ML20127M097

From kanterella
Revision as of 18:09, 9 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Provides Status Rept on Differing Professional Opinion of Tg Dunning.Deliberations Nearing Completion.Rept Being Finalized.Formal Rept Expected No Later than 920817
ML20127M097
Person / Time
Issue date: 08/03/1992
From: Jerome Murphy
NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
To: Sniezek J
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
Shared Package
ML20127M067 List:
References
NUDOCS 9301280108
Download: ML20127M097 (1)


Text

'

'. #7 ffgn aveg*'o, UNITED ST ATES gg '

q

  1. ' ,n NUCLE AR REGULATORY COMMISSION '" W

)3 wo.sntno t on. o. c. tosss -f

-b-

$ < ,c _

\,

J EUG c 9 r" MEMORANDUM FOR: James H. Sniezek, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research FROM: Joseph A. Murphy, DP0 Panel Chairman 1 Division of Systems Research Office of Nuclear Regulatory Research

SUBJECT:

STATUS REPORT - DIFFERING PROFESSIONAL OPINION Of T. DUNNING' As requested by the memorandum from J. Snieze; dated June 12, 1992, we (J. Murphy, R. Barrett, and J. Craig) are reviewing the Differing Professional +

Opinion (DPO) submitted to the EDO by Thomas Dunning on June 10, 1992. We met as a panel on June 30, and July 16, 1992, and met with Mr. Dunning on July 23, 1992. J. M. Cutchin, IV, OGC, attended our meeting with Mr. Dunning and has provided counsel, as needed. Our deliberations are nearing completion, and we are in the process of finalizing our report. We expect to forward our formal report to you no later than August 17, 1992.

($oseph A. Murphy OP0 Panel Chairman cc: R. Barrett, NRR J. Craig, NRR J. M. Cutchin IV, OGC T. Dunning, NRR Enclosure 6 9301280108 921228 PRR MISC PDR

.9301280098