Proposed Tech Specs Revising TS Table 4.8-1,DG Test Schedule,To Eliminate Requirement to Increase Testing Frequency Upon Experiencing Five or More Failures in Last 100 Valid Tests
ML20126E192
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 12/22/1992
From:
WOLF CREEK NUCLEAR OPERATING CORP.
To:
Shared Package
ML20126E174 List:
References
NUDOCS 9212290049
Download: ML20126E192 (2)


Text

.

4 Attachment IV to NA 92-0121 Page 1 of 2 Attachment IV Proposed Technical Specification Changes 3

9212290049 921222 PDR -ADOCK 05000482 P -pop

e

' , ' . 'oAttachment Page 2 of 2 IV to NA 92-0121 TABLE 4.8-1 ,

'I DIESEL GENERATOR TEST SCHEDULE

  • men s

NUMBER OF FAILURES IN NUhBER OF FAILURES ,W ,

LAST 20 VALID TESTS

  • LAST100 VALIO JE$TS* TEST FREQUENCY l

<1 'N/ At least once per 31 days

> 2**

[(( /,x_, 4s N

>5 \ At least once per 7 days y'l .

L,,%.. - -

M LFTS  !

-r

~

j

  • Criteria for determinin'g number of valid failures and number of valid tests '

shall.be in accordance with Regulatory Position C.2.e of Regulatory-

~

Guide.l.108, Revision 1, August 1977 .but determined on a per-diesel generator basis. For the purposes of determining the required test frequency, the pre-vious test failure count may be reduced to zero if a complete diesel overhaul to like-new conditions is completed, provided that the overhaul including:

-appropriate post maintenance operation and testing, is specifically approved.

by the manufacturer, and if acceptable reliability has-been demonstrated.

reliability criterion shall be the successful completion of 14-consecutive-. The tests in a single series. . Ten of these tests shall-be in accordance with Specifications 4.8.1.1.2a.4 and 4.8.1.1.2a.5, four tests.: in accordance with' Speci fication 4.8.1.1. 2f. If this criterion is not satisfied during the-first ~

serie: of tests, any alternate criterion to be used to transvalue the failure ,

count to zero requires NRC approval.

    • The associated test frequency shall be maintained-until seven consecutive-f ailure free tests.have been performed and the number of failures in the last ?0 valid tests has been' reduced to-one.

WOLF CREEK UNIT 1 3/4 8-7 AmendmentNo.[- .