ML20129A824
ML20129A824 | |
Person / Time | |
---|---|
Issue date: | 07/27/1982 |
From: | Dircks W NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
To: | Haynes R, James Keppler, James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
Shared Package | |
ML20127B114 | List: |
References | |
FOIA-85-351 NUDOCS 8507270279 | |
Download: ML20129A824 (1) | |
Text
/
PDRol6 July 27,1982 HEMORNIDUM FOR: Ronald C. Haynes, Regional A6ainistrator, Region I .
James P. O'Reilly, Regional Administrator, Region II James G. Keppler, Regional Administrator, Region III John T. Collins, Regional Administrator, Region IV Robert H. Engelken, Regional Administrator, Region V FR0ft: William J. Dircks Executive Director for Operations
SUBJECT:
DELEGATION OF SUBPOENA AUTHORITY Effective this date, I am redelegating to you the authority given to me on July 20, 1982 by the Comission to issue subpoenas during the course of investigations or inspections. This authority is automatically redelegated to whomever you may designate as acting in your authorized absence. In the event you wish to exercise this authority, you must advise me of your intent, and the rationale thereof, through DEDROGR, a minimum of three days in advance of use. DEDROGR, in turn, will acquire ELD concurrence. Emergency situations demanding less notice will be dealt with as necessary.
This delegation is limited by the requirement that during an initial trial j period of about 10 cases I must advise the Comission in advance of the .
i exercise of this authority. During this trial period DEDR0GR will keep track of requests, assure that the Commission is informed, and request elimination of the restriction when the trial case limit has been reached.
FJped)Wilkm L Dircks William J. Dircks Executive Director for Operations cc: V. Stello, DEDR0GR G. Cunningham, ELD R. DeYoung, IE J. Fitzgerald, 01
,m O\
/ 1 72 g ? 850610 GARDE 85-351 PDR