceptable linear indications were subsequently confirmed on six (6) of the eight (8) valves through the use of liquid penetrant examination. These valves are:

1-DHR-V23A and 24B, and 4-DHR-V23A, 24B, 25A, 26B. B&W and WKM also informed WPPSS of cracks which were detected in valve 4-CFS-V31A. These cracks were confirmed by WPPSS and the WPPSS ANI and found to be extensive. The cause of these problems is unknown; however, adequate inspection would have identified the conditions during the manufacturing process.

Safety Implications All rejectable indications and cracks found, to date, are in valves located in safety systems (Low Pressure Injection (LPI) and Core Flood System (CFS)). Failure of these valves in service due to a loss of pressure boundary integrity could result in; a) a loss of reactor coolant (DHR valves),

b) loss of borated water in the core flood tank c) an inability of the systems to mitigate the consequences cf a LOCA type accident.

The subject condition also represents deficiencies as described under both i and iii of10CFR50.55(e).

Corrective Action Taken Since these valves have already received an ASME N stamp, they fall under the juris-diction of ASME XI and WPPSS, as the Owner, has the responsibil.ity for all future examination and repair.

90022s49 8 0 01150 4 ~T l

Attachment A Page 2 l

Corrective Action Taken (Cont'd)

B&W and WKM are presently preparing the repair / inspection program for submittal to WPPSS. The repairs and additional examinations will be performed by B&W and WKM under WPPSS direction.

Further inspection on all WKM manufactured valves supplied to WPPSS is being planned.

90022,50 1

{

_ --___. _ _ _ - - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ . - _ . _ _ _ _ _ _ _ _ _ . _ _ _ _ . . _ ______.____---_-___._--_-___________D

\

'/ . . */ .. *-~"* ___ _ _ - - -= -"~ ~

. %s .

BC

e. .- l'q.

);

f j

v a /

- ,U' TZI2 COPY 3.A.hS C AI, pg s m -

,i p' , ' ' 2- /

)

', jl' 8d

'n Y, j '

D/

h y

TO: 2. L. **T. BRING

  • tsnNcroS PU3'IC. PC'.T.R SL7?LT ST5 TEM M h e. *.'ASEIS:"TH

. 509: 377-2740, Verif7, it.07 FRCX: E. 1. STElt:-a - Ixt. 2158 12/19/79 NO. OF PAGES i

( ) FI,Us a gz37 sggg; r

NCfI'E :

I? T'-2?.E IS A Pro m IUR;33 -

??.UiSMISSION ca IF Iur to scy! r%~u~~~v3 COMPI.ETE, FIZASE CALL (604) 3FA 5111, ~

2742 CR EIT. 3711.

Yr.A N K l'CG ......

90022,51 4

er O Arruwneor 13

  1. es,