ML20128P355
| ML20128P355 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 10/11/1996 |
| From: | Dyer J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Hagan J ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20128P361 | List: |
| References | |
| NUDOCS 9610170231 | |
| Download: ML20128P355 (5) | |
See also: IR 05000416/1996015
Text
_ _ _ _ ~ . .m.__ ._ . _ . . . _ . . _ . _ . . _ _ . ._,_.__.__.__...m. _. _.._ ._m._
.
l .
!
- "%i, UNITED STATES
f s,, . .,
NUCLEAR REGULATORY COMMISSION
l
5 . k./ ) gi RE GloN IV
l ' 611 RYAN PLAZA DRIVE, SulTE 400
%,
l
.....# ARLINGTON, TEXAS 76011 8064 1
'
l
!
OCT I i 1996
i
l
J. J. Hagan, Vice President . *
Operations - Grand Gulf i
Entergy Operations, Inc.
P.O. Box 756
Port Gibson, Mississippi 39150
I
.
SUBJECT: NRC INSPECTION REPORT 50-416/96-15
l
Dear Mr. Hagan: i
An NRC inspection was conducted August 18 through September 28,1996, at your Grand
l Gulf Nuclear Station facility. The enclosed report presents the scope and results of that
inspection.
1
During the 6-week period covered by this inspection period, your conduct of activities at l
the Grand Gulf facility was generally characterized by safety-conscious operations, sound ,
, engineering and maintenance practices, and careful radiological work controls.
1
i in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter :
l and its enclosure will be placed in the NRC Public Document Room. l
'
r
i
Should you have any questions concerning this inspection, we will be pleased to discuss l
them with you. l
l Sincerely,
fet J. E. Dyer, Director
i Division of Reacto Projects
i
i Docket No.: 50-416
. License No.: NPF-29
t Enclosure:
!. NRC Inspection Report
l 50-416/96-15
i
I
l
1
9610170231 961011
PDR ADOCK 05000416
0 PDR .
&
, _ - . . , _ _ _ _ , .._ _ ..__ . - . _
.__ ._ _ __ _._._..__.. _. . _. . _ _ _ _ _ _ _ _ . _ _ _ _ _ . _ . _ . .
.
.
.
l
,
Entergy Operations, Inc. -2-
l
!
'
cc w/ enclosure:
Executive Vice President
l and Chief Operating Officer
i Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
l
l Wise, Carter, Child & Caraway
P.O. Box 651
Jackson, Mississippi 39205
l Winston & Strawn
l 1400 L Street, N.W. - 12th Floor
Washington, D.C. 20005-3502
,
- Sam Mabr,, Director
l Division of Solid Waste Management
l Mississippi Department of Natural
l Resources
P.O. Box 10385
Jackson, Mississippi 39209
!
President
l Claiborne County Board of Supervisors
l Port Gibson, Mississippi 39150
i
! Mr. Rod Rogers 68-7
Bechtel Power Corporation
.
Nuclear Operating Plant Services
l 9801 Washington Boulevard
j Gaithersburg, Maryland 20878-5356
l
l
l
General Manager
Grand Gulf Nuclear Station
Entergy Operations, Inc.
P.O. Box 756
l Port Gibson, Mississippi 39150
The Honorable William J. Guste, Jr.
,
Attorney General
'
Department of Justice
State of Louisiana
P.O. Box 94005
Baton Rouge, Louisiana 70804-9005
i
!
!
. - . . ~ _ . . - - - . -. . . . - . . . . . . - - - - . . - - . . - . . . - - . - . . - . . -
.
.
.
Entergy Operations, Inc. -3-
Office of the Governor
State of Mississippi
Jackson, Mississippi 39201
Mike Moore, Attorney General
Frank Spencer, Asst. Attorney General
l
State of Mississippi
- P.O. Box 22947
Jackson, Mississippi 39225
Dr. F. E. Thompson, Jr.
State Health Officer -
l State Board of Health
I- P.O. Box 1700
Jackson, Mississippi 39205
Eddie S. Fuente, Director
State Liaison Officer
Division of Radiation Health
Mississippi Department of Health
P.O. Box 1700
Jackson, Mississippi 39215-1700
i Vice President
l Operations Support
' Entergy Operations, Inc.
. P.O. Box 31995
Jackson, Mississippi 39286-1995
Director, Nuclear Safety
and Regulatory Affairs
Entergy Operations, Inc.
P.O. Box 756
Port Gibson, Mississippi 39150
Vice President, Operations
Grand Gulf Nuclear Station
Entergy Operations, Inc,
P.O. Box 756
Port Gibson, Mississippi 39150
l
l
1
l
i
l
i
f
1'
i . . - . . . _ -
. , ,
. _-- .__
.
'
,
OCT I i 1996
Entergy Operations, Inc. -4-
E-Mail report to D. Nelson (DJN)
E-Mail report to NRR Event Tracking System (IPAS)
bec to DMB (IE01)
bec distrib. by RIV:
L. J. Callan Senior Resident inspector (River Bend)
DRP Director DRS-PSB
Branch Chief (DRP/D) MIS Systern
Project Engineer (DRP/D) RIV File
Branch Chief (DRP/TSS) Leah Tremper (OC/LFDCB, MS: TWFN 9E10) ,
Resident Inspector (Grand Gulf) I
i
.
)
l
l
l
I
DOCUMENT NAME: R:\ GG\GG615RP. JET
To receive copy of document, indicatejn band'C" = Copy without enclosures "E" = Copy with enclosures N" = No copy
SRI C:DQ ul4M D:DRP hp ,
JETeprow . P H Fja k k!f g JEDye W f
10M /96 10/Q /96~ 10/ [/ /96
'
OFFICIAL RECORD COPY
,~ 1
,
1 .
.
OCT I l 1996
Entergy Operations, Inc. -4-
E-Mail report to D. Nelson (DJN) .
E-Mail report to NRR Event Tracking System (IPAS)
M EDM8]@jj;f
bec distrib. by RIV: l
l
L. J. Callan Senior Resident inspector (River Bend)
DRP Director DRS-PSB
Branch Chief (DRP/D) MIS System
Project Engineer (DRP/D) RIV File I
Branch Chief (DRP!TSS) Leah Tremper (OC/LFDCB, MS: TWFN 9E10) '
Resident inspector (Grand Gulf)
&
T
1
,
DOCUMENT NAME: R:\_GG\GG615RP. JET
To receive copy of document, indicate in box: ".C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
SRI C:DRP/p , a <,. U D:DRP Q ,
)
l JETegirow , PHHa((41f A JEDye W f
10hti96 10/G /96 10/ [/ /96
i '
OFFICIAL RECORD COPY
)
170006 3 i
_ ._ - .